| Landfill Disruption Requirements (SW05) |
| Requirement Description |
Compliance Status |
Compliance Comments |
| LANDFILL DISRUPTION REQUIREMENTS. |
|
|
| Was written approval obtained prior to disruption of the landfill? [N.J.A.C. 7:26-2A.8(j)1] |
|
|
| Did the approval request include an operational plan stating area involved, the depth of the excavation with final grades, estimated cubic yards of material to be excavated, the site where excavated material is to be redeposited, and the estimated time required for completion of excavation procedures? [N.J.A.C. 7:26-2A.8(j)2] |
|
|
| Is excavation consistent in size with the amount of equipment used for digging/haulage and kept to the smallest practical area? [N.J.A.C. 7:26-2A.8(j)3] |
|
|
| Are adequate measures taken during excavation to control dust, odors, fires, rodents, insects, blowing litter, surface water run-off and erosion? [N.J.A.C. 7:26-2A.8(j)4] |
|
|
|
|
|
|