Question 1: Is it required to name an individual from a DBE/ESBE firm in one of the scored positions on the technical proposal evaluation criteria sheet and include a resume or is it sufficient to only list the DBE/ESBE firm as part of the team?
Answer 1: The posting anticipates two positions beyond the Project Manager. It is the firm’s responsibility to reach the federal goal of 12.49% ESBE participation. NJDOT is not requiring a DBE/ESBE to be identified in a scored position; however a DBE/ESBE firm must be listed as a member of the team. The selected firms will need to ensure the goal is met.
|
|
|