CPSBIDFM-1 DEPARTMENT OF TRANSPORTATION PAGE 1 CONSTRUCTION SERVICES/PROCUREMENT DIVISION TRENTON, NEW JERSEY TABULATION OF BIDS AND UNIT PRICES CENTRAL REGION BRIDGE SCOUR, CONT. NO. 1, RTES 1,22,31 & 34, CONT. NO. 06001100, TWPS OF LAWRENCE, BRIDGEWATER BORO. OF GLEN GARDNER, TWPS OF BETHLEHEM & LEBANON, TWP OF COLTS NECK, COUNTIES OF MERCER, SOMERSET, HUNTERDON, MONMOUTH. FEDERAL PROJECT NO. BRF-A00S(787) D.P. NO. 02125 BIDS RECEIVED SEPTEMBER 17, 2002 CONTRACT AWARD DATE OCTOBER 04, 2002 BIDDERS TOTAL PRICE BID 1 . IEW CONSTR GP $ 753,187.80 PO#8008 TRENTON NJ08650 2 . SPARWICK CONTR INC $ 792,276.00 18 ROUTE 94 LAFAYETTE NJ07848 3 . RENCOR INC $ 885,511.00 24 TANNERY ROAD SUITE 1B SOMERVILLE NJ08870 4 . H & G CONTR INC $ 917,724.49 501 DARBY COURT RIDGEWOOD NJ07450 ITEM DESCRIPTION UNIT CONTRACT LOW BIDDER 2ND LOW BIDDER NO. QUANTITY UNIT PRICE DOLLAR AMT. UNIT PRICE DOLLAR AMT. 1 PERFORMANCE BOND AND PAYMENT BOND LS 1 6,000.00 6,000.00 6,500.00 6,500.00 2 FINAL CLEANUP LS 1 1.00 1.00 15,000.00 15,000.00 3 NO ITEM U 0 .00 0.00 .00 0.00 4 CONSTRUCTION LAYOUT LS 1 6,000.00 6,000.00 5,500.00 5,500.00 5 FIELD OFFICE TYPE A SET-UP U 1 17,000.00 17,000.00 10,000.00 10,000.00 6 FIELD OFFICE TYPE A MAINTENANCE MO 12 1,400.00 16,800.00 600.00 7,200.00 7 TELEPHONE SERVICE LS 1 3,600.00 3,600.00 3,600.00 3,600.00 8 NO ITEM U 0 .00 0.00 .00 0.00 9 NO ITEM U 0 .00 0.00 .00 0.00 10 NO ITEM U 0 .00 0.00 .00 0.00 11 OWNER'S AND CONTRACTOR'S PROTECTIVE LS 1 6,000.00 6,000.00 750.00 750.00 LIABILITY INSURANCE 12 NO ITEM U 0 .00 0.00 .00 0.00 13 TRAFFIC CONTROL TRUCKS WITH MOUNTED U 1 1.00 1.00 3,500.00 3,500.00 CRASH CUSHIONS 14 MOBILIZATION LS 1 74,000.00 74,000.00 95,000.00 95,000.00 15 TURBIDITY DAM U 4 2,500.00 10,000.00 1,000.00 4,000.00 16 DRUMS U 20 65.00 1,300.00 40.00 800.00 17 BREAKAWAY BARRICADES U 20 1.00 20.00 40.00 800.00 18 CONSTRUCTION SIGNS SM 12 270.00 3,240.00 119.00 1,428.00 19 CONSTRUCTION IDENTIFICATION SIGNS, U 4 730.00 2,920.00 650.00 2,600.00 1 200 BY 2 400 MM 20 GABIONS, SCOUR PROTECTION CM 175 677.00 118,475.00 350.00 61,250.00 21 CLEARING SITE, RT. 1 OVER LS 1 40,275.00 40,275.00 5,000.00 5,000.00 SHIPETAUKEN CREEK 22 EXTRUDER TERMINALS U 1 3,500.00 3,500.00 5,000.00 5,000.00 23 COFFERDAMS LS 1 21,000.00 21,000.00 85,000.00 85,000.00 24 SILT FENCE LM 170 8.00 1,360.00 6.00 1,020.00 25 FLOATING TURBIDITY BARRIER LM 110 1.00 110.00 40.00 4,400.00 26 HAYBALES U 40 13.00 520.00 5.00 200.00 27 DEWATERING BASINS U 1 1.00 1.00 700.00 700.00 28 CONSTRUCTION DRIVEWAY, WOOD MATS SM 190 31.00 5,890.00 65.00 12,350.00 29 LABORATORY TESTING FOR PRESENCE OF HIGH ACID U 3 500.00 1,500.00 150.00 450.00 PRODUCING SOIL 30 TOPSOILING, 100 MM THICK SM 44 17.00 748.00 6.00 264.00 31 SNOW FENCE, PLASTIC LM 170 11.00 1,870.00 6.00 1,020.00 32 PREPARATION OF EXISTING SOIL SM 220 2.00 440.00 2.00 440.00 33 FERTILIZING AND SEEDING, TYPE F SM 22 1.00 22.00 1.00 22.00 34 FERTILIZING AND SEEDING, TYPE A-3 SM 150 1.00 150.00 1.00 150.00 35 WETLAND SEEDING SM 70 2.00 140.00 3.00 210.00 36 TOPSOIL STABILIZATION MATTING SM 220 5.00 1,100.00 7.00 1,540.00 37 STRAW MULCHING SM 242 1.00 242.00 1.00 242.00 38 HIGH ACID PRODUCING SOIL REMEDIATION CM 40 75.00 3,000.00 25.00 1,000.00 39 FRAXINUS PENNSYLVANICA, B&B, 50 TO 60 MM U 4 254.00 1,016.00 226.00 904.00 CALIPER, 3.6 TO 4.2 M HIGH 40 VIBURNUM DENTATUM, BR, 0.6 TO 0.9 M HIGH U 7 35.00 245.00 31.00 217.00 41 CORNUS STOLONIFERA, BR, 0.5 TO 0.6 M HIGH U 7 25.00 175.00 22.00 154.00 42 PLATANUS OCCIDENTAILS, B&B, 50 TO 60 MM U 3 232.00 696.00 206.00 618.00 CALIPER, 3.6 TO 4.2 HIGH 43 ASCLEPIAS TUBEROSA, #1 CAN U 70 14.00 980.00 13.00 910.00 44 RUDBECKIA LACINIATA, #1 CAN U 70 16.00 1,120.00 14.00 980.00 45 EUPATORIUM PURPUREUM, #1 CAN U 70 16.00 1,120.00 14.00 980.00 46 NO ITEM U 0 .00 0.00 .00 0.00 47 NO ITEM U 0 .00 0.00 .00 0.00 48 GABIONS, SCOUR PROTECTION CM 78 725.00 56,550.00 500.00 39,000.00 49 CLEARING SITE, RT. 22 OVER LS 1 10,000.00 10,000.00 10,000.00 10,000.00 PETERS BROOK 50 NO ITEM U 0 .00 0.00 .00 0.00 51 COFFERDAMS LS 1 54,000.00 54,000.00 85,000.00 85,000.00 52 SILT FENCE LM 90 8.00 720.00 6.00 540.00 53 FLOATING TURBIDITY BARRIER LM 80 .01 .80 45.00 3,600.00 54 HAYBALES U 40 13.00 520.00 5.00 200.00 55 DEWATERING BASINS U 1 1.00 1.00 750.00 750.00 56 CONSTRUCTION DRIVEWAY, WOOD MATS SM 260 34.00 8,840.00 65.00 16,900.00 57 NO ITEM U 0 .00 0.00 .00 0.00 58 TOPSOILING, 100 MM THICK SM 66 17.00 1,122.00 6.00 396.00 59 SNOW FENCE, PLASTIC LM 90 10.00 900.00 6.00 540.00 60 PREPARATION OF EXISTING SOIL SM 330 2.00 660.00 3.00 990.00 61 FERTILIZING AND SEEDING, TYPE F SM 33 1.00 33.00 1.00 33.00 62 FERTILIZING AND SEEDING, TYPE A-3 SM 330 1.00 330.00 1.00 330.00 63 TOPSOIL STABILIZATION MATTING SM 330 5.00 1,650.00 8.00 2,640.00 64 STRAW MULCHING SM 363 1.00 363.00 1.00 363.00 65 NO ITEM U 0 .00 0.00 .00 0.00 66 FRAXINUS PENNSYLVANICA, B&B, 50 TO 60 MM U 8 254.00 2,032.00 226.00 1,808.00 CALIPER, 3.6 TO 4.2 M HIGH 67 VIBURNUM DENTATUM, BR, 0.6 TO 0.9 M HIGH U 14 35.00 490.00 31.00 434.00 68 PLATANUS OCCIDENTALIS, B&B, 50 TO 60 MM U 6 232.00 1,392.00 206.00 1,236.00 CALIPER, 3.6 TO 4.2 M HIGH 69 RUDBECKIA LACINIATA, #1 CAN U 110 16.00 1,760.00 14.00 1,540.00 70 EUPATORIUM PURPUREUM, #1 CAN U 110 16.00 1,760.00 14.00 1,540.00 71 PHLOX MACULATA, #1 CAN U 110 15.00 1,650.00 14.00 1,540.00 72 NO ITEM U 0 .00 0.00 .00 0.00 73 NO ITEM U 0 .00 0.00 .00 0.00 74 GABIONS, SCOUR PROTECTION CM 84 840.00 70,560.00 400.00 33,600.00 75 CLEARING SITE, RT. 31 OVER SPRUCE RUN LS 1 35,000.00 35,000.00 9,500.00 9,500.00 76 NO ITEM U 0 .00 0.00 .00 0.00 77 COFFERDAMS LS 1 15,000.00 15,000.00 90,000.00 90,000.00 78 SILT FENCE LM 25 8.00 200.00 6.00 150.00 79 FLOATING TURBIDITY BARRIER LM 90 1.00 90.00 35.00 3,150.00 80 HAYBALES U 40 13.00 520.00 5.00 200.00 81 DEWATERING BASINS U 1 1.00 1.00 750.00 750.00 82 CONSTRUCTION DRIVEWAY, WOOD MATS SM 40 37.00 1,480.00 65.00 2,600.00 83 NO ITEM U 0 .00 0.00 .00 0.00 84 TOPSOILING, 100 MM THICK SM 16 17.00 272.00 8.00 128.00 85 SNOW FENCE, PLASTIC LM 25 11.00 275.00 6.00 150.00 86 PREPARATION OF EXISTING SOIL SM 80 2.00 160.00 3.00 240.00 87 FERTILIZING AND SEEDING, TYPE F SM 8 1.00 8.00 2.00 16.00 88 FERTILIZING AND SEEDING, TYPE A-3 SM 80 1.00 80.00 1.00 80.00 89 TOPSOIL STABILIZATION MATTING SM 80 5.00 400.00 8.00 640.00 90 STRAW MULCHING SM 88 1.00 88.00 1.00 88.00 91 NO ITEM U 0 .00 0.00 .00 0.00 92 LINDERA BENZOIN, CANS, 0.4 TO 0.5 M HIGH U 3 35.00 105.00 31.00 93.00 93 FRAXINUS PENNSYLVANICA, B&B, 50 TO 60 MM U 2 254.00 508.00 226.00 452.00 CALIPER, 3.6 TO 4.2 M HIGH 94 ALNUS RUGOSA, BR, 0.4 TO 0.5 M HIGH U 2 25.00 50.00 22.00 44.00 95 CORNUS STOLONIFERA, BR, 0.5 TO 0.6 M HIGH U 3 25.00 75.00 22.00 66.00 96 ASCLEPIAS TUBEROSA, #1 CAN U 25 14.00 350.00 13.00 325.00 97 EUPATORIUM PURPUREUM, #1 CAN U 25 16.00 400.00 14.00 350.00 98 ELYMUS RIPARIUS, 50MM PLUG U 25 3.00 75.00 3.00 75.00 99 NO ITEM U 0 .00 0.00 .00 0.00 100 NO ITEM U 0 .00 0.00 .00 0.00 101 GABIONS, SCOUR PROTECTION CM 70 764.00 53,480.00 400.00 28,000.00 102 CLEARTING SITE, RT. 34 OVER MINE BROOK LS 1 37,000.00 37,000.00 7,500.00 7,500.00 103 NO ITEM U 0 .00 0.00 .00 0.00 104 COFFERDAMS LS 1 28,000.00 28,000.00 85,000.00 85,000.00 105 SILT FENCE LM 36 8.00 288.00 6.00 216.00 106 FLOATING TURBIDITY BARRIER LM 80 1.00 80.00 35.00 2,800.00 107 HAYBALES U 40 13.00 520.00 6.00 240.00 108 DEWATERING BASINS U 1 1.00 1.00 750.00 750.00 109 CONSTRUCTION DRIVEWAY, WOOD MATS SM 90 33.00 2,970.00 65.00 5,850.00 110 LABORATORY TESTING FOR PRESENCE OF HIGH ACID U 3 500.00 1,500.00 150.00 450.00 PRODUCING SOIL 111 TOPSOILING, 100 MM THICK SM 28 17.00 476.00 9.00 252.00 112 SNOW FENCE, PLASTIC LM 36 11.00 396.00 6.00 216.00 113 PREPARATION OF EXISTING SOIL SM 140 2.00 280.00 2.00 280.00 114 FERTILIZING AND SEEDING, TYPE F SM 14 1.00 14.00 1.00 14.00 115 FERTILIZING AND SEEDING, TYPE A-3 SM 140 1.00 140.00 1.00 140.00 116 TOPSOIL STABILIZATION MATTING SM 140 5.00 700.00 5.00 700.00 117 STRAW MULCHING SM 154 1.00 154.00 1.00 154.00 118 OFF-SITE DISPOSAL OF HIGH ACID PRODUCING SOIL CM 120 1.00 120.00 25.00 3,000.00 119 FRAXINUS PENNSYLVANICA, B&B, 50 TO 60 MM U 3 254.00 762.00 26.00 78.00 CALIPER, 3.6 TO 4.2 M HIGH 120 ILEX OPACA FEMALE, B&B, 1.25 TO 1.5 M HIGH U 3 153.00 459.00 136.00 408.00 121 VIBURNUM DENTATUM, BR, 0.6 TO 0.9 M HIGH U 4 35.00 140.00 31.00 124.00 122 CORNUS STOLONIFERA, BR, 0.5 TO 0.6 M HIGH U 4 25.00 100.00 22.00 88.00 123 EUPATORIUM PURPUREUM, #1 CAN U 80 16.00 1,280.00 14.00 1,120.00 124 PHLOX MACULATA, #1 CAN U 80 16.00 1,280.00 14.00 1,120.00 125 NO ITEM U 0 .00 0.00 .00 0.00 126 NO ITEM U 0 .00 0.00 .00 0.00 SUMMARY OF AMOUNTS ROAD ITEMS $ 753,187.80 $ 792,276.00 BRIDGE ITEMS 0.00 0.00 SUB-TOTAL AMOUNTS FOR BRIDGE WORK AGREE AGREE (HEADER) LOW BID =$ 753,187.80 (HEADER) 2ND LOW BID =$ 792,276.00 COMPUTED LOW BID =$ 753,187.80 COMPUTED 2ND LOW BID =$ 792,276.00 COMPUTED LOW BID =$ 753,187.80 COMPUTED 2ND LOW BID =$ 792,276.00