CPSBIDFM-1 DEPARTMENT OF TRANSPORTATION PAGE 1 CONSTRUCTION SERVICES/PROCUREMENT DIVISION TRENTON, NEW JERSEY TABULATION OF BIDS AND UNIT PRICES DUCK ISLAND REMEDIATION CONTRACT NO. 001993340 TOWNSHIP OF HAMILTON MERCER COUNTY D.P. NO. 01120 BIDS RECEIVED MAY 22, 2001 CONTRACT AWARD DATE MAY 31, 2001 BIDDERS TOTAL PRICE BID 1 . PARSIPPANY CONSTR CO INC $ 5,921,111.00 115 RT 46 WEST STE #E-39 MOUNTAIN LAKES NJ07046 2 . MARSELLIS WARNER CORP $ 6,148,307.00 10 BALDWIN STREET MONTCLAIR NJ07042 3 . ROSANGELA CONTRACTING CO INC $ 6,691,889.00 P O BOX M CLIFFWOOD NJ07721 4 . RICHARD E PIERSON CONSTR CO INC $ 6,789,768.10 P O BOX 430 WOODSTOWN NJ08098 5 . CARBRO CONSTRUCTORS CORP $ 7,447,126.97 605 OMNI DRIVE HILLSBOROUGH NJ08876 ITEM DESCRIPTION UNIT CONTRACT LOW BIDDER 2ND LOW BIDDER NO. QUANTITY UNIT PRICE DOLLAR AMT. UNIT PRICE DOLLAR AMT. 1 PERFORMANCE BOND AND PAYMENT BOND LS 1 25,000.00 25,000.00 37,000.00 37,000.00 2 FINAL CLEANUP LS 1 5,000.00 5,000.00 5,750.00 5,750.00 3 CONSTRUCTION LAYOUT LS 1 25,000.00 25,000.00 34,500.00 34,500.00 4 FIELD OFFICE TYPE A SET-UP U 1 25,000.00 25,000.00 17,250.00 17,250.00 5 FIELD OFFICE TYPE A MAINTENANCE MO 21 1,500.00 31,500.00 1,035.00 21,735.00 6 TELEPHONE SERVICE LS 1 5,250.00 5,250.00 5,250.00 5,250.00 7 MATERIALS FIELD LABORATORY SET-UP U 1 15,000.00 15,000.00 23,000.00 23,000.00 8 MATERIALS FIELD LABORATORY MAINTENANCE MO 18 700.00 12,600.00 345.00 6,210.00 9 TRAINING REIMBURSEMENT LS 1 34,000.00 34,000.00 34,000.00 34,000.00 10 OWNER'S AND CONTRACTOR'S PROTECTIVE LS 1 5,000.00 5,000.00 16,100.00 16,100.00 LIABILITY INSURANCE 11 POLLUTION LIABILITY INSURANCE LS 1 5,000.00 5,000.00 19,240.00 19,240.00 12 PROGRESS SCHEDULE LS 1 10,000.00 10,000.00 2,300.00 2,300.00 13 MOBILIZATION LS 1 591,113.15 591,113.15 80,875.87 80,875.87 14 FUEL PRICE ADJUSTMENT LS 1 2,300.00 2,300.00 2,300.00 2,300.00 15 OFF-SITE MANAGEMENT, REGULATED WASTE MG 2,340 40.00 93,600.00 46.00 107,640.00 16 CLEARING SITE LS 1 195,000.00 195,000.00 194,350.00 194,350.00 17 RESET MONITORING WELL BOXES U 9 500.00 4,500.00 575.00 5,175.00 18 ROADWAY EXCAVATION, REGULATED WASTE CM 18,168 19.00 345,192.00 35.94 652,957.92 19 BORROW EXCAVATION, ZONE 3 CM 3,497 30.00 104,910.00 5.75 20,107.75 20 BORROW EXCAVATION, COMMON FILL CM 51,895 17.00 882,215.00 25.71 1,334,220.45 21 PIPE BEDDING, CLASS B CM 33 65.00 2,145.00 25.30 834.90 22 SILT FENCE LM 480 12.00 5,760.00 4.89 2,347.20 23 HEAVY DUTY SILT FENCE LM 2,933 15.00 43,995.00 5.75 16,864.75 24 HAYBALE CHECK DAM WITH TEMPORARY STONE OUTLET LM 190 125.00 23,750.00 23.00 4,370.00 25 TEMPORARY STONE CHECK DAM CM 77 150.00 11,550.00 57.50 4,427.50 26 TEMPORARY SLOPE DRAIN LM 398 65.00 25,870.00 74.75 29,750.50 27 INLET PROTECTION, HAYBALE BARRIER U 16 150.00 2,400.00 28.75 460.00 28 DEWATERING BASINS U 2 2,000.00 4,000.00 2,300.00 4,600.00 29 ROADWAY EXCAVATION, TEMPORARY EROSION CONTROL CM 2,075 15.00 31,125.00 8.05 16,703.75 30 EMBANKMENT, TEMPORARY EROSION CONTROL CM 100 50.00 5,000.00 1.15 115.00 31 TEMPORARY RIPRAP CM 12 150.00 1,800.00 25.30 303.60 32 GEOTEXTILE SM 150 1.00 150.00 1.15 172.50 33 HAYBALES U 400 25.00 10,000.00 11.50 4,600.00 34 DECONTAMINATION PAD U 1 3,000.00 3,000.00 58,075.00 58,075.00 35 OIL-WATER SEPARATOR U 1 15,000.00 15,000.00 11,500.00 11,500.00 36 DITCH EXCAVATION, REGULATED WASTE CM 550 25.00 13,750.00 14.98 8,239.00 37 OFF-SITE MANAGEMENT, SOLID WASTE MG 130 100.00 13,000.00 57.50 7,475.00 38 SAMPLING AND ANALYSIS FOR TREATMENT, U 10 750.00 7,500.00 1,150.00 11,500.00 DISPOSAL, AND/OR RECYCLING 39 DENSE GRADED AGGREGATE BASE COURSE, VARIABLE CM 6,626 35.00 231,910.00 42.98 284,785.48 THICKNESS 40 COARSE AGGREGATE, SIZE NO. 2 CM 4 75.00 300.00 28.75 115.00 41 NO ITEM U 0 .00 0.00 .00 0.00 42 BORED WELLS LM 191 225.00 42,975.00 469.18 89,613.38 43 FURNISHING EQUIPMENT FOR DRILLING WELLS LS 1 2,500.00 2,500.00 5,462.00 5,462.00 44 100 MM CORRUGATED PERFORATED HDPE PIPES LM 3,234 35.00 113,190.00 33.04 106,851.36 45 450 MM CORRUGATED HDPE PIPES LM 207 45.00 9,315.00 117.44 24,310.08 46 GAS COLLECTION MAIN LM 1,615 55.00 88,825.00 39.07 63,098.05 47 GAS COLLECTION SHAFT LM 191 45.00 8,595.00 17.26 3,296.66 48 GAS COLLECTION RISER U 45 1,000.00 45,000.00 463.00 20,835.00 49 150 MM BUTTERFLY VALVES AND BOXES U 12 900.00 10,800.00 218.00 2,616.00 50 INLETS, TYPE A U 10 3,000.00 30,000.00 1,875.00 18,750.00 51 CONCRETE HEADWALLS CM 27 1,300.00 35,100.00 1,200.00 32,400.00 52 SLOTTED GUIDE RAIL TERMINALS U 1 2,200.00 2,200.00 2,530.00 2,530.00 53 BEAM GUIDE RAIL ANCHORAGES U 1 600.00 600.00 690.00 690.00 54 BEAM GUIDE RAIL POSTS U 4 50.00 200.00 57.50 230.00 55 BEAM GUIDE RAIL ELEMENT LM 10 60.00 600.00 69.00 690.00 56 RESET BEAM GUIDE RAIL WITH EXISTING POSTS LM 70 30.00 2,100.00 34.50 2,415.00 57 MISCELLANEOUS CONCRETE CM 3 400.00 1,200.00 345.00 1,035.00 58 CHAIN-LINK FENCE, PVC-COATED STEEL, LM 989 24.75 24,477.75 92.00 90,988.00 2.4 M HIGH 59 SNOW FENCE, PLASTIC LM 4,674 20.00 93,480.00 11.50 53,751.00 60 GATES, CHAIN-LINK FENCE, PVC-COATED STEEL, U 1 1,800.00 1,800.00 2,875.00 2,875.00 7.2 M WIDE DOUBLE LEAF 61 RIPRAP STONE SLOPE PROTECTION, 400 MM THICK SM 953 40.00 38,120.00 23.00 21,919.00 (D50=200 MM) 62 GABION WALL CM 1,844 175.00 322,700.00 141.00 260,004.00 63 GABION MATTRESS CM 74 200.00 14,800.00 141.00 10,434.00 64 GEOMEMBRANE SM 124,088 5.85 725,914.80 6.52 809,053.76 65 GEOCOMPOSITE DRAIN SM 116,348 5.10 593,374.80 5.20 605,009.60 66 PRECAST CONCRETE CURB, CONSTRUCTION BARRIER, LM 44 125.00 5,500.00 188.60 8,298.40 TYPE 4 67 DRUMS U 15 100.00 1,500.00 69.00 1,035.00 68 CONSTRUCTION SIGNS SM 29 75.00 2,175.00 126.50 3,668.50 69 ILLUMINATED FLASHING ARROWS, 600 BY 1 200 MM U 1 4,000.00 4,000.00 575.00 575.00 70 TRAFFIC CONTROL TRUCKS WITH MOUNTED U 1 10,000.00 10,000.00 2,875.00 2,875.00 CRASH CUSHIONS 71 NO ITEM U 0 .00 0.00 .00 0.00 72 NO ITEM U 0 .00 0.00 .00 0.00 73 SELECTIVE THINNING SM 100 2.00 200.00 28.75 2,875.00 74 BORROW TOPSOIL CM 16,375 25.00 409,375.00 25.30 414,287.50 75 FERTILIZING AND SEEDING, TYPE F SM 10,917 .42 4,585.14 .41 4,475.97 76 WILDFLOWER SEEDING, TYPE W1 SM 73,350 1.34 98,289.00 1.36 99,756.00 77 WILDFLOWER SEEDING, TYPE W2 SM 22,545 2.15 48,471.75 1.96 44,188.20 78 WILDFLOWER SEEDING, TYPE W3 SM 5,960 3.60 21,456.00 4.25 25,330.00 79 FERTILIZING AND SEEDING, TYPE W4 SM 7,597 .48 3,646.56 .65 4,938.05 80 TOPSOIL STABILIZATION MATTING SM 5,960 4.50 26,820.00 3.43 20,442.80 81 STRAW MULCHING SM 18,514 .44 8,146.16 .41 7,590.74 82 MOWING HA 25 300.00 7,500.00 545.00 13,625.00 83 NONVEGETATIVE SURFACE, BITUMINOUS CONCRETE SM 84 35.00 2,940.00 38.15 3,204.60 84 PRUNUS SERRULATA 'KWANZAN', B&B, 40 TO 45 MM U 25 125.00 3,125.00 174.00 4,350.00 CALIPER, 1.8 TO 2.0 M HIGH 85 WATERING CM 60 67.00 4,020.00 43.60 2,616.00 86 TOPSOILING, 150 MM THICK SM 109,167 1.67 182,308.89 1.54 168,117.18 87 NO ITEM U 0 .00 0.00 .00 0.00 88 NO ITEM U 0 .00 0.00 .00 0.00 89 NO ITEM U 0 .00 0.00 .00 0.00 90 NO ITEM U 0 .00 0.00 .00 0.00 91 NO ITEM U 0 .00 0.00 .00 0.00 92 NO ITEM U 0 .00 0.00 .00 0.00 93 NO ITEM U 0 .00 0.00 .00 0.00 94 NO ITEM U 0 .00 0.00 .00 0.00 95 NO ITEM U 0 .00 0.00 .00 0.00 96 NO ITEM U 0 .00 0.00 .00 0.00 97 NO ITEM U 0 .00 0.00 .00 0.00 SUMMARY OF AMOUNTS ROAD ITEMS $ 5,921,111.00 $ 6,148,307.00 BRIDGE ITEMS 0.00 0.00 SUB-TOTAL AMOUNTS FOR BRIDGE WORK AGREE AGREE (HEADER) LOW BID =$ 5,921,111.00 (HEADER) 2ND LOW BID =$ 6,148,307.00 COMPUTED LOW BID =$ 5,921,111.00 COMPUTED 2ND LOW BID =$ 6,148,307.00 COMPUTED LOW BID =$ 5,921,111.00 COMPUTED 2ND LOW BID =$ 6,148,307.00