CPSBIDFM-1 DEPARTMENT OF TRANSPORTATION PAGE 1 CONSTRUCTION SERVICES/PROCUREMENT DIVISION TRENTON, NEW JERSEY TABULATION OF BIDS AND UNIT PRICES ROUTE U.S. 9 (1953) SECTION 1M FROM THE VICINITY OF VICTORY CIRCLE TO THE ROUTE 440 INTERCHANGE CONTRACT NO. 131991400 EDISON BRIDGE REHABILITATION GRADING, PAVING, & STRUCTURES BORO. OF SAYREVILLE TWP. OF WOODBRIDGE IN MIDDLESEX COUNTY FEDERAL PROJECT NO. BHF- 1 (207) D.P. NO. 01123 BIDS RECEIVED JUNE 12, 2001 CONTRACT AWARD DATE JULY 02, 2001 BIDDERS TOTAL PRICE BID 1 . SCHIAVONE CONSTR CO $ 42,670,494.00 P O BOX 1589 SECAUCUS NJ07096 2 . GEORGE HARMS CONSTR CO INC $ 48,314,872.24 PO#817 FARMINGDALE NJ07727 ITEM DESCRIPTION UNIT CONTRACT LOW BIDDER 2ND LOW BIDDER NO. QUANTITY UNIT PRICE DOLLAR AMT. UNIT PRICE DOLLAR AMT. 1 PERFORMANCE BOND AND PAYMENT BOND LS 1 200,000.00 200,000.00 150,000.00 150,000.00 2 FINAL CLEANUP LS 1 30,000.00 30,000.00 20,000.00 20,000.00 3 CONSTRUCTION LAYOUT LS 1 500,000.00 500,000.00 750,000.00 750,000.00 4 FIELD OFFICE TYPE F SET-UP U 1 70,000.00 70,000.00 40,000.00 40,000.00 5 FIELD OFFICE TYPE F MAINTENANCE MO 33 1,500.00 49,500.00 3,000.00 99,000.00 6 TELEPHONE SERVICE LS 1 8,250.00 8,250.00 8,250.00 8,250.00 7 MATERIALS FIELD LABORATORY SET-UP U 1 15,000.00 15,000.00 24,000.00 24,000.00 8 MATERIALS FIELD LABORATORY MAINTENANCE MO 33 750.00 24,750.00 1,625.00 53,625.00 9 FUEL PRICE ADJUSTMENT LS 1 8,200.00 8,200.00 8,200.00 8,200.00 10 TRAINEES HRS 18,000 2.00 36,000.00 1.25 22,500.00 11 OWNER'S AND CONTRACTOR'S PROTECTIVE LS 1 60,000.00 60,000.00 20,000.00 20,000.00 LIABILITY INSURANCE 12 PROGRESS SCHEDULE LS 1 30,000.00 30,000.00 5,000.00 5,000.00 13 MOBILIZATION LS 1 4,000,000.00 4,000,000.00 4,800,000.00 4,800,000.00 14 CLEARING SITE LS 1 70,000.00 70,000.00 100,000.00 100,000.00 15 SEALING OF MONITORING WELLS U 3 500.00 1,500.00 420.00 1,260.00 16 STRIPPING HA 1 15,000.00 15,000.00 10,000.00 10,000.00 17 ROADWAY EXCAVATION, UNCLASSIFIED CM 13,775 20.00 275,500.00 11.00 151,525.00 18 ROADWAY EXCAVATION, EARTH CM 10,134 15.00 152,010.00 5.50 55,737.00 19 REMOVAL OF CONCRETE BASE COURSE AND SM 7,451 13.00 96,863.00 8.00 59,608.00 CONCRETE SURFACE COURSES 20 REMOVAL OF APPROACH SLABS, 450 MM THICK SM 242 50.00 12,100.00 17.25 4,174.50 21 SAWCUTTING LM 1,216 30.00 36,480.00 11.50 13,984.00 22 MILLING, VARIABLE DEPTH SM 5,072 6.00 30,432.00 2.35 11,919.20 23 HEALTH AND SAFETY PLAN LS 1 16,000.00 16,000.00 5,000.00 5,000.00 24 EARTH EXCAVATION FOR TEST PITS CM 10 150.00 1,500.00 130.00 1,300.00 25 SUBBASE CM 2,874 30.00 86,220.00 49.00 140,826.00 26 TEMPORARY CONSTRUCTION ACCESS ROAD LS 1 80,000.00 80,000.00 160,000.00 160,000.00 27 NO ITEM U 0 .00 0.00 .00 0.00 28 SILT FENCE LM 653 10.00 6,530.00 13.50 8,815.50 29 INLET FILTERS U 36 80.00 2,880.00 90.00 3,240.00 30 INLET PROTECTION, HAYBALE BARRIER U 3 80.00 240.00 140.00 420.00 31 CONSTRUCTION DRIVEWAY MGR 50 130.00 6,500.00 30.00 1,500.00 32 HAYBALES U 15 15.00 225.00 22.00 330.00 33 NO ITEM U 0 .00 0.00 .00 0.00 34 NO ITEM U 0 .00 0.00 .00 0.00 35 NO ITEM U 0 .00 0.00 .00 0.00 36 DENSE GRADED AGGREGATE BASE COURSE, SM 13,808 12.00 165,696.00 7.00 96,656.00 200 MM THICK 37 BITUMINOUS-STABILIZED BASE COURSE, MIX I-2 MGR 7,228 55.00 397,540.00 47.00 339,716.00 38 BRIDGE APPROACH SLABS, 450 MM THICK SM 226 120.00 27,120.00 206.00 46,556.00 39 BRIDGE APPROACH TRANSITION SLABS, SM 270 90.00 24,300.00 155.00 41,850.00 350 MM AVERAGE THICKNESS 40 BITUMINOUS CONCRETE SURFACE COURSE MIX I-4 HD MGR 2,814 55.00 154,770.00 50.00 140,700.00 41 TACK COAT L 4,260 1.00 4,260.00 1.15 4,899.00 42 PRIME COAT L 16,460 1.00 16,460.00 .55 9,053.00 43 ASPHALT PRICE ADJUSTMENT LS 1 28,000.00 28,000.00 28,000.00 28,000.00 44 375 MM REINFORCED CONCRETE CULVERT PIPE LM 1 130.00 130.00 2,100.00 2,100.00 45 450 MM REINFORCED CONCRETE CULVERT PIPE LM 17 150.00 2,550.00 150.00 2,550.00 46 375 MM REINFORCED CONCRETE CULVERT PIPE LM 231 150.00 34,650.00 145.00 33,495.00 47 450 MM REINFORCED CONCRETE CULVERT PIPE LM 410 170.00 69,700.00 175.00 71,750.00 48 600 MM REINFORCED CONCRETE CULVERT PIPE LM 11 3,000.00 33,000.00 460.00 5,060.00 49 375 MM CORRUGATED ALUMINUM ALLOY CULVERT PIPE LM 0 .00 0.00 0.00 50 450 MM CORRUGATED ALUMINUM ALLOY CULVERT PIPE LM 0 .00 0.00 0.00 51 600 MM CORRUGATED ALUMINUM ALLOY CULVERT PIPE LM 0 .00 0.00 0.00 52 INLETS, TYPE B U 11 6,000.00 66,000.00 8,500.00 93,500.00 53 INLETS, TYPE B-2 U 1 3,000.00 3,000.00 3,400.00 3,400.00 54 INLETS, TYPE D-1 U 17 3,000.00 51,000.00 6,200.00 105,400.00 55 INLETS, TYPE D-2 U 3 2,500.00 7,500.00 3,000.00 9,000.00 56 INLETS CONVERTED TO MANHOLES U 2 2,500.00 5,000.00 3,200.00 6,400.00 57 MANHOLES U 2 2,500.00 5,000.00 2,600.00 5,200.00 58 RESET CASTINGS U 5 300.00 1,500.00 380.00 1,900.00 59 CLEANING EXISTING PIPE, 300 TO 600 MM LM 440 50.00 22,000.00 22.50 9,900.00 DIAMETER 60 OUTLET STRUCTURE N0. 1 U 1 8,000.00 8,000.00 11,000.00 11,000.00 61 INLETS, TYPE A U 1 2,000.00 2,000.00 2,000.00 2,000.00 62 CLEANING EXISTING PIPE, OVER 600 TO LM 63 100.00 6,300.00 86.00 5,418.00 1 200 MM DIAMETER 63 MANHOLES, UTILITY U 2 30,000.00 60,000.00 8,700.00 17,400.00 64 620 MM BY VARIABLE HEIGHT WHITE LM 76 500.00 38,000.00 485.00 36,860.00 CONCRETE BARRIER CURB 65 670 MM BY VARIABLE HEIGHT WHITE CONCRETE LM 23 800.00 18,400.00 840.00 19,320.00 BARRIER CURB 66 990 BY 1 040 MM WHITE CONCRETE BARRIER CURB 990 24 500.00 12,000.00 500.00 12,000.00 67 600 BY 1 040 MM WHITE CONCRETE BARRIER CURB LM 924 180.00 166,320.00 185.00 170,940.00 68 225 BY 400 MM WHITE CONCRETE VERTICAL CURB LM 829 60.00 49,740.00 54.00 44,766.00 69 CONCRETE SIDEWALK, 100 MM THICK SM 3 38.00 114.00 40.00 120.00 70 WHITE CONCRETE ISLAND, 100 MM THICK SM 11 50.00 550.00 52.00 572.00 71 CONCRETE HEADWALLS CM 3 2,000.00 6,000.00 1,400.00 4,200.00 72 MONUMENTS U 7 100.00 700.00 300.00 2,100.00 73 NO ITEM U 0 .00 0.00 .00 0.00 74 BEAM GUIDE RAIL LM 270 70.00 18,900.00 72.00 19,440.00 75 RESET BEAM GUIDE RAIL WITH EXISTING POSTS LM 955 21.00 20,055.00 22.00 21,010.00 76 SLOTTED GUIDE RAIL TERMINALS U 5 2,500.00 12,500.00 2,300.00 11,500.00 77 NO ITEM U 0 .00 0.00 .00 0.00 78 BEAM GUIDE RAIL ANCHORAGES U 5 700.00 3,500.00 650.00 3,250.00 79 RUB RAIL LM 56 25.00 1,400.00 24.00 1,344.00 80 REMOVAL OF GUIDE RAIL LM 554 7.00 3,878.00 7.25 4,016.50 81 MISCELLANEOUS CONCRETE CM 2 800.00 1,600.00 1,000.00 2,000.00 82 SNOW FENCE, PLASTIC LM 906 8.00 7,248.00 8.50 7,701.00 83 RIPRAP STONE CHANNEL PROTECTION, 300 MM THICK SM 59 60.00 3,540.00 75.00 4,425.00 (D50=150 MM) 84 CHAIN-LINK FENCE, 1.8 M HIGH LM 279 120.00 33,480.00 54.00 15,066.00 85 GATES, CHAIN-LINK FENCE, 6.0 M WIDE U 1 3,000.00 3,000.00 735.00 735.00 86 BREAKAWAY BARRICADES U 45 100.00 4,500.00 150.00 6,750.00 87 PRECAST CONCRETE CURB, CONSTRUCTION BARRIER, LM 1,200 80.00 96,000.00 125.00 150,000.00 TYPE 4 88 NO ITEM U 0 .00 0.00 .00 0.00 89 DRUMS U 350 80.00 28,000.00 100.00 35,000.00 90 CONSTRUCTION IDENTIFICATION SIGNS, U 2 1,000.00 2,000.00 875.00 1,750.00 1 200 BY 2 400 MM 91 VARIABLE MESSAGE SIGNS U 4 13,000.00 52,000.00 8,500.00 34,000.00 92 CONSTRUCTION SIGNS SM 134 120.00 16,080.00 295.00 39,530.00 93 ILLUMINATED FLASHING ARROWS, U 2 6,000.00 12,000.00 1,900.00 3,800.00 1 200 BY 2 400 MM 94 TRAFFIC CONTROL TRUCKS WITH MOUNTED U 2 12,000.00 24,000.00 10,000.00 20,000.00 CRASH CUSHIONS 95 TEMPORARY CRASH CUSHIONS, INERTIAL BARRIER U 3 5,000.00 15,000.00 3,200.00 9,600.00 SYSTEM, 12 MODULES 96 TEMPORARY CRASH CUSHIONS, INERTIAL BARRIER U 1 8,000.00 8,000.00 3,300.00 3,300.00 SYSTEM, 15 MODULES 97 REMOVABLE PAVEMENT MARKING TAPE LM 7,600 4.00 30,400.00 3.40 25,840.00 98 TRAFFIC DIRECTORS, FLAGGERS HRS 800 40.00 32,000.00 45.00 36,000.00 99 TRAFFIC STRIPES LM 1,000 .60 600.00 1.25 1,250.00 100 TRAFFIC STRIPES, LONG LIFE, EPOXY RESIN LM 11,630 1.20 13,956.00 1.00 11,630.00 101 REMOVABLE BLACK LINE MASK, 200MM LM 1,000 10.00 10,000.00 8.75 8,750.00 102 TRAFFIC MARKINGS, LINES, LONG LIFE, LM 340 1.50 510.00 4.20 1,428.00 THERMOPLASTIC 103 REMOVAL OF TRAFFIC STRIPES AND MARKINGS LM 8,250 1.20 9,900.00 .90 7,425.00 104 TWO-WAY PLOWABLE MONO-DIRECTIONAL U 372 30.00 11,160.00 30.00 11,160.00 WHITE PAVEMENT REFLECTORS AND CASTINGS 105 TWO-WAY PLOWABLE MONO-DIRECTIONAL U 188 30.00 5,640.00 30.00 5,640.00 AMBER PAVEMENT REFLECTORS AND CASTINGS 106 REMOVAL OF GUIDE SIGN PANELS, TYPE GO SM 49 180.00 8,820.00 168.00 8,232.00 107 SIGNS SM 20 300.00 6,000.00 315.00 6,300.00 108 GUIDE SIGNS, TYPE GA, STEEL "U" POST SUPPORTS SM 47 300.00 14,100.00 315.00 14,805.00 109 GUIDE SIGN PANELS, TYPE GO SM 85 330.00 28,050.00 340.00 28,900.00 110 FLEXIBLE DELINEATORS, GUIDE RAIL MOUNTED U 60 30.00 1,800.00 27.00 1,620.00 111 FLEXIBLE DELINEATORS, BARRIER CURB MOUNTED U 284 20.00 5,680.00 16.00 4,544.00 112 NO ITEM U 0 .00 0.00 .00 0.00 113 41 MM RIGID METALLIC CONDUIT, TYPE CUG LM 8 56.00 448.00 100.00 800.00 114 53 MM RIGID METALLIC CONDUIT, TYPE CUG LM 168 50.00 8,400.00 60.00 10,080.00 115 78 MM RIGID METALLIC CONDUIT, TYPE CUG LM 441 60.00 26,460.00 60.00 26,460.00 116 103 MM RIGID METALLIC CONDUIT, TYPE CUG LM 195 75.00 14,625.00 77.00 15,015.00 117 78 MM RIGID NONMETALLIC CONDUIT LM 170 33.00 5,610.00 55.00 9,350.00 118 GROUND WIRE, NO. 8 AWG LM 1,874 4.00 7,496.00 3.40 6,371.60 119 MULTIPLE LIGHTING WIRE, NO. 2 AWG LM 7,639 8.00 61,112.00 7.45 56,910.55 120 MULTIPLE LIGHTING WIRE, NO. 6 AWG LM 2,016 7.00 14,112.00 6.15 12,398.40 121 MULTIPLE LIGHTING WIRE, NO. 8 AWG LM 216 6.00 1,296.00 5.70 1,231.20 122 MULTIPLE LIGHTING WIRE, NO. 10 AWG LM 27 4.00 108.00 3.25 87.75 123 SERVICE WIRE, NO. 2 AWG LM 258 8.00 2,064.00 7.75 1,999.50 124 SERVICE WIRE, NO. 6 AWG LM 75 7.00 525.00 6.15 461.25 125 FOUNDATIONS, TYPE MCF U 2 800.00 1,600.00 635.00 1,270.00 126 FOUNDATIONS, TYPE 1M-MC U 2 1,600.00 3,200.00 1,400.00 2,800.00 127 JUNCTION BOX FOUNDATIONS U 6 1,220.00 7,320.00 1,600.00 9,600.00 128 965 MM JUNCTION BOXES U 4 2,200.00 8,800.00 2,400.00 9,600.00 129 450 BY 900 MM JUNCTION BOXES U 11 1,200.00 13,200.00 1,600.00 17,600.00 130 TWO 53 MM RIGID NON-METALLIC CONDUIT, LM 478 50.00 23,900.00 60.00 28,680.00 TYPE GA 131 MULTIPLE LIGHTING WIRE, NO. 10 AWG LM 263 4.00 1,052.00 3.25 854.75 132 INSTALL 103 MM FIBERGLASS MULTI-DUCTS LM 75 60.00 4,500.00 105.00 7,875.00 133 TELEPHONE CABLE, 6/C #22 AWG, SHEILDED LM 289 8.00 2,312.00 7.50 2,167.50 134 NO ITEM U 0 .00 0.00 .00 0.00 135 LOOP DETECTOR LM 87 31.00 2,697.00 31.00 2,697.00 136 LOOP DETECTOR LEAD LM 288 6.00 1,728.00 5.25 1,512.00 137 NO ITEM U 0 .00 0.00 .00 0.00 138 LIGHTING ASSEMBLIES, TYPE L-R-12.2-CF-Y U 11 570.00 6,270.00 560.00 6,160.00 139 LIGHTING STANDARD ASSEMBLIES, U 4 2,500.00 10,000.00 2,400.00 9,600.00 TYPE L-2.4-12.2-CF-X 140 LIGHTING STANDARD ASSEMBILIES U 2 2,500.00 5,000.00 2,450.00 4,900.00 TYPE L-4.6-12.2-CF-X 141 LIGHTING STANDARD ASSEMBILIES U 1 2,500.00 2,500.00 2,450.00 2,450.00 TYPE L-4.6-12.2-CF-X 142 METER CABINETS, TYPE 1M-MC U 2 5,500.00 11,000.00 5,200.00 10,400.00 143 LIGHTING STANDARD ASSEMBLIES, U 22 2,200.00 48,400.00 2,200.00 48,400.00 TYPE L-2.4-12.2-SB-CF-Y2 144 SIGN LIGHTING ASSEMBLY, STRUCTURE NO. 1 LS 1 7,500.00 7,500.00 7,200.00 7,200.00 145 SIGN LIGHTING ASSEMBLY, STRUCTURE NO. 2 LS 1 7,500.00 7,500.00 7,200.00 7,200.00 146 SIGN LIGHTING ASSEMBLY, LS 1 8,600.00 8,600.00 8,500.00 8,500.00 STRUCTURE NO. 1209.213 147 RELOCATED VARIABLE MESSAGE SIGN, LS 1 10,000.00 10,000.00 26,000.00 26,000.00 STRUCTURE NO. 1 148 RELOCATED VARIABLE MESSAGE SIGN, LS 1 10,000.00 10,000.00 26,000.00 26,000.00 STRUCTURE NO. 2 149 FOUNDATIONS, TYPE VMS U 2 1,200.00 2,400.00 2,800.00 5,600.00 150 FOUNDATIONS, TYPE 1M-MC (TC) U 1 2,000.00 2,000.00 2,600.00 2,600.00 151 METER CABINETS, TYPE MC U 3 1,500.00 4,500.00 1,500.00 4,500.00 152 METER CABINETS, TYPE 1M-TC U 1 37,000.00 37,000.00 36,000.00 36,000.00 153 MULTI-CONDUCTOR CABLE, 15 PAIR #18 AWG LM 154 15.00 2,310.00 15.00 2,310.00 154 MULTI-CONDUCTOR CABLE, 12/C #20 AWG, SHEILDED LM 51 17.00 867.00 16.00 816.00 155 BRIDGE NAVIGATIONAL LIGHTS LS 1 40,000.00 40,000.00 39,000.00 39,000.00 156 RELOCATE TRAFFIC DETECTORS LS 1 6,000.00 6,000.00 5,200.00 5,200.00 157 PREPARATION OF EXISTING SOIL SM 2,155 1.00 2,155.00 1.25 2,693.75 158 TOPSOILING, 100 MM THICK SM 10,618 1.50 15,927.00 4.50 47,781.00 159 BORROW TOPSOIL CM 297 30.00 8,910.00 31.50 9,355.50 160 FERTILIZING AND SEEDING, TYPE A-3 SM 8,463 .50 4,231.50 .45 3,808.35 161 FERTILIZING AND SEEDING, TYPE F SM 1,062 .50 531.00 .45 477.90 162 FERTILIZING AND SEEDING, TYPE W-2 SM 2,155 .50 1,077.50 .45 969.75 163 STRAW MULCHING SM 11,680 .50 5,840.00 .45 5,256.00 164 WOOD MULCHING SM 25 4.00 100.00 4.20 105.00 165 MOWING HA 3 500.00 1,500.00 525.00 1,575.00 166 LIQUIDAMBAR STYRACIFLUA, B&B, 50 TO 60 MM U 7 300.00 2,100.00 235.00 1,645.00 CALIPER, 3.0 TO 3.6 M HIGH 167 MALUS 'SNOWDRIFT', B&B, 40 TO 45 MM U 3 200.00 600.00 152.00 456.00 CALIPER, 1.8 TO 2.0 M HIGH 168 PINUS STROBUS, B&B, 1.8 TO 2.0 M HIGH U 13 200.00 2,600.00 145.00 1,885.00 169 PINUS STROBUS, B&B, 2.5 TO 2.7 M HIGH U 17 200.00 3,400.00 200.00 3,400.00 170 QUERCUS PALUSTRIS, B&B, 50 TO 60 MM CALIPER, U 5 250.00 1,250.00 250.00 1,250.00 3.6 TO 4.2 M HIGH 171 TOPSOIL CM 9 20.00 180.00 21.00 189.00 172 WATERING CM 7 80.00 560.00 80.00 560.00 173 NONVEGETATIVE SURFACE, BITUMINOUS CONCRETE SM 4,734 35.00 165,690.00 30.00 142,020.00 174 SUBSOIL TILLAGE SM 2,155 1.50 3,232.50 1.30 2,801.50 175 NO ITEM U 0 .00 0.00 .00 0.00 176 NO ITEM U 0 .00 0.00 .00 0.00 177 NO ITEM U 0 .00 0.00 .00 0.00 178 NO ITEM U 0 .00 0.00 .00 0.00 179 NO ITEM U 0 .00 0.00 .00 0.00 180 NO ITEM U 0 .00 0.00 .00 0.00 181 NO ITEM U 0 .00 0.00 .00 0.00 182 NO ITEM U 0 .00 0.00 .00 0.00 183 NO ITEM U 0 .00 0.00 .00 0.00 184 NO ITEM U 0 .00 0.00 .00 0.00 ROUTE U.S. 9 NORTHBOUND OVER RARITAN RIVER 185 TEMPORARY SHIELDING LS 1 100,000.00 100,000.00 1,000,000.00 1,000,000.00 186 CLEARING SITE, BRIDGE LS 1 4,000,000.00 4,000,000.00 4,000,000.00 4,000,000.00 187 CLEARING SITE, BRIDGE CM 2,560 900.00 2,304,000.00 937.50 2,400,000.00 (STRUCTURE NO. 1209-155, PIERS 188 BRIDGE EXCAVATION CM 36 80.00 2,880.00 79.00 2,844.00 189 CONCRETE IN SUBSTRUCTURES, ABUTMENT WALLS CM 140 600.00 84,000.00 900.00 126,000.00 190 REINFORCEMENT STEEL IN STRUCTURES KG 380,371 3.00 1,141,113.00 1.75 665,649.25 191 SAWCUT GROOVED DECK SURFACE SM 19,183 2.50 47,957.50 7.00 134,281.00 192 CONCRETE IN SUBSTRUCTURES, PIER COLUMNS AND CM 2,961 1,000.00 2,961,000.00 1,600.00 4,737,600.00 CAPS 193 CONCRETE IN SUPERSTRUCTURE, SIDEWALKS CM 26 300.00 7,800.00 405.00 10,530.00 194 STRIP SEAL EXPANSION DAM LM 64 400.00 25,600.00 875.00 56,000.00 195 MODULAR EXPANSION JOINT SYSTEM - 5 CELL LM 32 1,000.00 32,000.00 4,600.00 147,200.00 196 MODULAR EXPANSION JOINT SYSTEM - 2 CELL LM 32 2,000.00 64,000.00 1,900.00 60,800.00 197 REINFORCEMENT STEEL IN STRUCTURES, EPOXY KG 1,112,561 2.00 2,225,122.00 1.85 2,058,237.85 COATED 198 EPOXY WATERPROOFING SEAL COAT SM 448 40.00 17,920.00 50.00 22,400.00 199 PRESSURE INJECTION, CONCRETE CRACKS LM 145 300.00 43,500.00 180.00 26,100.00 200 CONCRETE IN SUPERSTRUCTURE, PARAPETS-HPC LM 2,732 50.00 136,600.00 185.00 505,420.00 201 STRUCTURAL STEEL LS 1 12,584,000.00 12,584,000.00 10,915,000.00 10,915,000.00 202 SEISMIC ISOLATION BEARINGS U 180 4,000.00 720,000.00 4,300.00 774,000.00 203 SHEAR CONNECTORS U 58,290 2.00 116,580.00 1.65 96,178.50 204 4-BAR OPEN STEEL BRIDGE RAILING LM 2,725 140.00 381,500.00 540.00 1,471,500.00 205 INSTALL 103 MM FIBERGLASS MULTI-DUCTS LM 2,678 10.00 26,780.00 50.00 133,900.00 206 TEMPORARY CONSTRUCTION TRESTLE LS 1 1,000.00 1,000.00 2,500,000.00 2,500,000.00 207 200 MM STEEL ALLOY PIPE LM 377 600.00 226,200.00 465.00 175,305.00 208 INLET FRAMES AND GRATES U 26 2,000.00 52,000.00 3,750.00 97,500.00 209 MEMBRANE WATERPROOFING SM 10 100.00 1,000.00 135.00 1,350.00 210 CONCRETE IN SUPERSTRUCTURE, DECK SLABS - HPC CM 5,982 750.00 4,486,500.00 740.00 4,426,680.00 211 CONCRETE IN HEADBLOCKS - HPC CM 10 800.00 8,000.00 1,635.00 16,350.00 212 PRECAST CONCRETE DECORATIVE PANELS SM 852 300.00 255,600.00 415.00 353,580.00 213 PRECAST CONCRETE DECORATIVE BANDS U 112 400.00 44,800.00 1,400.00 156,800.00 214 CLEANING OF FAIENCE TILES LS 1 2,000.00 2,000.00 1,800.00 1,800.00 215 PRESSURE INJECTION OF GRANITE CRACKS LM 45 200.00 9,000.00 475.00 21,375.00 216 REPOINTING OF JOINTS LM 27 300.00 8,100.00 475.00 12,825.00 217 DEWATERING FOR THE GRANITE MASONRY REPAIRS U 4 3,000.00 12,000.00 2,500.00 10,000.00 218 CLEANING OF GRANITE MASONRY LS 1 13,000.00 13,000.00 6,000.00 6,000.00 219 REPLACEMENT AND/OR RESETTING OF STONES SM 13 500.00 6,500.00 6,500.00 84,500.00 220 REPAIR OF SPALLED CONCRETE SM 18 300.00 5,400.00 1,200.00 21,600.00 221 RIPRAP STONE SLOPE PROTECTION, 400 MM THICK SM 931 60.00 55,860.00 34.00 31,654.00 (D50=200 MM) 222 200 MM CORRUGATED STEEL CULVERT PIPE LM 20 150.00 3,000.00 120.50 2,410.00 223 41 MM RIGID METALLIC CONDUIT, TYPE CUG LM 27 60.00 1,620.00 75.00 2,025.00 224 78 MM RIGID METALLIC CONDUIT, TYPE CUG LM 1,366 60.00 81,960.00 27.50 37,565.00 225 JUNCTION BOX FRAMES AND COVERS U 28 700.00 19,600.00 445.00 12,460.00 226 53 MM RIGID METALLIC CONDUIT, TYPE CUG LM 2,732 50.00 136,600.00 21.50 58,738.00 227 ELECTROCHEMICAL CHLORIDE EXTRACTION SYSTEM SM 1,046 50.00 52,300.00 200.00 209,200.00 228 NO ITEM U 0 .00 0.00 .00 0.00 229 NO ITEM U 0 .00 0.00 .00 0.00 230 NO ITEM U 0 .00 0.00 .00 0.00 231 NO ITEM U 0 .00 0.00 .00 0.00 232 NO ITEM U 0 .00 0.00 .00 0.00 233 NO ITEM U 0 .00 0.00 .00 0.00 234 NO ITEM U 0 .00 0.00 .00 0.00 FENDERING 235 CLEARING SITE, STRUCTURE LS 1 60,000.00 60,000.00 60,000.00 60,000.00 236 TREATED TIMBER STRUCTURES CM 12 10,000.00 120,000.00 4,500.00 54,000.00 237 TREATED TIMBER STRUCTURES, SHEETING CM 42 3,000.00 126,000.00 1,200.00 50,400.00 238 TREATED TIMBER STRUCTURES, WALES CM 87 5,000.00 435,000.00 3,000.00 261,000.00 239 TEST PILES, DRIVEN LM 82 70.00 5,740.00 230.00 18,860.00 240 TEST PILES, FURNISHED LM 92 30.00 2,760.00 41.00 3,772.00 241 FURNISHING EQUIPMENT FOR DRIVING PILES LS 1 30,000.00 30,000.00 50,000.00 50,000.00 242 TREATED TIMBER PILES, DRIVEN, 300 MM DIAMETER LM 3,070 60.00 184,200.00 22.00 67,540.00 243 TREAT TIMBER PILES, FURNISHED, 300 MM LM 3,620 30.00 108,600.00 41.00 148,420.00 DIAMETER 244 CAST-IN-PLACE CONCRETE PILES, DRIVEN, LM 50 250.00 12,500.00 1,300.00 65,000.00 1219 MM DIAMETER 245 CAST-IN-PLACE CONCRETE PILES, FURNISHED LM 58 700.00 40,600.00 475.00 27,550.00 1219 MM DIAMETER 246 PILE SHOES U 160 50.00 8,000.00 85.00 13,600.00 247 FALL ARREST SYSTEM LS 1 60,000.00 60,000.00 38,000.00 38,000.00 248 NO ITEM U 0 .00 0.00 .00 0.00 249 NO ITEM U 0 .00 0.00 .00 0.00 BULKHEAD AT NORTH SHORE LINE 250 CLEARING SITE, STRUCTURE LS 1 6,000.00 6,000.00 6,000.00 6,000.00 251 STEEL SHEET PILING SM 134 700.00 93,800.00 1,100.00 147,400.00 252 METAL RAILING (3 RAIL ALUMINUM) LM 68 200.00 13,600.00 275.00 18,700.00 253 NO ITEM U 0 .00 0.00 .00 0.00 254 NO ITEM U 0 .00 0.00 .00 0.00 RETAINING WALL W-1 @ STA. 28+540 TO STA. 28+570 255 FOUNDATION EXCAVATION CM 52 60.00 3,120.00 100.00 5,200.00 256 REINFORCEMENT STEEL IN STRUCTURES KG 1,967 2.00 3,934.00 1.70 3,343.90 257 CONCRETE IN STRUCTURES, RETAINING WALLS CM 75 500.00 37,500.00 485.00 36,375.00 258 REINFORCEMENT STEEL IN STRUCTURES, EPOXY KG 952 6.00 5,712.00 1.75 1,666.00 COATED 259 CONCRETE IN SUPERSTRUCTURE, PARAPETS LM 29 600.00 17,400.00 1,000.00 29,000.00 260 CLEARING SITE, STRUCTURE (RETAINING LS 1 10,000.00 10,000.00 14,000.00 14,000.00 WALL 'A' RTE. US 9 SB STA 18+510 TO STA 18+570) 261 NO ITEM U 0 .00 0.00 .00 0.00 OVERHEAD SIGN SUPPORT STRUCTURES 262 CLEARING SITE, STRUCTURE LS 1 30,000.00 30,000.00 22,000.00 22,000.00 263 FOUNDATION EXCAVATION CM 198 70.00 13,860.00 25.00 4,950.00 264 CONCRETE IN STRUCTURES, FOOTINGS CM 60 200.00 12,000.00 625.00 37,500.00 265 REINFORCEMENT STEEL IN STRUCTURES KG 2,126 2.00 4,252.00 1.70 3,614.20 266 TEMPORARY SHEETING SM 59 50.00 2,950.00 .01 .59 267 OVERHEAD SIGN SUPPORT, STRUCTURE NO. 1 U 1 50,000.00 50,000.00 74,000.00 74,000.00 268 OVERHEAD SIGN SUPPORT, STRUCTURE NO. 2 U 1 60,000.00 60,000.00 83,000.00 83,000.00 269 NO ITEM U 0 .00 0.00 .00 0.00 270 NO ITEM U 0 .00 0.00 .00 0.00 271 NO ITEM U 0 .00 0.00 .00 0.00 SUMMARY OF AMOUNTS ROAD ITEMS $ 8,608,573.50 $ 9,386,622.95 BRIDGE ITEMS $ 34,061,920.50 $ 38,928,249.29 SUB-TOTAL AMOUNTS FOR BRIDGE WORK ROUTE U.S. 9 NORTHBOUND OVER RARITAN RIVER $ 32,504,392.50 $ 37,583,357.60 FENDERING $ 1,193,400.00 $ 858,142.00 BULKHEAD AT NORTH SHORE LINE $ 113,400.00 $ 172,100.00 RETAINING WALL W-1 @ STA. 28+540 TO STA. 28+570 $ 77,666.00 $ 89,584.90 OVERHEAD SIGN SUPPORT STRUCTURES $ 173,062.00 $ 225,064.79 AGREE AGREE (HEADER) LOW BID =$ 42,670,494.00 (HEADER) 2ND LOW BID =$ 48,314,872.24 COMPUTED LOW BID =$ 42,670,494.00 COMPUTED 2ND LOW BID =$ 48,314,872.24 COMPUTED LOW BID =$ 42,670,494.00 COMPUTED 2ND LOW BID =$ 48,314,872.24