NJ Home   Services A to Z   Departments/Agencies FAQs
Great Seal of the State of New Jersey
NJDOT Site Index  |  Search: NJ Home   NJDOT
Disclaimer  
Great Seal of the State of New Jersey

news release

P.O. Box 600
Trenton, NJ
Contact: Steve Schapiro
Daniel Triana
609-530-4280
RELEASE: June 23, 2017


Route 1 congestion relief project utilizing the shoulder as travel lane begins Monday in South Brunswick

Cars allowed to use the shoulder from 6 a.m. to 9 a.m. and from 4 p.m. to 7 p.m.


(Trenton) - The New Jersey Department of Transportation (NJDOT) today is reminding motorists that the Route 1 congestion relief pilot project utilizing the shoulder as a travel lane during peak morning and evening commuting times will begin this Monday, June 26 in South Brunswick.

Starting on Monday, June 26 between 6 a.m. and 9 a.m. and from 4 p.m. to 7 p.m. cars may use the shoulder as a travel lane for a 1.9-mile stretch of Route 1 northbound and southbound from Independence Way to Raymond Road.

The temporary project will allow the shoulder to be used as a travel lane during the morning and evening commuting times Monday through Friday. Route 1 is three lanes before and after this section of the highway, causing a bottleneck and delays where the three lanes merge to two lanes. The goal in utilizing the shoulder as a travel lane during peak periods is to keep traffic flowing, reduce congestion, and improve safety.

Signage has been installed along Route 1 and at each driveway, changing the yield signs to stop signs, to alert and guide the traveling public about the temporary shoulder use condition. In addition, NJDOT installed traffic-monitoring cameras on utility poles along the project corridor so the shoulder can be monitored on a continual basis by NJDOT and South Brunswick officials.

The shoulder is scheduled to be open to traffic beginning on Monday, June 26 from 6 a.m. to 9 a.m. and from 4 p.m. to 7 p.m., Monday through Friday. Trucks may not use the shoulder as a travel lane. Use of the shoulder will be restricted at all other times.

The project was developed at the request of South Brunswick, with NJDOT evaluating cost effective solutions to help mitigate traffic congestion on Route 1. The strategy of using shoulders as temporary travel lanes during peak hours is known as Hard Shoulder Running. Although widely used in Europe, it is uncommon in the US, but growing in popularity. NJDOT has been using Hard Shoulder Running successfully on Route 29 northbound approaching the Route 129 interchange in Trenton for several years.

The anticipated duration for the Route 1 pilot project is six months. This may be adjusted depending on the operational and safety data gathered during the pilot program. If the project is successful, NJDOT will consider making this a permanent improvement.

Variable Message Signs will be used to provide advance notification to motorists of traffic pattern changes associated with the project. Motorists are encouraged to check NJDOT's traffic information website www.511nj.org for real-time travel information and for NJDOT news follow us on Twitter @NJDOT_info.


 
Go to NJDOT home page Contact Us | Privacy Notice | Legal Statement | Accessibility Statement  Go to State of New Jersey home page
  department: home | about | NJ commuter | in the works | business | engineering | freight, air & water | capital | community | data | links | index
  statewide: NJ Home | about NJ | business | government | state services A to Z | departments

  Copyright © State of New Jersey, 2002-2020
  Department of Transportation
  P.O. Box 600
  Trenton, NJ 08625-0600
OPRA - open public records act

  Last Updated:  June 23, 2017