TP-083
Question 1: Can the 2 Extra Pages be 11” x 17"?
Answer 1: Yes, The 2 Extra Pages can be 11” x 17”.
Question 2: Can the same person be used for a Team Leader of Electrical Engineering as well as Team Leader of ITS?
Answer 2: Yes. Same person can be used for a Team Leader of Electrical Engineering as well as Team Leader of ITS.
Question 3: May the Org Chart be 11x17?
Answer 3: Yes. The Org Chart may be 11X17.
Question 4: Is the Design of a Traffic Management Center requirement for the ITS Team Leader necessary for this proposal? Is it possible to remove this from the ITS Team Leader requirements?
Answer 4: Yes. The Design of a Management Center requirement can be removed the ITS Leader requirements.
Question 5: Can the record drawings from the Route 31 Northbound from Minneakoning Road to MP 24.92 Project be made available?
Within Appendix B of the Concept Development Report it states that these record drawings (Plans – Route 31 Section 6D) can be provided upon request.
Answer 5: The requested plans have been posted on BidExpress.
|