CPSBIDFM-1 DEPARTMENT OF TRANSPORTATION PAGE 1 CONSTRUCTION SERVICES/PROCUREMENT DIVISION TRENTON, NEW JERSEY TABULATION OF BIDS AND UNIT PRICES ROUTE 29 INSTALLATION OF DELAWARE AVENUE TRUNK LINE AT MILE POST 19.22 CONSTRUCTION COMPLETION CONTRACT CONTRACT NO. 019970149A CITY OF LAMBERTVILLE HUNTERDON COUNTY D.P. NO. 01106 BIDS RECEIVED APRIL 12, 2001 CONTRACT AWARD DATE MAY 07, 2001 BIDDERS TOTAL PRICE BID 1 . CARBRO CONSTRUCTORS CORP $ 4,777,148.30 605 OMNI DRIVE HILLSBOROUGH NJ08876 2 . NORTHEAST CONSTR INC $ 4,931,082.02 100 RT#70 BOX#2040 LAKEWOOD NJ08701 3 . RENCOR INC $ 5,570,719.50 24 TANNERY ROAD SUITE 1B SOMERVILLE NJ08870 4 . T & T COMMONWEALTH CONSTR CO INC $ 5,885,574.50 1166 RT#9 SUITE#7 LAKEWOOD NJ08701 5 . MARBRO INC $ 6,211,317.00 127 PINE STREET MONTCLAIR NJ07042 6 . ROSANGELA CONTRACTING CO INC $ 6,260,162.77 P O BOX M CLIFFWOOD NJ07721 ITEM DESCRIPTION UNIT CONTRACT LOW BIDDER 2ND LOW BIDDER NO. QUANTITY UNIT PRICE DOLLAR AMT. UNIT PRICE DOLLAR AMT. 1 PERFORMANCE BOND AND PAYMENT BOND LS 1 35,000.00 35,000.00 32,000.00 32,000.00 2 FINAL CLEANUP LS 1 10,000.00 10,000.00 2,500.00 2,500.00 3 CONSTRUCTION LAYOUT LS 1 30,000.00 30,000.00 25,000.00 25,000.00 4 FIELD OFFICE TYPE D SET-UP U 1 30,000.00 30,000.00 20,000.00 20,000.00 5 FIELD OFFICE TYPE D MAINTENANCE MO 12 500.00 6,000.00 1,000.00 12,000.00 6 TELEPHONE SERVICE LS 1 3,000.00 3,000.00 3,000.00 3,000.00 7 GROUND MOVEMENT MONITORING LS 1 40,000.00 40,000.00 7,200.00 7,200.00 8 VIBRATION MONITORING HRS 150 75.00 11,250.00 60.00 9,000.00 9 BUILDING AND STRUCTURES ASSESSMENT LS 1 30,000.00 30,000.00 40,000.00 40,000.00 10 FUEL PRICE ADJUSTMENT LS 1 500.00 500.00 500.00 500.00 11 TRAINING REIMBURSEMENT LS 1 20,000.00 20,000.00 20,000.00 20,000.00 12 OWNER'S AND CONTRACTOR'S PROTECTIVE LS 1 7,000.00 7,000.00 2,500.00 2,500.00 LIABILITY INSURANCE 13 RAILROAD PROTECTIVE LIABILITY INSURANCE LS 1 2,000.00 2,000.00 2,000.00 2,000.00 14 PROGRESS SCHEDULE LS 1 15,000.00 15,000.00 6,000.00 6,000.00 15 MOBILIZATION LS 1 470,000.00 470,000.00 400,000.00 400,000.00 16 ARCHAEOLOGICAL INVESTIGATIONS LS 1 10,000.00 10,000.00 25,000.00 25,000.00 17 CLEARING SITE LS 1 35,000.00 35,000.00 35,000.00 35,000.00 18 SEALING OF MONITORING WELLS U 11 700.00 7,700.00 500.00 5,500.00 19 STRIPPING HA 1 25,000.00 25,000.00 3,000.00 3,000.00 20 ROADWAY EXCAVATION, UNCLASSIFIED CM 2,393 15.70 37,570.10 25.00 59,825.00 21 SAWCUTTING LM 70 10.00 700.00 4.00 280.00 22 MILLING, VARIABLE DEPTH SM 337 7.20 2,426.40 10.00 3,370.00 23 CHANNEL EXCAVATION, UNCLASSIFIED CM 146 21.00 3,066.00 35.00 5,110.00 24 PORTABLE COFFERDAM SYSTEM LS 1 90,000.00 90,000.00 150,000.00 150,000.00 25 EARTH EXCAVATION FOR TEST PITS CM 50 130.00 6,500.00 100.00 5,000.00 26 CONTROLLED LOW STRENGTH MATERIAL CM 1,299 118.00 153,282.00 140.00 181,860.00 27 PIPE BEDDING, CLASS C CM 553 39.00 21,567.00 45.00 24,885.00 28 SILT FENCE LM 519 10.00 5,190.00 4.00 2,076.00 29 HAYBALE CHECK DAM WITH TEMPORARY STONE OUTLET LM 42 16.00 672.00 24.00 1,008.00 30 INLET FILTERS U 20 25.00 500.00 100.00 2,000.00 31 CONSTRUCTION DRIVEWAY MGR 123 27.00 3,321.00 19.95 2,453.85 32 INSTALLATION OF GROUT PIPES LM 700 164.00 114,800.00 35.00 24,500.00 33 TEMPORARY CANAL LINER LS 1 60,000.00 60,000.00 30,000.00 30,000.00 34 DEWATERING (PRIMARY TRUNKLINE OUTSIDE GROUTED LS 1 125,000.00 125,000.00 80,000.00 80,000.00 ZONES) 35 DEWATERING (WITHIN GROUTED ZONES) LM 35 657.00 22,995.00 25.00 875.00 36 INJECTION OF GROUT CM 500 327.00 163,500.00 500.00 250,000.00 37 DENSE GRADED AGGREGATE BASE COURSE, SM 2,900 7.20 20,880.00 7.00 20,300.00 150 MM THICK 38 DENSE GRADED AGGREGATE BASE COURSE, SM 775 8.30 6,432.50 13.50 10,462.50 300 MM THICK 39 DENSE GRADED AGGREGATE CM 283 33.00 9,339.00 40.00 11,320.00 40 BITUMINOUS-STABILIZED BASE COURSE, MIX I-2 MGR 1,067 44.00 46,948.00 56.00 59,752.00 41 BITUMINOUS CONCRETE PATCH MGR 100 55.00 5,500.00 60.00 6,000.00 42 BITUMINOUS CONCRETE SURFACE COURSE MIX I-4 MGR 397 48.50 19,254.50 63.00 25,011.00 43 TACK COAT L 1,039 1.00 1,039.00 .01 10.39 44 PRIME COAT L 4,558 .20 911.60 .01 45.58 45 TEMPORARY SUPPORT SYSTEMS (DELAWARE AVENUE) SM 724 36.00 26,064.00 25.00 18,100.00 46 SUPPORT SYSTEMS LEFT IN PLACE (DELAWARE AVE.) SM 2,415 60.00 144,900.00 25.00 60,375.00 47 100 MM DUCTILE IRON WATER PIPE, CLASS 52 LM 6 333.00 1,998.00 400.00 2,400.00 48 150 MM DUCTILE IRON WATER PIPE, CLASS 52 LM 6 416.00 2,496.00 400.00 2,400.00 49 200 MM DUCTILE IRON WATER PIPE, CLASS 52 LM 85 574.00 48,790.00 200.00 17,000.00 50 375 MM REINFORCED CONCRETE CULVERT PIPE LM 76 278.00 21,128.00 200.00 15,200.00 51 525 MM REINFORCED CONCRETE CULVERT PIPE LM 111 328.00 36,408.00 210.00 23,310.00 52 750 MM REINFORCED CONCRETE CULVERT PIPE LM 30 392.00 11,760.00 250.00 7,500.00 53 900 MM REINFORCED CONCRETE CULVERT PIPE LM 129 459.00 59,211.00 260.00 33,540.00 54 1 050 MM REINFORCED CONCRETE CULVERT PIPE LM 104 524.00 54,496.00 265.00 27,560.00 55 150 MM P.V.C. SEWER PIPE, SCHEDULE 80 LM 3 333.00 999.00 175.00 525.00 56 200 MM P.V.C. SEWER PIPE, SCHEDULE 80 LM 175 492.00 86,100.00 200.00 35,000.00 57 300 MM P.V.C. SEWER PIPE, SCHEDULE 80 LM 3 533.00 1,599.00 250.00 750.00 58 75 MM POLYVINYL CHLORIDE ROOF DRAIN, LM 150 65.00 9,750.00 100.00 15,000.00 SCHEDULE 80 59 2 134 MM FIBERGLASS CULVERT PIPE - INSTALLED LM 242 4,000.00 968,000.00 5,284.00 1,278,728.00 60 1 520 MM FIBERGLASS CULVERT PIPE - INSTALLED, LM 103 5,500.00 566,500.00 7,000.00 721,000.00 JACKING METHOD 61 1 520 MM FIBERGLASS CULVERT PIPE - INSTALLED, LM 0 .00 0.00 0.00 TWO-PASS TUNNELING METHOD 62 RETRIEVAL SHAFT U 1 115,000.00 115,000.00 200,000.00 200,000.00 63 JACKING/TUNNELING SHAFT U 1 175,000.00 175,000.00 200,000.00 200,000.00 64 INLETS, TYPE B U 9 2,100.00 18,900.00 1,700.00 15,300.00 65 MANHOLES U 1 1,500.00 1,500.00 2,000.00 2,000.00 66 MANHOLES, SANITARY SEWER U 1 1,500.00 1,500.00 2,500.00 2,500.00 67 MANHOLES, SANITARY SEWER, USING EXISTING U 3 1,000.00 3,000.00 2,300.00 6,900.00 CASTING 68 RECONSTRUCTED INLETS, TYPE B, USING EXISTING U 2 1,000.00 2,000.00 1,300.00 2,600.00 CASTING 69 RESET CASTINGS U 1 50.00 50.00 500.00 500.00 70 MANHOLE CHAMBER #1A U 1 145,000.00 145,000.00 60,000.00 60,000.00 71 MANHOLE CHAMBER #2 U 1 145,000.00 145,000.00 60,000.00 60,000.00 72 DIVERSION STRUCTURE, TYPE E2 U 5 4,000.00 20,000.00 5,000.00 25,000.00 73 INLET, TYPE DOUBLE E2 U 1 7,000.00 7,000.00 7,200.00 7,200.00 74 225 BY 450 MM CONCRETE VERTICAL CURB LM 167 36.00 6,012.00 45.00 7,515.00 75 GRANITE CURB LM 356 36.00 12,816.00 160.00 56,960.00 76 CONCRETE SIDEWALK, 100 MM THICK SM 231 38.00 8,778.00 39.00 9,009.00 77 CONCRETE DRIVEWAY, REINFORCED, 150 MM THICK SM 29 48.00 1,392.00 43.00 1,247.00 78 RED BRICK SIDEWALK, HERRINGBONE PATTERN SM 238 129.00 30,702.00 115.00 27,370.00 79 RESET RED BRICK SIDEWALK, HERRINGBONE PATTERN SM 300 118.00 35,400.00 88.00 26,400.00 80 SLATE SIDEWALK SM 13 129.00 1,677.00 100.00 1,300.00 81 MORTAR ROCK MASONRY WALLS CM 3 400.00 1,200.00 1,750.00 5,250.00 82 MISCELLANEOUS CONCRETE CM 4 156.00 624.00 350.00 1,400.00 83 RESET FENCE LM 39 33.00 1,287.00 45.00 1,755.00 84 SNOW FENCE, PLASTIC LM 100 16.00 1,600.00 15.00 1,500.00 85 TEMPORARY CHAIN-LINK FENCE, 2.4 M HIGH LM 733 20.00 14,660.00 50.00 36,650.00 86 BATTING CAGE MODIFICATIONS LS 1 1,500.00 1,500.00 4,000.00 4,000.00 87 SWING SET LS 1 3,500.00 3,500.00 4,500.00 4,500.00 88 RIPRAP STONE SLOPE PROTECTION, 300 MM THICK SM 126 48.00 6,048.00 48.00 6,048.00 89 BREAKAWAY BARRICADES U 35 110.00 3,850.00 100.00 3,500.00 90 PRECAST CONCRETE CURB, CONSTRUCTION BARRIER, LM 300 114.00 34,200.00 110.00 33,000.00 TYPE 4 91 DRUMS U 50 75.00 3,750.00 70.00 3,500.00 92 CONSTRUCTION SIGNS SM 64 161.00 10,304.00 24.00 1,536.00 93 TRAFFIC CONTROL TRUCKS WITH MOUNTED U 1 5,000.00 5,000.00 15,000.00 15,000.00 CRASH CUSHIONS 94 REMOVABLE PAVEMENT MARKING TAPE LM 375 3.00 1,125.00 4.00 1,500.00 95 TRAFFIC DIRECTORS, FLAGGERS HRS 80 45.00 3,600.00 40.00 3,200.00 96 SIGNS SM 10 162.00 1,620.00 250.00 2,500.00 97 RESET SIGNS U 16 50.00 800.00 75.00 1,200.00 98 RESET WATER VALVE BOXES U 11 25.00 275.00 50.00 550.00 99 WATER SERVICE CONNECTIONS U 28 300.00 8,400.00 600.00 16,800.00 100 200 MM GATE VALVES AND BOXES U 2 750.00 1,500.00 1,000.00 2,000.00 101 SHALLOW SANITARY SEWER MANHOLE U 1 1,000.00 1,000.00 3,000.00 3,000.00 102 SANITARY SEWER CLEANOUT U 26 250.00 6,500.00 150.00 3,900.00 103 TEMPORARY SANITARY SEWER SERVICES U 26 300.00 7,800.00 250.00 6,500.00 104 SANITARY SEWER SERVICES U 26 400.00 10,400.00 450.00 11,700.00 105 19MM TO 25MM COPPER WATER SERVICE PIPE LM 112 98.00 10,976.00 80.00 8,960.00 106 100 MM INSERTION VALVES U 2 4,500.00 9,000.00 6,000.00 12,000.00 107 150 MM INSERTION VALVES U 2 5,200.00 10,400.00 7,000.00 14,000.00 108 200 MM INSERTION VALVES U 2 6,000.00 12,000.00 7,500.00 15,000.00 109 SELECTIVE THINNING SM 500 12.00 6,000.00 15.00 7,500.00 110 TRIMMING EXISTING TREES, OVER 150 TO 300 MM U 1 150.00 150.00 200.00 200.00 DIAMETER 111 TRIMMING EXISTING TREES, OVER 300 TO 500 MM U 7 300.00 2,100.00 300.00 2,100.00 DIAMETER 112 TRIMMING EXISTING TREES, OVER 600 TO 800 MM U 3 350.00 1,050.00 350.00 1,050.00 DIAMETER 113 TRIMMING EXISTING TREES, OVER 800 TO 900 MM U 5 500.00 2,500.00 500.00 2,500.00 DIAMETER 114 TRIMMING EXISTING TREES, TO 150 MM DIAMETER U 4 125.00 500.00 130.00 520.00 115 TRUNK PROTECTION U 20 100.00 2,000.00 100.00 2,000.00 116 TREE MAINTENANCE LS 1 100.00 100.00 1,000.00 1,000.00 117 TREE REMOVAL, OVER 150 TO 300 MM DIAMETER U 1 250.00 250.00 200.00 200.00 118 TREE REMOVAL, OVER 300 TO 500 MM DIAMETER U 4 450.00 1,800.00 300.00 1,200.00 119 TREE REMOVAL, OVER 600 TO 800 MM DIAMETER U 3 700.00 2,100.00 560.00 1,680.00 120 TREE REMOVAL, OVER 800 TO 900 MM DIAMETER U 3 1,000.00 3,000.00 1,500.00 4,500.00 121 TOPSOILING, 100 MM THICK SM 11,203 1.20 13,443.60 1.50 16,804.50 122 BORROW TOPSOIL CM 35 24.00 840.00 30.00 1,050.00 123 BALLFIELD TOPSOIL CM 1,000 24.00 24,000.00 33.00 33,000.00 124 FERTILIZING AND SEEDING, TYPE A-3 SM 1,280 .60 768.00 .50 640.00 125 FERTILIZING AND SEEDING, TYPE D SM 590 .60 354.00 .50 295.00 126 FERTILIZING AND SEEDING, TYPE F SM 1,000 .60 600.00 .50 500.00 127 FERTILIZING AND SEEDING, TYPE W SM 1,585 1.00 1,585.00 .50 792.50 128 FERTILIZING AND SEEDING, TYPE X SM 14,248 .60 8,548.80 .50 7,124.00 129 TOPSOIL STABILIZATION MATTING SM 697 4.80 3,345.60 4.00 2,788.00 130 STRAW MULCHING SM 18,006 .60 10,803.60 .45 8,102.70 131 WOOD MULCHING SM 172 4.80 825.60 4.00 688.00 132 MOWING HA 2 500.00 1,000.00 500.00 1,000.00 133 ACER RUBRUM, B&B, 50 TO 60 MM CALIPER, U 6 250.00 1,500.00 230.00 1,380.00 3.6 TO 4.2 M HIGH 134 CORNUS AMOMUM, BR, 0.6 TO 0.9 M HIGH U 191 15.00 2,865.00 15.00 2,865.00 135 CORNUS FLORIDA, B&B, 1.25 TO 1.5 M HIGH U 1 100.00 100.00 100.00 100.00 136 FRAXINUS PENNSYLVANICA, B&B, 50 TO 60 MM U 5 225.00 1,125.00 230.00 1,150.00 CALIPER, 3.6 TO 4.2 M HIGH 137 LINDERA BENZOIN, #2 CAN, 0.5 TO 0.6 M HIGH U 100 35.00 3,500.00 40.00 4,000.00 138 PLATANUS ACERIFOLIA 'BLOODGOOD', B&B, U 2 250.00 500.00 230.00 460.00 50 TO 60 MM CALIPER, 3.6 TO 4.2 M HIGH 139 PYRUS CALLERYANA 'CHANTICLEER', B&B, 80-90 MM U 7 325.00 2,275.00 300.00 2,100.00 CAL, 3.6-4.2 M HIGH, BRANCHED 1.8-2.0 M 140 TOPSOIL CM 52 24.00 1,248.00 30.00 1,560.00 141 WATERING CM 37 66.00 2,442.00 60.00 2,220.00 142 TREE PROTECTION LM 30 6.00 180.00 50.00 1,500.00 143 COIR FIBER SUBMERSIBLE PLANTER, 300 MM LM 105 56.00 5,880.00 50.00 5,250.00 DIAMETER 144 CYPERUS ESCULENTUS, PP OR BR PLUG U 565 5.00 2,825.00 4.00 2,260.00 145 CAREX LACUSTRUS, PP OR BR PLUG U 565 5.00 2,825.00 4.00 2,260.00 146 ACER TRUNCATUM X PLATANOIDES "KEITHSFORM", U 9 600.00 5,400.00 600.00 5,400.00 B&B, 90 TO 100 MM CALIPER, 4.2 TO 4.8 M HIGH 147 PRUNUS SERRULATA "KWANZAN", B&B, 80 TO 90 MM U 6 325.00 1,950.00 330.00 1,980.00 CALIPER, 3.6 TO 4.2 M HIGH 148 PRUNUS CERASIFERA "THUNDERCLOUD", B&B, 80 TO U 2 325.00 650.00 330.00 660.00 90 MM CALIPER, 3.6 TO 4.2 M HIGH 149 ACER PALMATUM ATROPURPUREUM "RED FILIGREE U 1 400.00 400.00 380.00 380.00 LACE", 0.4 TO 0.5 M HEAD, #3 CAN 150 CEDRUS ATLANTICA GLAUCA "PENDULA", #5 CAN U 1 140.00 140.00 140.00 140.00 151 EARTH EXCAVATION, SUBSURFACE STRUCTURES, CM 15 66.00 990.00 80.00 1,200.00 ADDITIONAL DEPTH SUMMARY OF AMOUNTS ROAD ITEMS $ 4,777,148.30 $ 4,931,082.02 BRIDGE ITEMS 0.00 0.00 SUB-TOTAL AMOUNTS FOR BRIDGE WORK AGREE AGREE (HEADER) LOW BID =$ 4,777,148.30 (HEADER) 2ND LOW BID =$ 4,931,082.02 COMPUTED LOW BID =$ 4,777,148.30 COMPUTED 2ND LOW BID =$ 4,931,082.02 COMPUTED LOW BID =$ 4,777,148.30 COMPUTED 2ND LOW BID =$ 4,931,082.02