CPSBIDFM-1 DEPARTMENT OF TRANSPORTATION PAGE 1 CONSTRUCTION SERVICES/PROCUREMENT DIVISION TRENTON, NEW JERSEY TABULATION OF BIDS AND UNIT PRICES THE REPLACEMENT OF FANNY ROAD BRIDGE OVER NEW JERSEY TRANSIT WIDENING, REALIGNMENT, RECONSTRUCTION & BRIDGE REPLACEMENT. TOWN OF BOONTON, TOWNSHIP OF PARSIPPANY - TROY HILLS AND BOROUGH OF MOUNTAIN LAKES, COUNTY OF MORRIS. FEDERAL PROJECT NUMBER: BRM-8019(104) D.P. NO. 02108 BIDS RECEIVED MAY 02, 2002 CONTRACT AWARD DATE MAY 16, 2002 BIDDERS TOTAL PRICE BID 1 . J FLETCHER CREAMER & SON INC $ 3,697,349.90 101 E BROADWAY HACKENSACK NJ07601 2 . RENCOR INC $ 3,971,327.30 24 TANNERY ROAD SUITE 1B SOMERVILLE NJ08870 3 . MARBRO INC $ 4,471,117.00 127 PINE STREET MONTCLAIR NJ07042 4 . M J PAQUET INC $ 4,546,432.20 342 COMMERCIAL AVE PALASADES PARK NJ07650 5 . CARBRO CONSTRUCTORS CORP $ 4,733,003.40 605 OMNI DRIVE HILLSBOROUGH NJ08876 6 . ROSANGELA CONTRACTING CO INC $ 4,938,378.53 P O BOX M CLIFFWOOD NJ07721 7 . MERCO INC T/A MERCO INC OF NJ $ 5,108,282.00 1117 RT#31 S LEBANON NJ08833 8 . IEW CONSTR GP $ 5,167,057.10 PO#8008 TRENTON NJ08650 9 . RITACCO CONSTRUCTION INC $ 5,296,518.59 10 LAWRENCE STREET BELLEVILLE NJ07109 ITEM DESCRIPTION UNIT CONTRACT LOW BIDDER 2ND LOW BIDDER NO. QUANTITY UNIT PRICE DOLLAR AMT. UNIT PRICE DOLLAR AMT. 1 PERFORMANCE BOND AND PAYMENT BOND LS 1 10,000.00 10,000.00 75,000.00 75,000.00 2 FINAL CLEANUP LS 1 10,000.00 10,000.00 5,000.00 5,000.00 3 CONSTRUCTION LAYOUT LS 1 30,000.00 30,000.00 25,000.00 25,000.00 4 FIELD OFFICE TYPE B SET-UP U 1 20,000.00 20,000.00 30,000.00 30,000.00 5 FIELD OFFICE TYPE B MAINTENANCE MO 15 1,000.00 15,000.00 1,500.00 22,500.00 6 TELEPHONE SERVICE LS 1 6,000.00 6,000.00 6,000.00 6,000.00 7 NO ITEM U 0 .00 0.00 .00 0.00 8 NO ITEM U 0 .00 0.00 .00 0.00 9 FUEL PRICE ADJUSTMENT LS 1 11,400.00 11,400.00 11,400.00 11,400.00 10 NO ITEM U 0 .00 0.00 .00 0.00 11 NO ITEM U 0 .00 0.00 .00 0.00 12 NO ITEM U 0 .00 0.00 .00 0.00 13 TRAINEES HRS 2,000 .01 20.00 15.00 30,000.00 14 OWNER'S AND CONTRACTOR'S PROTECTIVE LS 1 7,000.00 7,000.00 5,000.00 5,000.00 LIABILITY INSURANCE 15 RAILROAD PROTECTIVE LIABILITY INSURANCE LS 1 25,000.00 25,000.00 10,000.00 10,000.00 16 POLLUTION LIABILITY INSURANCE LS 1 6,000.00 6,000.00 1.00 1.00 17 PROGRESS SCHEDULE LS 1 6,000.00 6,000.00 5,000.00 5,000.00 18 MOBILIZATION LS 1 369,000.00 369,000.00 120,000.00 120,000.00 19 NO ITEM U 0 .00 0.00 .00 0.00 20 NO ITEM U 0 .00 0.00 .00 0.00 21 NO ITEM U 0 .00 0.00 .00 0.00 22 CLEARING SITE LS 1 30,000.00 30,000.00 60,000.00 60,000.00 23 NO ITEM U 0 .00 0.00 .00 0.00 24 NO ITEM U 0 .00 0.00 .00 0.00 25 NO ITEM U 0 .00 0.00 .00 0.00 26 NO ITEM U 0 .00 0.00 .00 0.00 27 NO ITEM U 0 .00 0.00 .00 0.00 28 NO ITEM U 0 .00 0.00 .00 0.00 29 NO ITEM U 0 .00 0.00 .00 0.00 30 SAMPLING AND ANALYSIS FOR DISPOSAL, AND/OR U 5 100.00 500.00 1,000.00 5,000.00 RECYCLING 31 OFF-SITE MANAGEMENT OF REGULATED WASTE MGR 500 75.00 37,500.00 100.00 50,000.00 32 STRIPPING HA 1 7,000.00 7,000.00 15,000.00 15,000.00 33 ROADWAY EXCAVATION, ROCK CM 21 150.00 3,150.00 250.00 5,250.00 34 ROADWAY EXCAVATION, UNCLASSIFIED CM 801 30.00 24,030.00 10.00 8,010.00 35 SAWCUTTING LM 77 8.00 616.00 10.00 770.00 36 ROADWAY EXCAVATION, REGULATED WASTE CM 112 30.00 3,360.00 25.00 2,800.00 37 MILLING, 50 MM DEPTH SM 166 30.00 4,980.00 20.00 3,320.00 38 UNDERLAYER PREPARATION SM 295 10.00 2,950.00 12.00 3,540.00 39 EARTH EXCAVATION FOR TEST PITS CM 50 50.00 2,500.00 200.00 10,000.00 40 PIPE BEDDING, CLASS B CM 70 60.00 4,200.00 30.00 2,100.00 41 SUBBASE CM 788 40.00 31,520.00 30.00 23,640.00 42 BORROW EXCAVATION, BRIDGE FOUNDATION CM 605 10.00 6,050.00 30.00 18,150.00 43 HAYBALES U 20 20.00 400.00 10.00 200.00 44 SILT FENCE LM 1,000 4.00 4,000.00 4.00 4,000.00 45 INLET FILTERS U 21 50.00 1,050.00 100.00 2,100.00 46 INLET PROTECTION, HAYBALE BARRIER U 3 70.00 210.00 100.00 300.00 47 NO ITEM U 0 .00 0.00 .00 0.00 48 CONSTRUCTION DRIVEWAY MGR 80 35.00 2,800.00 100.00 8,000.00 49 NO ITEM U 0 .00 0.00 .00 0.00 50 NO ITEM U 0 .00 0.00 .00 0.00 51 DENSE GRADED AGGREGATE BASE COURSE, SM 3,471 9.00 31,239.00 6.00 20,826.00 200 MM THICK 52 HOT MIX ASPHALT BASE COURSE MIX I-2 MGR 1,683 50.00 84,150.00 55.00 92,565.00 53 HOT MIX ASPHALT SURFACE COURSE MIX I-4 MGR 426 52.00 22,152.00 120.00 51,120.00 54 TACK COAT L 1,387 1.00 1,387.00 1.00 1,387.00 55 PRIME COAT L 3,813 1.00 3,813.00 1.00 3,813.00 56 ASPHALT PRICE ADJUSTMENT LS 1 19,240.00 19,240.00 19,240.00 19,240.00 57 BRIDGE APPROACH SLABS, 450 MM THICK SM 110 160.00 17,600.00 300.00 33,000.00 58 BRIDGE APPROACH TRANSITION SLABS, SM 185 120.00 22,200.00 200.00 37,000.00 350 MM AVERAGE THICKNESS 59 SAWCUT GROOVED BRIDGE APPROACH AND SM 295 2.50 737.50 6.00 1,770.00 TRANSITION SLABS 60 CONCRETE SURFACE COURSE, 225 MM THICK SM 9 80.00 720.00 300.00 2,700.00 61 TRANSVERSE EXPANSION JOINT, TYPE A LM 10 120.00 1,200.00 1,000.00 10,000.00 62 CORE SAMPLES, HOT MIX ASPHALT U 5 100.00 500.00 300.00 1,500.00 63 NO ITEM U 0 .00 0.00 .00 0.00 64 SUBBASE OUTLET DRAIN LM 34 50.00 1,700.00 60.00 2,040.00 65 150 MM CORRUGATED STEEL UNDERDRAIN PIPE LM 17 50.00 850.00 60.00 1,020.00 66 300 MM REINFORCED CONCRETE CULVERT PIPE LM 36 100.00 3,600.00 100.00 3,600.00 67 375 MM REINFORCED CONCRETE CULVERT PIPE LM 140 105.00 14,700.00 110.00 15,400.00 68 450 MM REINFORCED CONCRETE CULVERT PIPE LM 136 110.00 14,960.00 120.00 16,320.00 69 NO ITEM U 0 .00 0.00 .00 0.00 70 300 MM REINFORCED CONCRETE CULVERT PIPE, LM 33 105.00 3,465.00 120.00 3,960.00 CLASS V 71 300 MM REINFORCED CONCRETE END SECTIONS U 1 450.00 450.00 1,000.00 1,000.00 72 375 MM REINFORCED CONCRETE END SECTIONS U 2 500.00 1,000.00 1,500.00 3,000.00 73 NO ITEM U 0 .00 0.00 .00 0.00 74 CLEANING EXISTING PIPE, 300 TO 600 MM LM 86 30.00 2,580.00 50.00 4,300.00 DIAMETER 75 NO ITEM U 0 .00 0.00 .00 0.00 76 NO ITEM U 0 .00 0.00 .00 0.00 77 NO ITEM U 0 .00 0.00 .00 0.00 78 INLETS, TYPE A U 4 1,400.00 5,600.00 1,600.00 6,400.00 79 INLETS, TYPE B U 15 1,500.00 22,500.00 1,700.00 25,500.00 80 INLETS, TYPE E U 1 2,200.00 2,200.00 1,800.00 1,800.00 81 INLETS CONVERTED TO MANHOLES U 5 1,800.00 9,000.00 1,200.00 6,000.00 82 NO ITEM U 0 .00 0.00 .00 0.00 83 RECONSTRUCTED INLETS, TYPE B, USING NEW U 4 1,300.00 5,200.00 1,200.00 4,800.00 CASTING 84 RECONSTRUCTED MANHOLES, USING EXISTING U 1 1,200.00 1,200.00 1,000.00 1,000.00 CASTING 85 NO ITEM U 0 .00 0.00 .00 0.00 86 RECONSTRUCTED MANHOLES, SANITARY SEWER, USING U 3 1,500.00 4,500.00 1,000.00 3,000.00 EXISTING CASTING 87 RESET CASTINGS U 3 200.00 600.00 300.00 900.00 88 CLEANING EXISTING DRAINAGE STRUCTURES U 6 400.00 2,400.00 200.00 1,200.00 89 INSTALLATION OF RISING STEM VALVE WITH U 2 3,000.00 6,000.00 2,000.00 4,000.00 MANHOLE 90 NO ITEM U 0 .00 0.00 .00 0.00 91 NO ITEM U 0 .00 0.00 .00 0.00 92 225 BY 400 MM CONCRETE VERTICAL CURB LM 862 35.00 30,170.00 40.00 34,480.00 93 CONCRETE SIDEWALK, 100 MM THICK SM 667 35.00 23,345.00 50.00 33,350.00 94 HOT MIX ASPHALT DRIVEWAY, 100 MM THICK SM 345 11.00 3,795.00 25.00 8,625.00 95 HOT MIX ASPHALT DRIVEWAY, 150 MM THICK SM 1,909 15.00 28,635.00 25.00 47,725.00 96 PUBLIC SIDEWALK CURB RAMP DELINEATION SM 18 60.00 1,080.00 60.00 1,080.00 97 NO ITEM U 0 .00 0.00 .00 0.00 98 NO ITEM U 0 .00 0.00 .00 0.00 99 MONUMENTS U 14 300.00 4,200.00 450.00 6,300.00 100 MONUMENT BOXES U 2 500.00 1,000.00 150.00 300.00 101 BEAM GUIDE RAIL LM 19 125.00 2,375.00 200.00 3,800.00 102 SLOTTED GUIDE RAIL TERMINALS U 1 2,400.00 2,400.00 3,000.00 3,000.00 103 REMOVAL OF GUIDE RAIL LM 87 11.00 957.00 20.00 1,740.00 104 EXTRUDER TERMINALS U 1 2,500.00 2,500.00 3,000.00 3,000.00 105 NO ITEM U 0 .00 0.00 .00 0.00 106 RESET FENCE LM 19 100.00 1,900.00 100.00 1,900.00 107 SNOW FENCE, PLASTIC LM 80 10.00 800.00 10.00 800.00 108 NO ITEM U 0 .00 0.00 .00 0.00 109 NO ITEM U 0 .00 0.00 .00 0.00 110 RELOCATION OF GATES U 2 500.00 1,000.00 500.00 1,000.00 111 RIPRAP STONE CHANNEL PROTECTION, 450 MM THICK SM 9 50.00 450.00 150.00 1,350.00 (D50=225 MM) 112 TRAFFIC DIRECTORS, FLAGGERS HRS 240 40.00 9,600.00 50.00 12,000.00 113 NO ITEM U 0 .00 0.00 .00 0.00 114 BREAKAWAY BARRICADES U 42 100.00 4,200.00 100.00 4,200.00 115 PRECAST CONCRETE CURB, CONSTRUCTION BARRIER, LM 496 40.00 19,840.00 60.00 29,760.00 TYPE 4 116 DRUMS U 40 60.00 2,400.00 100.00 4,000.00 117 CONSTRUCTION SIGNS SM 112 110.00 12,320.00 125.00 14,000.00 118 TRAFFIC CONES U 30 15.00 450.00 50.00 1,500.00 119 VARIABLE MESSAGE SIGNS U 1 15,000.00 15,000.00 10,000.00 10,000.00 120 TEMPORARY CRASH CUSHIONS, INERTIAL BARRIER U 4 3,000.00 12,000.00 3,500.00 14,000.00 SYSTEM, 9 MODULES 121 TRAFFIC STRIPES LM 3,150 1.00 3,150.00 1.00 3,150.00 122 TRAFFIC STRIPES, LONG LIFE, EPOXY RESIN LM 2,200 1.25 2,750.00 1.25 2,750.00 123 REMOVAL OF TRAFFIC STRIPES AND MARKINGS LM 3,150 1.00 3,150.00 1.00 3,150.00 124 SIGNS SM 4 400.00 1,600.00 400.00 1,600.00 125 FIRE HYDRANT ASSEMBLIES U 1 1,500.00 1,500.00 2,000.00 2,000.00 126 300 MM GATE VALVES AND BOXES U 2 350.00 700.00 1,500.00 3,000.00 127 INSTALLATION OF HYDRANTS U 3 1,300.00 3,900.00 1,000.00 3,000.00 128 INSTALLATION OF WATER VALVES U 4 200.00 800.00 500.00 2,000.00 129 INSTALLATION OF 300MM DUCTILE IROM WATER LM 258 60.00 15,480.00 100.00 25,800.00 MAIN 130 INSTALLATION OF 400MM STEEL SLEEVE LM 52 320.00 16,640.00 300.00 15,600.00 131 RESET WATER VALVE BOXES U 4 100.00 400.00 200.00 800.00 132 RELOCATION OF GENERATOR U 1 20,000.00 20,000.00 15,000.00 15,000.00 133 78 MM RIGID METALLIC CONDUIT, TYPE CUG LM 266 65.00 17,290.00 80.00 21,280.00 134 MULTIPLE LIGHTING WIRE, NO. 2 AWG LM 888 6.00 5,328.00 2.10 1,864.80 135 53 MM RIGID METALLIC CONDUIT, TYPE CUG LM 10 65.00 650.00 60.00 600.00 136 FOUNDATIONS, TYPE MCF U 1 900.00 900.00 7,200.00 7,200.00 137 NO ITEM U 0 .00 0.00 .00 0.00 138 FOUNDATIONS, TYPE SFK U 4 1,400.00 5,600.00 3,500.00 14,000.00 139 450 BY 900 MM JUNCTION BOXES U 5 1,300.00 6,500.00 1,800.00 9,000.00 140 DECORATIVE LIGHTING ASSEMBLIES U 10 3,200.00 32,000.00 4,500.00 45,000.00 141 METER CABINETS, TYPE L U 1 2,000.00 2,000.00 3,000.00 3,000.00 142 SEWER METER CABINET U 1 30,000.00 30,000.00 35,000.00 35,000.00 143 NO ITEM U 0 .00 0.00 .00 0.00 144 NO ITEM U 0 .00 0.00 .00 0.00 145 TREE REMOVAL, OVER 500 TO 600 MM DIAMETER U 1 1,500.00 1,500.00 2,000.00 2,000.00 146 NO ITEM U 0 .00 0.00 .00 0.00 147 TOPSOILING, 100 MM THICK SM 1,953 1.50 2,929.50 5.00 9,765.00 148 FERTILIZING AND SEEDING, TYPE A-3 SM 1,953 .50 976.50 1.00 1,953.00 149 FERTILIZING AND SEEDING, TYPE F SM 180 .50 90.00 .50 90.00 150 WILDFLOWER SEEDING SM 50 4.00 200.00 5.00 250.00 151 STRAW MULCHING SM 2,133 .40 853.20 1.00 2,133.00 152 TOPSOIL STABILIZATION MATTING SM 100 3.50 350.00 4.00 400.00 153 MOWING SM 3,804 .15 570.60 .50 1,902.00 154 NO ITEM U 0 .00 0.00 .00 0.00 155 NO ITEM U 0 .00 0.00 .00 0.00 156 FRAXINUS PENNSYLVANICA 'PATMORE', B&B, U 11 210.00 2,310.00 220.00 2,420.00 50 TO 60 MM CALIPER, 3.6 TO 4.2 M HIGH 157 HEDERA HELIX "BALTICA", 55 MM POT U 130 3.00 390.00 3.00 390.00 158 JUNIPERUS CHINENSIS SARGENTII, CANS, U 140 20.00 2,800.00 20.00 2,800.00 0.4 TO 0.5 M SPREAD 159 LIQUIDAMBAR STYRACIFLUA, B&B, 50 TO 60 MM U 16 210.00 3,360.00 220.00 3,520.00 CALIPER, 3.0 TO 3.6 M HIGH 160 PARTHENOCISSUS QUINQUEFOLIA, 100 MM POT U 120 7.00 840.00 7.00 840.00 161 PINUS STROBUS, B&B, 2.0 TO 2.5 M HIGH U 17 140.00 2,380.00 150.00 2,550.00 162 PINUS STROBUS, B&B, 3.0 TO 3.6 M HIGH U 44 220.00 9,680.00 250.00 11,000.00 163 QUERCUS RUBRA, B&B, 80 TO 90 MM CALIPER, U 10 270.00 2,700.00 300.00 3,000.00 4.2 TO 4.8 M HIGH 164 NO ITEM U 0 .00 0.00 .00 0.00 165 WOOD MULCHING SM 218 3.50 763.00 4.00 872.00 166 TOPSOIL CM 134 20.00 2,680.00 30.00 4,020.00 167 WATERING CM 250 20.00 5,000.00 40.00 10,000.00 168 NONVEGETATIVE SURFACE, HOT MIX ASPHALT SM 69 50.00 3,450.00 30.00 2,070.00 169 SEGMENTAL LANDSCAPE WALL LS 1 12,000.00 12,000.00 2,000.00 2,000.00 170 PILLAR RELOCATION LS 1 3,000.00 3,000.00 2,000.00 2,000.00 171 NO ITEM U 0 .00 0.00 .00 0.00 172 NO ITEM U 0 .00 0.00 .00 0.00 173 NO ITEM U 0 .00 0.00 .00 0.00 174 NO ITEM U 0 .00 0.00 .00 0.00 175 NO ITEM U 0 .00 0.00 .00 0.00 176 NO ITEM U 0 .00 0.00 .00 0.00 177 NO ITEM U 0 .00 0.00 .00 0.00 178 NO ITEM U 0 .00 0.00 .00 0.00 179 NO ITEM U 0 .00 0.00 .00 0.00 FANNY ROAD BRIDGE 180 TEMPORARY SHIELDING LS 1 20,000.00 20,000.00 90,000.00 90,000.00 181 CLEARING SITE, BRIDGE LS 1 178,000.00 178,000.00 250,000.00 250,000.00 182 FOUNDATION EXCAVATION CM 994 15.00 14,910.00 25.00 24,850.00 183 POROUS FILL CM 160 50.00 8,000.00 50.00 8,000.00 184 BRIDGE EXCAVATION CM 1,399 20.00 27,980.00 25.00 34,975.00 185 NO ITEM U 0 .00 0.00 .00 0.00 186 CONCRETE IN SUBSTRUCTURES, PIER SHAFTS CM 180 350.00 63,000.00 700.00 126,000.00 187 CONCRETE IN STRUCTURES, FOOTINGS CM 366 350.00 128,100.00 700.00 256,200.00 188 CONCRETE IN SUPERSTRUCTURE, SIDEWALKS CM 43 520.00 22,360.00 700.00 30,100.00 189 CONCRETE IN STRUCTURES, RETAINING WALLS CM 54 1,400.00 75,600.00 900.00 48,600.00 190 CONCRETE IN SUBSTRUCTURES, ABUTMENT WALLS CM 137 750.00 102,750.00 700.00 95,900.00 191 CONCRETE IN SUBSTRUCTURES, PIER COLUMNS AND CM 79 1,200.00 94,800.00 900.00 71,100.00 CAPS 192 CONCRETE IN SUPERSTRUCTURE, DECK SLABS WITH CM 86 800.00 68,800.00 700.00 60,200.00 CORROSION INHIBITOR ADMIXTURE 193 REINFORCEMENT STEEL IN STRUCTURES KG 62,323 1.70 105,949.10 2.00 124,646.00 194 REINFORCEMENT STEEL IN STRUCTURES, EPOXY KG 33,945 1.80 61,101.00 2.10 71,284.50 COATED 195 EPOXY WATERPROOFING SEAL COAT SM 72 50.00 3,600.00 15.00 1,080.00 196 NO ITEM U 0 .00 0.00 .00 0.00 197 SAWCUT GROOVED DECK SURFACE SM 465 2.50 1,162.50 4.00 1,860.00 198 NO ITEM U 0 .00 0.00 .00 0.00 199 STRUCTURAL STEEL DECK JOINTS LS 1 25,000.00 25,000.00 28,000.00 28,000.00 200 NO ITEM U 0 .00 0.00 .00 0.00 201 TEMPORARY SHEETING SM 822 200.00 164,400.00 100.00 82,200.00 202 SHEETING LEFT IN PLACE SM 193 230.00 44,390.00 200.00 38,600.00 203 NO ITEM U 0 .00 0.00 .00 0.00 204 CONCRETE IN SUPERSTRUCTURE, PARAPETS, LM 48 1,400.00 67,200.00 1,200.00 57,600.00 SPECIAL. 2.0 M HIGH 205 CONCRETE IN SUPERSTRUCTURES, PARAPERS, LM 77 650.00 50,050.00 1,000.00 77,000.00 SPECIAL, 815MM HIGH 206 NO ITEM U 0 .00 0.00 .00 0.00 207 65 BY 65 MM PREFORMED ELASTOMERIC LM 28 65.00 1,820.00 150.00 4,200.00 JOINT SEALER 208 PRESTRESSED CONCRETE BOX BEAMS LM 53 550.00 29,150.00 700.00 37,100.00 (TYPE BI-900), 900 BY 675 MM 209 PRESTRESSED CONCRETE BOX BEAMS LM 48 520.00 24,960.00 700.00 33,600.00 (TYPE BII-900), 900 BY 825 MM 210 PRESTRESSED CONCRETE BOX BEAMS LM 454 900.00 408,600.00 700.00 317,800.00 (TYPE BI-1 200), 1 200 BY 675 MM 211 NO ITEM U 0 .00 0.00 .00 0.00 212 200 MM CORRUGATED STEEL UNDERDRAIN PIPE LM 51 60.00 3,060.00 60.00 3,060.00 213 CONCRETE SLOPE PROTECTION, REINFORCED, SM 281 50.00 14,050.00 150.00 42,150.00 100 MM THICK 214 RETAINING WALL, LOCATION NUMBER 1 SM 152 700.00 106,400.00 700.00 106,400.00 215 RETAINING WALL, LOCATION NUMBER 2 SM 157 700.00 109,900.00 700.00 109,900.00 216 RETAINING WALL, LOCATION NUMBER 3 SM 200 700.00 140,000.00 700.00 140,000.00 217 RETAINING WALL, LOCATION NUMBER 4 SM 190 700.00 133,000.00 700.00 133,000.00 SUMMARY OF AMOUNTS ROAD ITEMS $ 1,399,257.30 $ 1,465,921.80 BRIDGE ITEMS $ 2,298,092.60 $ 2,505,405.50 SUB-TOTAL AMOUNTS FOR BRIDGE WORK FANNY ROAD BRIDGE $ 2,298,092.60 $ 2,505,405.50 AGREE AGREE (HEADER) LOW BID =$ 3,697,349.90 (HEADER) 2ND LOW BID =$ 3,971,327.30 COMPUTED LOW BID =$ 3,697,349.90 COMPUTED 2ND LOW BID =$ 3,971,327.30 COMPUTED LOW BID =$ 3,697,349.90 COMPUTED 2ND LOW BID =$ 3,971,327.30