AVERAGE
QUALITY MATERIALS AND WORKMANSHIP
BASE
SPECIFICATIONS
1)
Roof: |
Gable
or Shed Type,
Composition Shingle
or Equivalent |
5)
Floors: |
Concrete
Slab or Softwood |
2)
Foundation: |
Masonry Walls or Equivalent |
6)
Plumbing: |
None |
3)
Exterior Walls: |
Wood
Siding on Wood Frame,
Concrete Block or Equivalent |
7) Lighting: |
Conduit
Wiring with
Minimum Number of
Fixtures |
4)
Interior Finish: |
None |
8)
Other Items: |
None |
BASE
COST PER SQUARE FOOT GROUND AREA
100
|
150 |
200 |
400 |
600 |
1,000
|
2,000 |
3,000 |
$7.75 |
$6.75 |
$6.50 |
$6.00
|
$5.55 |
$5.40 |
$5.40 |
$4.70 |
For
Low Quality, multiply by .75 |
For
High Quality, multiply by 1.25 |
NOTES:
Depreciation: For High Quality - Table D-III, Average Quality - Table D-II,
Low Quality Table D-I
Cost Conversion Factors: See Page II - 153
Adjustments To Base Specifications: None |