| NTP Database Status Code Legend |
| Status |
Explanation |
Active |
Evaluation is presently ongoing. |
BDC1 |
Baseline Document Change (specification development) phase - NTP Evaluation is complete. The product met the performance
requirements of the NJDOT through a demonstration project(s) and has moved to specification development phase. |
BDC2 |
Baseline Document Change (specification development) has been issued and is under review by NJDOT and FHWA. |
Closed |
Evaluation was discontinued. Contact NTP Office for more information. |
Demo1 |
Actively being monitored in a demonstration project. |
Demo2 |
Demonstration project has been identified but has not yet been constructed. |
Demo3 |
Product has qualified for a demonstration project but a suitable project has not yet been identified. |
ES |
Product is covered by existing NJDOT standard specification. Contact the Bureau of Materials Engineering & Testing for
information on how to obtain approval through compliance with existing specifications. |
JS |
A formal evaluation has concluded that the product does not qualify as a standard item for routine use but may be considered on a
job by job basis when specifically requested by the project designer, contractor or local community within the project limits. |
NA1 |
Product not accepted due to failure to perform in demonstration testing. |
NA2 |
Product does not comply with NJDOT physical and/or performance requirements. |
NC |
Product did not address a critical need of the department and therefore did not qualify for a formal evaluation. |