Repair
6.4 |
Renovation
6.5 |
Alteration
6.6 |
Reconstruction
6.7 |
Change
of Use 6.3 1 |
Addition
6.32 |
| Certain
Materials Prohibited/ Required (6.4 through 6.7) |
|
|
c |
|
d |
e |
| Not
diminish structural strength, system capacity (6.4
through 6.7) |
|
|
c |
|
d |
e |
| Materials
& Methods (6.8) |
|
 |
c |
 |
d |
e |
New
Building Elements Comply with UCC
(6.9) |
|
|
c |
 |
d |
e |
| Basic
Requirements a
(6.10 through 6.30) |
|
|
|
 |
To
be determined according to Hazard Index d |
e |
| Supplemental
Requirements b |
|
|
|
 |
d |
e |
| Special
Change of Use Requirements |
|
|
|
|
To
be determined according to Hazard Index |
|
Notes:
| a
|
Apply
only to the work area of the project. |
| b |
Apply
to the work area of the project but may
apply beyond. |
| c |
Cannot
reduce the level of compliance with the
Basic Requirements. |
| d |
Any
other work voluntarily undertaken in connection
with a change of use must comply with the
requirements of the appropriate category.
|
| e |
Work
in the existing building must comply with
the requirements of the appropriate category.
The addition itself must comply with the
subcodes for new construction and cannot
extend the size of the building beyond the
limits allowed by this subcode. |
|