This report is provided in response to a request by the Concerned
Citizens Coalition of Long Branch (CCC) for monthly updates from
the Site Remediation and Waste Management Program (SRWM) on work
conducted and planned at four areas associated with the former Long
Branch Manufactured Gas Plant (MGP). These areas are:
• the former MGP (including the former Conrail properties,
eastern off-site property, and former Jerry Morgan Park)
• the off-site portion of Troutmans Creek that flows north
of the MGP
• residential areas where the community has expressed concern
about potential soil contamination (Long Branch Avenue, Seaview
Avenue, Grant Court and Ellis Avenue)
• the former Seaview Manor housing complex
All work is consistent with NJDEP’s Technical Requirements
for Site Remediation, which were developed to ensure remedial actions
protect human health and the environment.
For historical information about activities that NJDEP and NJNG
have conducted at these areas, please refer to the monthly updates
NJDEP has provided to CCC since January 2005. The updates are available
at http://www.nj.gov/dep/srp/community/highlights.htm.
For more information, see NJDEP’s Environmental Justice web
page at http://www.nj.gov/dep/ej.
|
1) Long Branch Plant
Red Brick Building
Based on its review of NJNG’s Remedial Investigation Report (RIR)
and Addendum Letter for this area, NJDEP has determined that additional
soil sampling must be conducted to verify that the volatile organic compounds
(PCE and TCE) and polycyclic aromatic hydrocarbons in the soil have been
fully delineated. To address this requirement, NJNG submitted a Draft
Revised Remedial Action Work Plan (RAWP) that includes post-remediation
sampling in November 2006. NJDEP discussed the contents of the Draft RAWP
with NJNG during a January 23, 2007 site visit. NJNG was instructed to
submit a letter clarifying certain items and/or providing additional details.
NJDEP received the letter on February 2, 2007 and will complete its review
of the Draft RAWP by the end of the month.
APSC, On-Site Portion of Troutmans Creek and remainder of
MGP
In November 2006, NJDEP approved NJNG’s revised RAWP Addendum outlining
its plans to remediate these areas and NJNG is implementing the remedial
action. NJDEP approved a design change on January 31, 2007 for a proposal
to use a sheet pile retaining wall instead of a concrete retaining wall.
NJNG is scheduled to submit a Draft Revised Remedial Action Report (RAR)
summarizing the remedial work conducted in this area in January 2008.
Ground Water Investigation
NJDEP approved NJNG’s Draft Remedial Investigation Work Plan (RIWP)
for the ground water in December 2006. NJNG will mobilize its contractors
and conduct the investigation to collect data for the following documents:
- Draft RAR for the soil investigation at Block 400, Lot 6 and Seaview
Avenue
- Draft Phase 3 RIR for the ground water and dense non-aqueous phase
liquid
The Draft RAR for the soil investigation is due on May 23, 2007 and the
Draft Phase 3 RIR for the ground water and non-aqueous phase liquid is
due on August 27, 2007. NJNG is also continuing the pilot test study to
obtain data to support remedy selection and reports the data to NJDEP
in quarterly ACO progress reports.
2) Off-Site Portion of Troutmans Creek
NJNG has completed the fieldwork described in the Draft Ecological Risk
Assessment (ERA) Work Plan dated March 2006 and submitted a Draft RIR
(ERA) summarizing its findings on January 18, 2007.
In August 2006, NJDEP issued comments on NJNG’s March 2006 Draft
RAWP for Troutmans Creek. NJDEP advised NJNG that it must first complete
the ERA and delineate soil and product contamination in the creek (see
next paragraph) before submitting a revised RAWP for this area. The revised
RAWP for the off-site portion of Troutmans Creek is due on March 13, 2007.
In September 2006, NJDEP issued a conditional approval letter for NJNG’S
RIWP outlining plans to delineate free and residual product and soil contamination
on the banks of Troutmans Creek. NJNG initiated the fieldwork described
in the RIWP in October 2006 and will submit an RIR summarizing its findings
to NJDEP on March 13, 2007.
3) Off-Site Residential Areas
The Long Branch Housing Authority (LBHA) previously addressed findings
documented in NJDEP’s February 2006 report for this area. LBHA subsequently
conducted a remedial investigation to delineate the extent of contamination
at Grant Court. NJDEP issued an approval letter for LBHA’s RIR and
RIR Addendum for the deep soil contamination at Grant Court in August
2006. The approval letter confirmed that LBHA adequately delineated the
soil contamination in this area and requested LBHA submit an RAWP for
Grant Court. NJDEP received the RAWP in October 2006 and plans to issue
comments to LBHA in February 2007.
NJDEP will investigate the extent of the soil contamination beneath the
pavement at Ellis Avenue. The timing of NJDEP’s investigation is
still being discussed, but will likely be scheduled for late spring/early
summer 2007.
4) Seaview Manor
NJNG reviewed NJNG’s February 2006 RAR for the remainder of the
LBHA properties and adjacent properties and issued a comment letter in
August 2006. NJDEP required NJNG to submit an RIWP Addendum with proposals
to satisfy the post-remediation sampling requirements for Block 400, Lot
6 and further investigate potential soil contamination beneath Seaview
Avenue. The RIWP Addendum was integrated into the RIWP described under
the ground water investigation section of this update and was received
by NJDEP in October 2006. NJDEP issued an approval letter for the RIWP
Addendum in December 2006.
Culvert Status
NJNG initiated a remedial action to remove the culvert and underlying
contamination in late in October 2006. All site activities are completed
and NJNG plans to submit the RAR Addendum for the culvert area on April
9, 2007.
Related Information
LBHA Activities
Installation of the storm water and sanitary sewer lines was completed
in August 2006, along with decontamination of the sheet piling installed
within Troutmans Creek. NJDEP received LBHA’s RAR for this area
in December 2006 and is currently reviewing the report.
Miscellaneous
On January 30, 2007, NJDEP issued a No Further Action approval to NJNG
for the former Can-Do Demolition property.
|