|
Rebuild By Design – Hudson River
Feasibility Study (FS)
- Table of Contents
- Chapter 1 | Executive Summary [pdf, 3.6 Mb]
- Chapter 2 | Introduction [pdf, 2.2 Mb]
- Chapter 3 | Background [pdf, 216 kb]
- Chapter 4 | Data Collection and Review [pdf, 3.1 Mb]
- Chapter 5 | Existing Conditions [pdf, 11.7 Mb]
- Chapter 6 | Concept Development and Screening [pdf, 15.3 Mb]
- Chapter 7 | Alternative Analysis [pdf, 28.8 Mb]
- Chapter 8 | Recommendation for the Preferred Alternative [pdf, 15.3 Mb]
- Chapter 9 | Conclusions and Recommendations [pdf, 1.6 Mb]
- Chapter 10 | References [pdf, 52 kb]
- Appendices
- Appendix A: Site Photographs [pdf, 8.4 Mb]
- Appendix B: Base Maps [pdf, 256 Mb]
- Appendix C: Geotechnical Data [pdf, 45 Mb]
- Appendix D: Existing Conditions Waterfront Inspections Report [pdf, 15.4 Mb]
- Appendix E: NHSA Sewer Map [pdf, 100 Mb]
- Appendix F: Concept Development and ROW Green [pdf, 335 Mb]
- Appendix G: Technical Memo to Jersey City [pdf, 5.4 Mb]
- Appendix H: Coastal Design Flood Elevation Calculations [pdf, 165 Mb]
- Appendix I: Structural Design Calculations [pdf, 48.6 Mb]
- Appendix J: Geotechnical Design Calculations [pdf, 34.6 Mb]
- Appendix K: “Resist” Toolkit [pdf, 117 Mb]
- Appendix L: Cost Estimates [pdf, 4.6 Mb]
- Appendix M: Benefit Cost Analysis [pdf, 5.7 Mb]
- Appendix N: DSD Alternative Stormwater Calculations [pdf, 1 Mb]
- Appendix O: Delay, Store, Discharge (DSD) Materials Produced by SCAPE and Dewberry [pdf, 543 Mb]
- Appendix P - Memos to New Jersey Transit and New Jersey Department of Environmental Protection [pdf, 13.7 Mb]
- Appendix Q: Conceptual Design Drawing Package [pdf, 159 Mb]
- Appendix R: Construction Staging [pdf, 13.1 Mb]
- Appendix S - List of Unprotected Buildings in the 100 Year Flood Plain [pdf, 622 kb]
- Appendix T: Working Drafts of OMA/SCAPE/DEWBERRY Presentations to Executive Steering Committee Working Group [pdf, 247 Mb]
Rebuild by Design Hudson River Project
Hydrology and Flood Risk Assessment Report
- Table of Contents
- Chapter 1 | Executive Summary [pdf, 984 kb]
- Chapter 2 | Project Background [pdf, 927 kb]
- Chapter 3 | Coastal Modeling Methodology [pdf, 3.2 Mb]
- Chapter 4 | Model Validation [pdf, 2.7 Mb]
- Chapter 5 | Evaluation of No-Action Alternative (NAA) for “Resist” Only [pdf, 1.6 Mb]
- Chapter 6 | Evaluation of “Resist” Alternatives [pdf, 7.4 Mb]
- Chapter 7 | Stormwater Modeling Methodology [pdf, 6.8 Mb]
- Chapter 8 | Stormwater Model Validation [pdf, 1.3 Mb]
- Chapter 9 | Stormwater Modeling Alternatives and Results [pdf, 17.1 Mb]
- Chapter 10 | Conclusions and Recommendations [pdf, 299 kb]
- Chapter 11 | References [pdf, 54 kb]
- Appendices
- Appendix A: Coastal Model Boundary Conditions Hydrographs [pdf, 641 kb]
- Appendix B: 0.2% Annual Chance (500-Year) Wave Height Calculations [pdf, 7.8 Mb]
- Appendix C: Stevens Institute of technology Modeling Memo, High Water Mark Measurements Details and Site Photos [pdf, 1.4 Mb]
- Appendix D: Map and Results of Maximum Water Depth Locations [pdf, 2.8 Mb]
- Appendix E: Full-Scale MIKE URBAN Catchments Map [pdf, 20 Mb]
- Appendix F: Catchments Dry Weather Flow Calculations [pdf, 850 kb]
- Appendix G: MIKE URBAN Catchment Parameters [pdf, 675 kb]
- Appendix H: Full-Scale MIKE URBAN Sewer Network Maps [pdf, 92.1 Mb]
- Appendix I - Rainfall Tide Correlation Data Attachment A [pdf, 1.3 Mb]
- Appendix I(a) - Rainfall Tide Correlation Data Attachment A [xlsx, 2.1 Mb]
- Appendix J: Photos of Irene Validation Locations [pdf, 1.5 Mb]
- Appendix K: MIKE URBAN and MIKE FLOOD Model Validation Results for Hurricane Irene [pdf, 1.8 Mb]
- Appendix L: MIKE URBAN and MIKE FLOOD Model Results for No-Action Alternative [pdf, 10.7 Mb]
- Appendix M: Proposed DSD Detention Tanks Summary and Calculations [pdf, 503 kb]
- Appendix N: MIKE URBAN and MIKE FLOOD Model Results for Proposed DSD Alternative [pdf, 16.1 Mb]
Return to Draft Environmental Imapct Statement
Return to Rebuild by Design Hudson River Project home page
Some of the links on this page may require Adobe Reader to view them. The Adobe Reader is available for download free of charge. |
|