Question and Answer
For Current Technical Proposals


Email question(s) to PSPD@dot.state.nj.us, attention Manager of Professional Services, Procurement.

Specify "TP # 895 question" in subject line. Email is now the preferred method of answering consultant's questions. It will expedite processing the request and posting the response. If your firm does not have access to email, you may fax your questions to 609-530-2212.

Questions will be accepted up to question cut-off date noted in the technical proposal.

Technical Proposal


TP-895

 

Question: Has any recent topographic survey of the area been completed?

 

Answer: No.  Topographic survey of the project area is currently underway and is anticipated to be completed in the Fall of 2012.

 

Question: The requirements for the Lead geotechnical Engineer include items which are not related to rock slope mitigation including use of WEAP and PDA analysis.  Are these necessary for this project?

 

Answer: The Geotechnical Engineering team leader will not be required to describe their experiences with Performed Wave Equation, Drivability, Pile Dynamic Analysis, Noise Wall and Sign Structure Design. 

 

Question: Is there a NJDOT/AASHTO Bridge and Structure Design Manual?

 

Answer: The Geotechnical Engineering team leader requirement should be interpreted as "Experience with NJDOT and AASHTO Bridge and Structure Design Manuals". 

 

Question: Does the Geotechnical Engineering task require Noise Wall & Sign Structure Design experience?

 

Answer: The Geotechnical Engineering team leader will not be required to describe their experiences with Performed Wave Equation, Drivability, Pile Dynamic Analysis, Noise Wall and Sign Structure Design.

 

Question: Is Chapter 51 a required form?

Answer: A form certifying compliance with Chapter 51 is not required for the subject posting, because the project is federally funded.

Question: Please confirm that “ Performed Foundation, Retaining Wall, Sheet Pile, Noise Wall & Sign Structure Design”  is not a requirement for the Traffic Engineering Team Leader.

Answer: The first experience requirement listed in Section 10 for the Traffic Team Leader should read as follows:
Performed Highway Capacity / LOS Analysis using Highway Capacity software, HCS


Question: Instructions for completing forms indicate up to 6 projects may be listed for each Team Leader in Section 10 while Section 10 indicates 5 similar projects to be provided on Team Leader resumes.  Please verify the number of projects to be provided on resumes.

Answer: Up to 5 projects may be listed for each Team Leader in Section 10.


 
Go to NJDOT home page Contact Us | Privacy Notice | Legal Statement | Accessibility Statement  Go to State of New Jersey home page
  department: home | about | NJ commuter | in the works | business | engineering | freight, air & water | capital | community | data | links | index
  statewide: NJ Home | about NJ | business | government | state services A to Z | departments

  Copyright © State of New Jersey, 2002-2014
  Department of Transportation
  P.O. Box 600
  Trenton, NJ 08625-0600
OPRA - open public records act

  Last Updated:  August 3, 2012