CPSBIDFM-1 DEPARTMENT OF TRANSPORTATION PAGE 1 CONSTRUCTION SERVICES/PROCUREMENT DIVISION TRENTON, NEW JERSEY TABULATION OF BIDS AND UNIT PRICES RE-AD. MAINT. BEAM GUIDE RAIL CONTRACT, CENTRAL-2001 VARIOUS ROUTES IN THE CENTRAL REGION D.P. NO. 01419 BIDS RECEIVED APRIL 12, 2001 CONTRACT AWARD DATE MAY 11, 2001 BIDDERS TOTAL PRICE BID 1 . STATEWIDE HI-WAY SAFETY INC PO#616 $ 1,000,000.00 COUNTY RT#561 SPUR FOLSOM NJ08037 2 . J FLETCHER CREAMER & SON INC $ 1,131,698.00 101 E BROADWAY HACKENSACK NJ07601 ITEM DESCRIPTION UNIT CONTRACT LOW BIDDER 2ND LOW BIDDER NO. QUANTITY UNIT PRICE DOLLAR AMT. UNIT PRICE DOLLAR AMT. 1 PERFORMANCE BOND AND PAYMENT BOND LS 1 5,600.00 5,600.00 1.00 1.00 2 CONSTRUCTION LAYOUT LS 1 1.00 1.00 1.00 1.00 3 CELLULAR PHONE AND PAGER SERVICE LS 1 2,500.00 2,500.00 2,500.00 2,500.00 4 TELEPHONE SERVICE LS 1 500.00 500.00 500.00 500.00 5 OWNER'S AND CONTRACTOR'S PROTECTIVE LS 1 4,000.00 4,000.00 1.00 1.00 LIABILITY INSURANCE 6 MOBILIZATION LS 1 78,696.00 78,696.00 1,000.00 1,000.00 7 SPECIAL MOBILIZATION U 7 500.00 3,500.00 500.00 3,500.00 8 NO ITEM U 0 .00 0.00 .00 0.00 9 EARTH EXCAVATION FOR TEST PITS U 5 1.00 5.00 1,000.00 5,000.00 10 NO ITEM U 0 .00 0.00 .00 0.00 11 ADIEM ENERGY ABSORBING END TREATMENT MOD 40 1,000.00 40,000.00 2,000.00 80,000.00 12 225 BY 400 MM WHITE CONCRETE VERTICAL CURB LM 50 30.00 1,500.00 40.00 2,000.00 13 BEAM GUIDE RAIL LM 4,000 36.00 144,000.00 40.00 160,000.00 14 BEAM GUIDE RAIL, DUAL-FACED LM 125 50.00 6,250.00 55.00 6,875.00 15 SLOTTED GUIDE RAIL TERMINALS U 110 2,000.00 220,000.00 2,500.00 275,000.00 16 EXTRUDER TERMINALS U 15 3,000.00 45,000.00 3,000.00 45,000.00 17 CONTROLLED RELEASE TERMINALS U 8 1,000.00 8,000.00 1,000.00 8,000.00 18 CONTROLLED RELEASE TERMINAL ANCHORAGES U 3 600.00 1,800.00 1,000.00 3,000.00 19 BEAM GUIDE RAIL ANCHORAGES U 4 400.00 1,600.00 800.00 3,200.00 20 TELESCOPING GUIDE RAIL END TERMINALS U 10 5,000.00 50,000.00 4,500.00 45,000.00 21 BEAM GUIDE RAIL POSTS U 100 50.00 5,000.00 40.00 4,000.00 22 BEAM GUIDE RAIL ELEMENT LM 8,500 33.00 280,500.00 11.00 93,500.00 23 RUB RAIL LM 150 20.00 3,000.00 20.00 3,000.00 24 RESET BEAM GUIDE RAIL WITH EXISTING POSTS LM 450 25.00 11,250.00 20.00 9,000.00 25 REMOVAL OF GUIDE RAIL LM 4,000 1.00 4,000.00 10.00 40,000.00 26 BEAM GUIDE RAIL POSTS, EXCLUDING SPACERS U 10 20.00 200.00 25.00 250.00 27 BEAM GUIDE RAIL POSTS, ADDITIONAL LENGTH U 25 50.00 1,250.00 35.00 875.00 28 DRILLING OR CORING FOR BEAM GUIDE RAIL POSTS, U 12 1.00 12.00 100.00 1,200.00 NON-BRIDGE 29 SAWCUTTING FOR BEAM GUIDE RAIL POSTS, LM 15 1.00 15.00 25.00 375.00 NON-BRIDGE 30 BEAM GUIDE RAIL INSTALLATION IN ROCK U 5 10.00 50.00 100.00 500.00 31 RESET BEAM GUIDE RAIL WITH NEW POSTS LM 15 33.00 495.00 35.00 525.00 32 ATTACHMENT TO STRUCTURE, BALUSTRADE DETAIL LM 12 150.00 1,800.00 150.00 1,800.00 NO. CD-612-10.1 33 ATTACHMENT TO STRUCTURE, DETAIL NO. LM 50 150.00 7,500.00 150.00 7,500.00 CD-612-10.2 34 ATTACHMENT TO STRUCTURE, DETAIL NO. U 5 100.00 500.00 500.00 2,500.00 CD-612-10.2, WITH EXISTING BEAM GUIDE RAIL ELEMENT 35 ATTACHMENT TO STRUCTURE, DETAIL NO. U 2 1,500.00 3,000.00 1,000.00 2,000.00 CD-612-9.1, TYPE A 36 ATTACHMENT TO STRUCTURE, DETAIL NO. U 2 100.00 200.00 500.00 1,000.00 CD-612-9.1, TYPE B 37 EXTRA SPACER BLOCKS U 20 10.00 200.00 10.00 200.00 38 REMOVAL OF WIRE ROPE GUARD FENCE LM 50 .50 25.00 10.00 500.00 39 REMOVAL OF DUAL FACED BEAM GUIDE RAIL LM 100 5.00 500.00 10.00 1,000.00 40 REMOVAL OF MEDIAN BREAKAWAY CABLE TERMINAL U 2 250.00 500.00 1,000.00 2,000.00 41 REMOVAL OF BREAKAWAY CABLE TERMINAL-INCLUDING U 2 250.00 500.00 750.00 1,500.00 FOOTING 42 GUIDE RAIL EXTRUDERS U 2 2,000.00 4,000.00 500.00 1,000.00 43 WOOD POSTS FOR EXTRUDER TERMINALS U 15 75.00 1,125.00 375.00 5,625.00 44 BUFFER END PIECES FOR END TREATMENTS U 30 150.00 4,500.00 500.00 15,000.00 45 WOODEN POSTS FOR END TREATMENTS U 30 75.00 2,250.00 375.00 11,250.00 46 RAIL ELEMENTS FOR END TREATMENTS U 50 250.00 12,500.00 500.00 25,000.00 47 REFLECTIVE SHEETING FOR END TREATMENTS SM 100 75.00 7,500.00 100.00 10,000.00 48 BREAKAWAY BARRICADES U 20 1.00 20.00 1.00 20.00 49 DRUMS U 50 1.00 50.00 1.00 50.00 50 TRAFFIC CONES U 150 1.00 150.00 1.00 150.00 51 CONSTRUCTION SIGNS SM 225 1.00 225.00 1.00 225.00 52 TRAFFIC DIRECTORS, FLAGGERS HRS 50 1.00 50.00 50.00 2,500.00 53 ILLUMINATED FLASHING ARROWS, 1200 BY 2400 MM DAY 80 25.00 2,000.00 200.00 16,000.00 54 TRAFFIC CONTROL TRUCKS WITH MOUNTED CRASH DAY 120 100.00 12,000.00 1,500.00 180,000.00 CUSHIONS 55 VARIABLE MESSAGE SIGNS DAY 12 50.00 600.00 300.00 3,600.00 56 ATTACHMENT TO STRUCTURE, DETAIL NO. U 2 100.00 200.00 500.00 1,000.00 CD-612-9.2 57 NO ITEM U 0 .00 0.00 .00 0.00 58 NO ITEM U 0 .00 0.00 .00 0.00 59 TOPSOILING, 100 MM THICK SM 225 5.00 1,125.00 1.00 225.00 60 REGRADE BERM SM 50 5.00 250.00 1.00 50.00 61 FERTILIZING AND SEEDING, TYPE A-3 SM 600 5.00 3,000.00 1.00 600.00 62 STRAW MULCHING SM 600 .01 6.00 1.00 600.00 63 NONVEGETATIVE SURFACE, BITUMINOUS CONCRETE SM 1,500 10.00 15,000.00 30.00 45,000.00 SUMMARY OF AMOUNTS ROAD ITEMS $ 1,000,000.00 $ 1,131,698.00 BRIDGE ITEMS 0.00 0.00 SUB-TOTAL AMOUNTS FOR BRIDGE WORK AGREE AGREE (HEADER) LOW BID =$ 1,000,000.00 (HEADER) 2ND LOW BID =$ 1,131,698.00 COMPUTED LOW BID =$ 1,000,000.00 COMPUTED 2ND LOW BID =$ 1,131,698.00 COMPUTED LOW BID =$ 1,000,000.00 COMPUTED 2ND LOW BID =$ 1,131,698.00