CPSBIDFM-1 DEPARTMENT OF TRANSPORTATION PAGE 1 CONSTRUCTION SERVICES/PROCUREMENT DIVISION TRENTON, NEW JERSEY TABULATION OF BIDS AND UNIT PRICES RT. US 9W SEC. 2D & 3D INTERSECTION IMPROVEMENTS ON RT.US 9W AT MONTAMMY DR, ESPLANADE, HILLSIDE AVE. TO CLOSTER DOCK RD ALPINE BOY SCOUT CAMP,PALISADES PKWY. INTERCHANGE 4S/4N TO THE LAMONT GEOLOGICAL OBSERVATORY . CONTRACT NO.005970246 BOROS OF TENAFLY & ALPINE NJ,BERGEN .ORANGETOWN,NY.ROCKLAND D.P. NO. 03133 BIDS RECEIVED JANUARY 06, 2004 CONTRACT AWARD DATE FEBRUARY 19, 2004 BIDDERS TOTAL PRICE BID 1 . INTERCOUNTY PAVING ASSOC LLC $ 4,811,988.00 859 WILLOW GROVE STREET HACKETTSTOWN NJ07840 2 . GARDNER M BISHOP INC J/V JOSEPH M SANZARI INC $ 6,157,631.80 399 KNOLLWOOD RD WHITE PLAINS NY10603 3 . TILCON OF NEW YORK INC $ 6,368,888.65 625 MT HOPE ROAD WHARTON NJ07885 4 . CRISDEL GP INC $ 6,410,376.20 240 RYAN ST SO PLAINFIELD NJ07080 5 . NEW PRINCE CONCRETE CONSTRUCTION CO $ 7,684,772.65 215 ELLEN TERRACE HACKENSACK NJ07601 ITEM DESCRIPTION UNIT CONTRACT LOW BIDDER 2ND LOW BIDDER NO. QUANTITY UNIT PRICE DOLLAR AMT. UNIT PRICE DOLLAR AMT. 1 PERFORMANCE BOND AND PAYMENT BOND LS 1 38,600.00 38,600.00 26,000.00 26,000.00 2 FINAL CLEANUP LS 1 18,400.00 18,400.00 1.00 1.00 3 NO ITEM U 0 .00 0.00 .00 0.00 4 CONSTRUCTION LAYOUT LS 1 62,000.00 62,000.00 112,000.00 112,000.00 5 FIELD OFFICE TYPE B SET-UP U 1 19,500.00 19,500.00 25,000.00 25,000.00 6 FIELD OFFICE TYPE B MAINTENANCE MO 18 2,000.00 36,000.00 1,500.00 27,000.00 7 TELEPHONE SERVICE LS 1 4,500.00 4,500.00 4,500.00 4,500.00 8 MATERIALS FIELD LABORATORY SET-UP U 1 16,500.00 16,500.00 20,000.00 20,000.00 9 MATERIALS FIELD LABORATORY MAINTENANCE MO 16 1,925.00 30,800.00 1,000.00 16,000.00 10 FUEL PRICE ADJUSTMENT LS 1 8,700.00 8,700.00 8,700.00 8,700.00 11 NO ITEM U 0 .00 0.00 .00 0.00 12 TRAINING REIMBURSEMENT LS 1 27,000.00 27,000.00 27,000.00 27,000.00 13 OWNER'S AND CONTRACTOR'S PROTECTIVE LS 1 9,625.00 9,625.00 10,000.00 10,000.00 LIABILITY INSURANCE 14 PROGRESS SCHEDULE LS 1 30,000.00 30,000.00 7,200.00 7,200.00 15 MOBILIZATION LS 1 379,742.11 379,742.11 450,000.00 450,000.00 16 NO ITEM U 0 .00 0.00 .00 0.00 17 NO ITEM U 0 .00 0.00 .00 0.00 18 CLEARING SITE LS 1 83,000.00 83,000.00 82,500.00 82,500.00 19 NO ITEM U 0 .00 0.00 .00 0.00 20 NO ITEM U 0 .00 0.00 .00 0.00 21 NO ITEM U 0 .00 0.00 .00 0.00 22 NO ITEM U 0 .00 0.00 .00 0.00 23 NO ITEM U 0 .00 0.00 .00 0.00 24 ROADWAY EXCAVATION, UNCLASSIFIED CM 14,081 16.00 225,296.00 50.00 704,050.00 25 NO ITEM U 0 .00 0.00 .00 0.00 26 REMOVAL OF CONCRETE BASE COURSE AND SM 1,294 35.00 45,290.00 30.00 38,820.00 CONCRETE SURFACE COURSES 27 NO ITEM U 0 .00 0.00 .00 0.00 28 SAWCUTTING LM 6,828 9.25 63,159.00 12.00 81,936.00 29 MILLING, 50 MM VARIABLE DEPTH SM 40,258 2.10 84,541.80 4.00 161,032.00 30 POROUS FILL CM 720 32.00 23,040.00 30.00 21,600.00 31 NO ITEM U 0 .00 0.00 .00 0.00 32 EARTH EXCAVATION FOR TEST PITS CM 50 55.00 2,750.00 75.00 3,750.00 33 ROCK EXCAVATION, SUBSURFACE STRUCTURES CM 21 175.00 3,675.00 400.00 8,400.00 34 SUBBASE CM 3,448 33.00 113,784.00 50.00 172,400.00 35 SILT FENCE LM 5,609 3.25 18,229.25 10.00 56,090.00 36 INLET FILTERS U 43 58.00 2,494.00 200.00 8,600.00 37 NO ITEM U 0 .00 0.00 .00 0.00 38 NO ITEM U 0 .00 0.00 .00 0.00 39 NO ITEM U 0 .00 0.00 .00 0.00 40 DENSE GRADED AGGREGATE BASE COURSE, SM 17,804 8.00 142,432.00 9.00 160,236.00 200 MM THICK 41 CONCRETE BASE COURSE, REINFORCED, SM 14 275.00 3,850.00 150.00 2,100.00 250 MM THICK 42 BITUMINOUS CONCRETE PATCH MGR 100 54.00 5,400.00 125.00 12,500.00 43 HOT MIX ASPHALT PAVEMENT REPAIR PRIOR TO SM 2,013 25.00 50,325.00 105.00 211,365.00 OVERLAY 44 TACK COAT L 15,855 .01 158.55 .10 1,585.50 45 PRIME COAT L 10,266 .01 102.66 .10 1,026.60 46 ASPHALT PRICE ADJUSTMENT LS 1 23,100.00 23,100.00 23,100.00 23,100.00 47 SAWING AND SEALING JOINTS IN HOT MIX ASPHALT LM 15,585 3.24 50,495.40 3.25 50,651.25 OVERLAY 48 CORE SAMPLES, HOT MIX ASPHALT U 10 100.00 1,000.00 300.00 3,000.00 49 NO ITEM U 0 .00 0.00 .00 0.00 50 NO ITEM U 0 .00 0.00 .00 0.00 51 SUPERPAVE HOT MIX ASPHALT 12.5H76 SURFACE MGR 6,622 47.50 314,545.00 65.00 430,430.00 COURSE 52 SUPERPAVE HOT MIX ASPHALT 19H76 INTERMEDIATE MGR 6,432 40.00 257,280.00 65.00 418,080.00 COURSE 53 SUPERPAVE HOT MIX ASPHALT 25M64 BASE COURSE MGR 5,023 39.00 195,897.00 55.00 276,265.00 54 NO ITEM U 0 .00 0.00 .00 0.00 55 NO ITEM U 0 .00 0.00 .00 0.00 56 NO ITEM U 0 .00 0.00 .00 0.00 57 NO ITEM U 0 .00 0.00 .00 0.00 58 SUBBASE OUTLET DRAIN LM 45 125.00 5,625.00 55.00 2,475.00 59 150 MM CORRUGATED STEEL UNDERDRAIN PIPE LM 13 150.00 1,950.00 70.00 910.00 60 600 MM CORRUGATED STEEL CULVERT PIPE LM 3 275.00 825.00 330.00 990.00 61 375 MM REINFORCED CONCRETE CULVERT PIPE LM 111 175.00 19,425.00 175.00 19,425.00 62 450 MM REINFORCED CONCRETE CULVERT PIPE LM 47 200.00 9,400.00 230.00 10,810.00 63 600 MM REINFORCED CONCRETE CULVERT PIPE LM 2 275.00 550.00 320.00 640.00 64 750 MM REINFORCED CONCRETE CULVERT PIPE LM 44 255.00 11,220.00 280.00 12,320.00 65 CLEANING EXISTING PIPE, 300 TO 600 MM LM 619 10.75 6,654.25 18.00 11,142.00 DIAMETER 66 CLEANING EXISTING PIPE, OVER 600 TO LM 65 10.75 698.75 20.00 1,300.00 1 200 MM DIAMETER 67 STORMWATER TREATMENT SYSTEM 1 U 1 35,520.00 35,520.00 40,000.00 40,000.00 68 STORMWATER TREATMENT SYSTEM 2 U 1 22,780.00 22,780.00 35,000.00 35,000.00 69 INLETS, TYPE B U 11 1,725.00 18,975.00 3,000.00 33,000.00 70 INLETS, TYPE E U 3 1,760.00 5,280.00 3,100.00 9,300.00 71 MANHOLES U 4 1,625.00 6,500.00 2,800.00 11,200.00 72 RECONSTRUCTED MANHOLES, USING NEW CASTING U 3 1,035.00 3,105.00 1,300.00 3,900.00 73 INLET CASTINGS, TYPE E U 3 1,180.00 3,540.00 1,000.00 3,000.00 74 NEW MANHOLE CASTINGS, SQUARE FRAME, CIRCULAR U 5 1,475.00 7,375.00 1,200.00 6,000.00 COVER 75 RESET CASTINGS U 21 325.00 6,825.00 600.00 12,600.00 76 NO ITEM U 0 .00 0.00 .00 0.00 77 NO ITEM U 0 .00 0.00 .00 0.00 78 NO ITEM U 0 .00 0.00 .00 0.00 79 375 BY 1 040 MM CONCRETE BARRIER CURB LM 76 425.00 32,300.00 210.00 15,960.00 80 300 BY 325 MM CONCRETE SLOPING CURB LM 42 52.00 2,184.00 50.00 2,100.00 81 225 BY 400 MM CONCRETE VERTICAL CURB LM 3,029 49.00 148,421.00 40.00 121,160.00 82 RESET GRANITE CURB LM 10 82.00 820.00 60.00 600.00 83 RESET COBBLE STONE DRIVEWAY SM 16 107.00 1,712.00 60.00 960.00 84 CONCRETE SIDEWALK, 100 MM THICK SM 449 51.00 22,899.00 41.00 18,409.00 85 NO ITEM U 0 .00 0.00 .00 0.00 86 HOT MIX ASPHALT DRIVEWAY, 100 MM THICK SM 19 150.00 2,850.00 200.00 3,800.00 87 NO ITEM U 0 .00 0.00 .00 0.00 88 NO ITEM U 0 .00 0.00 .00 0.00 89 NO ITEM U 0 .00 0.00 .00 0.00 90 NO ITEM U 0 .00 0.00 .00 0.00 91 NO ITEM U 0 .00 0.00 .00 0.00 92 CONCRETE CULVERTS CM 2 550.00 1,100.00 2,000.00 4,000.00 93 CONCRETE HEADWALLS CM 4 1,925.00 7,700.00 1,500.00 6,000.00 94 NO ITEM U 0 .00 0.00 .00 0.00 95 MONUMENTS U 2 1,360.00 2,720.00 300.00 600.00 96 RESET MONUMENTS U 3 720.00 2,160.00 300.00 900.00 97 BEAM GUIDE RAIL LM 3,596 36.00 129,456.00 35.00 125,860.00 98 SLOTTED GUIDE RAIL TERMINALS U 5 1,800.00 9,000.00 1,700.00 8,500.00 99 EXTRUDER TERMINALS U 13 2,700.00 35,100.00 2,600.00 33,800.00 100 BEAM GUIDE RAIL ANCHORAGES U 18 540.00 9,720.00 500.00 9,000.00 101 RUB RAIL LM 1,126 20.25 22,801.50 20.00 22,520.00 102 REMOVAL OF GUIDE RAIL LM 2,691 4.25 11,436.75 10.00 26,910.00 103 MISCELLANEOUS CONCRETE CM 1 260.00 260.00 500.00 500.00 104 NO ITEM U 0 .00 0.00 .00 0.00 105 RESET FENCE LM 52 65.00 3,380.00 100.00 5,200.00 106 NO ITEM U 0 .00 0.00 .00 0.00 107 SNOW FENCE, PLASTIC LM 5,303 8.50 45,075.50 9.00 47,727.00 108 RIPRAP STONE CHANNEL PROTECTION, 300 MM THICK SM 19 100.00 1,900.00 60.00 1,140.00 (D50=150 MM) 109 NO ITEM U 0 .00 0.00 .00 0.00 110 BREAKAWAY BARRICADES U 57 100.00 5,700.00 125.00 7,125.00 111 DRUMS U 473 100.00 47,300.00 60.00 28,380.00 112 TRAFFIC CONES U 473 25.00 11,825.00 15.00 7,095.00 113 NO ITEM U 0 .00 0.00 .00 0.00 114 VARIABLE MESSAGE SIGNS U 3 16,500.00 49,500.00 15,000.00 45,000.00 115 CONSTRUCTION SIGNS SM 139 140.00 19,460.00 250.00 34,750.00 116 TRAFFIC CONTROL TRUCKS WITH MOUNTED U 5 27,500.00 137,500.00 5,000.00 25,000.00 CRASH CUSHIONS 117 REMOVABLE WET WEATHER PAVEMENT MARKING TAPE LM 26,387 5.00 131,935.00 5.00 131,935.00 118 TRAFFIC DIRECTORS, FLAGGERS HRS 3,000 62.00 186,000.00 45.00 135,000.00 119 TRAFFIC STRIPES, LONG LIFE, EPOXY RESIN LM 21,372 1.20 25,646.40 1.25 26,715.00 120 TRAFFIC MARKINGS, LINES, LONG LIFE, LM 14,572 1.30 18,943.60 1.35 19,672.20 THERMOPLASTIC 121 TRAFFIC MARKINGS, SYMBOLS, LONG LIFE, SM 171 52.00 8,892.00 50.00 8,550.00 THERMOPLASTIC 122 REMOVAL OF TRAFFIC STRIPES AND MARKINGS LM 26,387 1.00 26,387.00 1.00 26,387.00 123 REMOVAL OF PAVEMENT REFLECTORS AND CASTINGS U 70 3.50 245.00 20.00 1,400.00 124 TWO-WAY PLOWABLE MONO-DIRECTIONAL U 64 31.00 1,984.00 30.00 1,920.00 WHITE PAVEMENT REFLECTORS AND CASTINGS 125 TWO-WAY PLOWABLE MONO-DIRECTIONAL U 354 31.00 10,974.00 30.00 10,620.00 AMBER PAVEMENT REFLECTORS AND CASTINGS 126 TWO-WAY PLOWABLE BI-DIRECTIONAL U 59 31.00 1,829.00 30.00 1,770.00 AMBER PAVEMENT REFLECTORS AND CASTINGS 127 SIGNS SM 33 325.00 10,725.00 300.00 9,900.00 128 OVERHEAD STREET NAME SIGNS, TYPE DF SM 6 525.00 3,150.00 500.00 3,000.00 129 RESET WATER VALVE BOXES U 24 35.00 840.00 400.00 9,600.00 130 RESET GAS VALVE BOXES U 1 160.00 160.00 400.00 400.00 131 NO ITEM U 0 .00 0.00 .00 0.00 132 NO ITEM U 0 .00 0.00 .00 0.00 133 GAS, ROADWAY EXCAVATION, UNCLASSIFIED CM 26 240.00 6,240.00 250.00 6,500.00 134 200 MM PLASTIC GAS MAIN LM 229 86.00 19,694.00 90.00 20,610.00 135 200 MM PIPE LINE STOP AND TIE-IN ASSISTANCE CHR 18 320.00 5,760.00 330.00 5,940.00 136 200 MM FABRICATE TIE-IN PIECE U 2 625.00 1,250.00 660.00 1,320.00 137 GAS, EXCAVATION FOR TEST PITS CM 2 165.00 330.00 175.00 350.00 138 GAS, PIPE BEDDING CM 117 40.00 4,680.00 42.00 4,914.00 139 GAS, BROKEN STONE OR WASHED GRAVEL CM 2 40.00 80.00 42.00 84.00 140 GAS, COARSE AGGREGATE, SIZE NO. 57 CM 3 40.00 120.00 42.00 126.00 141 GAS, BACKFILL CM 7 40.00 280.00 42.00 294.00 142 NO ITEM U 0 .00 0.00 .00 0.00 143 NO ITEM U 0 .00 0.00 .00 0.00 144 NO ITEM U 0 .00 0.00 .00 0.00 145 41 MM RIGID METALLIC CONDUIT, TYPE EXPOSED LM 6 350.00 2,100.00 82.00 492.00 146 41 MM RIGID METALLIC CONDUIT, TYPE CUG LM 126 90.00 11,340.00 47.00 5,922.00 147 53 MM RIGID METALLIC CONDUIT, TYPE CUG LM 31 87.00 2,697.00 55.00 1,705.00 148 78 MM RIGID METALLIC CONDUIT, TYPE CUG LM 310 72.00 22,320.00 60.00 18,600.00 149 78 MM RIGID METALLIC CONDUIT, TYPE CUR LM 167 175.00 29,225.00 140.00 23,380.00 150 78 MM RIGID NONMETALLIC CONDUIT LM 96 42.00 4,032.00 40.00 3,840.00 151 GROUND WIRE, NO. 8 AWG LM 1,414 2.60 3,676.40 4.00 5,656.00 152 MULTIPLE LIGHTING WIRE, NO. 2 AWG LM 1,658 8.50 14,093.00 8.00 13,264.00 153 MULTIPLE LIGHTING WIRE, NO. 8 AWG LM 1,610 7.00 11,270.00 7.00 11,270.00 154 SERVICE WIRE, NO. 2 AWG LM 30 8.50 255.00 8.00 240.00 155 SERVICE WIRE, NO. 6 AWG LM 112 7.00 784.00 7.00 784.00 156 FOUNDATIONS, TYPE SFT U 4 1,400.00 5,600.00 1,000.00 4,000.00 157 FOUNDATIONS, TYPE MCF U 1 850.00 850.00 750.00 750.00 158 FOUNDATIONS, TYPE P-MC U 3 2,485.00 7,455.00 1,600.00 4,800.00 159 FOUNDATIONS, TYPE STF U 2 3,300.00 6,600.00 2,500.00 5,000.00 160 FOUNDATIONS, TYPE SFK U 8 1,500.00 12,000.00 1,100.00 8,800.00 161 FOUNDATIONS, TYPE 1M-MC U 1 2,450.00 2,450.00 1,600.00 1,600.00 162 JUNCTION BOX FOUNDATIONS U 1 1,600.00 1,600.00 1,300.00 1,300.00 163 430 BY 760 MM JUNCTION BOXES U 7 920.00 6,440.00 850.00 5,950.00 164 450 BY 900 MM JUNCTION BOXES U 24 1,400.00 33,600.00 1,100.00 26,400.00 165 LOOP DETECTOR LM 326 37.00 12,062.00 30.00 9,780.00 166 LOOP DETECTOR LEAD LM 1,375 6.00 8,250.00 5.00 6,875.00 167 CONTROLLER ASSEMBLIES, 8 PHASE U 3 15,000.00 45,000.00 14,100.00 42,300.00 168 FLASHER ASSEMBLY U 1 700.00 700.00 700.00 700.00 169 METER CABINETS, TYPE T U 1 1,750.00 1,750.00 1,500.00 1,500.00 170 METER CABINETS, TYPE TL U 3 235.00 705.00 2,100.00 6,300.00 171 PEDESTRIAN SIGNAL ASSEMBLIES, TYPE W-1 U 8 1,200.00 9,600.00 1,250.00 10,000.00 172 PUSH BUTTON ASSEMBLIES U 6 180.00 1,080.00 250.00 1,500.00 173 TRAFFIC SIGNAL ASSEMBLIES, TYPE 3.1MA-1 U 1 2,600.00 2,600.00 3,100.00 3,100.00 174 TRAFFIC SIGNAL ASSEMBLIES, TYPE 4.6MA-1 U 1 2,900.00 2,900.00 3,200.00 3,200.00 175 TRAFFIC SIGNAL ASSEMBLIES, TYPE 6.1MA-1 U 1 3,300.00 3,300.00 4,000.00 4,000.00 176 TRAFFIC SIGNAL ASSEMBLIES, TYPE 10.7S-2 U 1 7,000.00 7,000.00 6,100.00 6,100.00 177 TRAFFIC SIGNAL ASSEMBLIES, TYPE 7.6MK-1 U 2 4,000.00 8,000.00 4,800.00 9,600.00 178 TRAFFIC SIGNAL ASSEMBLIES, TYPE 7.6MK-2 U 5 5,200.00 26,000.00 6,000.00 30,000.00 179 TRAFFIC SIGNAL ASSEMBLIES, TYPE 7.6MK-3 U 1 5,000.00 5,000.00 6,000.00 6,000.00 180 TRAFFIC SIGNAL ASSEMBLIES, TYPE C-1 U 1 1,600.00 1,600.00 1,700.00 1,700.00 181 TRAFFIC SIGNAL ASSEMBLIES, TYPE MM-1 U 4 1,300.00 5,200.00 1,550.00 6,200.00 182 TRAFFIC SIGNAL CABLE, 2 CONDUCTOR LM 167 6.00 1,002.00 8.00 1,336.00 183 TRAFFIC SIGNAL CABLE, 5 CONDUCTOR LM 864 9.00 7,776.00 7.00 6,048.00 184 TRAFFIC SIGNAL CABLE, 10 CONDUCTOR LM 745 9.50 7,077.50 4.00 2,980.00 185 INTERIM TRAFFIC SIGNAL SYSTEM, LOCATION LS 1 4,700.00 4,700.00 7,500.00 7,500.00 NUMBER 1 186 INTERIM TRAFFIC SIGNAL SYSTEM, LOCATION LS 1 4,700.00 4,700.00 7,500.00 7,500.00 NUMBER 2 187 INTERIM TRAFFIC SIGNAL SYSTEM, LOCATION LS 1 4,700.00 4,700.00 7,500.00 7,500.00 NUMBER 3 188 TRAFFIC SIGNAL STANDARDS, TYPE C U 2 1,800.00 3,600.00 2,000.00 4,000.00 189 TRAFFIC SIGNAL STANDARDS, TYPE T U 2 1,700.00 3,400.00 1,900.00 3,800.00 190 TRAFFIC SIGNAL STANDARDS, TYPE SC U 1 4,200.00 4,200.00 4,700.00 4,700.00 191 TRAFFIC SIGNAL STANDARDS, TYPE K U 8 2,310.00 18,480.00 2,600.00 20,800.00 192 METER CABINETS, TYPE 1M-MC U 1 7,200.00 7,200.00 7,500.00 7,500.00 193 RELOCATE EXISTING RED SIGNAL AHEAD SIGN U 1 2,600.00 2,600.00 3,500.00 3,500.00 194 LIGHTING STANDARD ASSEMBLIES, TYPE L-MG-S-K-X U 3 1,800.00 5,400.00 2,200.00 6,600.00 195 LIGHTING STANDARD ASSEMBLIES, U 1 1,600.00 1,600.00 2,000.00 2,000.00 TYPE L-MG-S-SC-X 196 LIGHTING ARM ASSEMBLIES, TYPE L-MG-S-X U 2 1,400.00 2,800.00 1,800.00 3,600.00 197 RELOCATE EXISTING LSA,TYPE L-2.4-S-12.2 U 1 800.00 800.00 1,200.00 1,200.00 198 TRAFFIC CONTROLLER ASSEMBLY TURN ON U 4 1,600.00 6,400.00 1,600.00 6,400.00 199 NO ITEM U 0 .00 0.00 .00 0.00 200 NO ITEM U 0 .00 0.00 .00 0.00 201 TOPSOILING, 100 MM THICK SM 16,771 1.45 24,317.95 1.50 25,156.50 202 BORROW TOPSOIL CM 1,677 20.00 33,540.00 19.00 31,863.00 203 FERTILIZING AND SEEDING, TYPE A-3 SM 16,771 .45 7,546.95 .45 7,546.95 204 FERTILIZING AND SEEDING, TYPE F SM 1,677 .45 754.65 .45 754.65 205 STRAW MULCHING SM 18,448 .45 8,301.60 .45 8,301.60 206 WOOD MULCHING SM 705 4.25 2,996.25 4.00 2,820.00 207 WOOD MULCHING, 50 MM THICK SM 43 2.30 98.90 2.25 96.75 208 MOWING SM 38,718 .11 4,258.98 .10 3,871.80 209 ACER SACCHARUM "GREEN MOUNTAIN", B&B, U 5 280.00 1,400.00 270.00 1,350.00 60 TO 80 MM CALIPER, 4.2 TO 4.8 M HIGH 210 BETULA PAPYRIFERA, CUMP, B&B, HEAVY, U 14 250.00 3,500.00 235.00 3,290.00 2.5 TO 3.0M HIGH 211 CORNUS ALBA SIBIRICA, BR, 0.9 TO 1.25 M HIGH U 15 20.00 300.00 19.00 285.00 212 CORNUS RUTGERS HYBRIDS STELLAR PINK, B&B, U 7 165.00 1,155.00 155.00 1,085.00 1.8 TO 2.5 M HIGH 213 MALUS 'HARVEST GOLD', B&B, 40 TO 45 MM U 13 150.00 1,950.00 145.00 1,885.00 CALIPER, 1.8 TO 2.0 M HIGH 214 RHUS AROMATICA 'GRO-LOW', BR, 0.5 TO 0.6M U 878 14.00 12,292.00 13.00 11,414.00 HIGH 215 NARCISSUS, BULBS U 573 2.10 1,203.30 2.00 1,146.00 216 VIBURNUM PLICATUM TOMENTOSUM 'MARIESI', B&B, U 49 58.00 2,842.00 55.00 2,695.00 1.2 TO 1.5 M HIGH 217 WATERING CM 84 58.00 4,872.00 55.00 4,620.00 218 NO ITEM U 0 .00 0.00 .00 0.00 219 NO ITEM U 0 .00 0.00 .00 0.00 220 NO ITEM U 0 .00 0.00 .00 0.00 221 NONVEGETATIVE SURFACE, HOT MIX ASPHALT SM 5,615 24.00 134,760.00 23.00 129,145.00 222 NO ITEM U 0 .00 0.00 .00 0.00 223 NO ITEM U 0 .00 0.00 .00 0.00 RETAINING WALL NO. 1 224 RETAINING WALL, LOCATION NUMBER 1 SM 35 2,105.00 73,675.00 700.00 24,500.00 225 NO ITEM U 0 .00 0.00 .00 0.00 226 NO ITEM U 0 .00 0.00 .00 0.00 RETAINING WALL NO. 2 227 NO ITEM U 0 .00 0.00 .00 0.00 228 NO ITEM U 0 .00 0.00 .00 0.00 229 COARSE AGGREGATE LAYER CM 85 62.00 5,270.00 100.00 8,500.00 230 FOUNDATION EXCAVATION CM 1,740 21.00 36,540.00 25.00 43,500.00 231 CONCRETE IN STRUCTURES, FOOTINGS CM 175 625.00 109,375.00 650.00 113,750.00 232 CONCRETE IN STRUCTURES, RETAINING WALLS CM 200 .11 22.00 1,200.00 240,000.00 233 REINFORCEMENT STEEL IN STRUCTURES KG 15,100 .11 1,661.00 3.00 45,300.00 234 ARCHITECTURAL TREATMENT SM 330 100.00 33,000.00 75.00 24,750.00 235 TEMPORARY SHEETING SM 1,120 95.00 106,400.00 100.00 112,000.00 236 200 MM CORRUGATED STEEL UNDERDRAIN PIPE LM 100 65.00 6,500.00 115.00 11,500.00 SUMMARY OF AMOUNTS ROAD ITEMS $ 4,439,545.00 $ 5,533,831.80 BRIDGE ITEMS $ 372,443.00 $ 623,800.00 SUB-TOTAL AMOUNTS FOR BRIDGE WORK RETAINING WALL NO. 1 $ 73,675.00 $ 24,500.00 RETAINING WALL NO. 2 $ 298,768.00 $ 599,300.00 AGREE AGREE (HEADER) LOW BID =$ 4,811,988.00 (HEADER) 2ND LOW BID =$ 6,157,631.80 COMPUTED LOW BID =$ 4,811,988.00 COMPUTED 2ND LOW BID =$ 6,157,631.80 COMPUTED LOW BID =$ 4,811,988.00 COMPUTED 2ND LOW BID =$ 6,157,631.80