CPSBIDFM-1 DEPARTMENT OF TRANSPORTATION PAGE 1 CONSTRUCTION SERVICES/PROCUREMENT DIVISION TRENTON, NEW JERSEY TABULATION OF BIDS AND UNIT PRICES ROUTE I-676 AND MARTIN LUTHER KING BOULDVARD FROM THE VICINITY OF ROUTE US 30 TO NORTH OF CHESTNUT ST. CONTRACT NO. 003970170 MINOR WIDENING, TRAFFIC SIGNAL & RESURFACING CAMDEN CITY CAMDEN COUNTY D.P. NO. 04145 BIDS RECEIVED MARCH 29, 2005 CONTRACT AWARD DATE MAY 10, 2005 BIDDERS TOTAL PRICE BID 1 . A P CONSTRUCTION INC $ 11,189,126.00 915 S BLACK HORSE PIKE BLACKWOOD NJ08012 2 . DRISCOLL CONSTRUCTION CO INC T/A M J DRISCOLL $ 12,456,891.28 809 N. BETHLEHEM PIKE SPRING HOUSE PA19477 3 . FERREIRA CONSTRUCTION CO INC $ 13,699,387.00 3121 RT 22 EAST BRANCHBURG NJ08876 4 . IEW CONSTR GP $ 14,118,752.40 PO#8008 TRENTON NJ08650 5 . AGATE CONSTR CO INC $ 14,363,620.75 PO#107 KINGS HWY & RT#83 OCEAN VIEW NJ08230 ITEM DESCRIPTION UNIT CONTRACT LOW BIDDER 2ND LOW BIDDER NO. QUANTITY UNIT PRICE DOLLAR AMT. UNIT PRICE DOLLAR AMT. 1 PERFORMANCE BOND AND PAYMENT BOND LS 1 26,000.00 26,000.00 45,000.00 45,000.00 2 FINAL CLEANUP LS 1 20,000.00 20,000.00 20,000.00 20,000.00 3 CONSTRUCTION LAYOUT LS 1 155,000.00 155,000.00 200,000.00 200,000.00 4 CURING AND STORAGE FACILITY SET-UP U 1 5,000.00 5,000.00 30,000.00 30,000.00 5 FIELD OFFICE TYPE D SET-UP U 1 30,000.00 30,000.00 100,000.00 100,000.00 6 FIELD OFFICE TYPE D MAINTENANCE MO 21 800.00 16,800.00 3,000.00 63,000.00 7 TELEPHONE SERVICE LS 1 5,250.00 5,250.00 5,250.00 5,250.00 8 MATERIALS FIELD LABORATORY SET-UP U 1 8,000.00 8,000.00 60,000.00 60,000.00 9 MATERIALS FIELD LABORATORY MAINTENANCE MO 19 550.00 10,450.00 1,500.00 28,500.00 10 FUEL PRICE ADJUSTMENT LS 1 4,200.00 4,200.00 4,200.00 4,200.00 11 CURING AND STORAGE FACILITY MAINTENANCE MO 19 400.00 7,600.00 1,000.00 19,000.00 12 TRAINEES HRS 6,000 1.00 6,000.00 1.00 6,000.00 13 OWNER'S AND CONTRACTOR'S PROTECTIVE LS 1 14,600.00 14,600.00 12,500.00 12,500.00 LIABILITY INSURANCE 14 RAILROAD PROTECTIVE LIABILITY INSURANCE LS 1 20,000.00 20,000.00 2,500.00 2,500.00 15 PROGRESS SCHEDULE LS 1 10,000.00 10,000.00 25,000.00 25,000.00 16 MOBILIZATION LS 1 390,000.00 390,000.00 600,000.00 600,000.00 17 ROADWAY EXCAVATION, TEMPORARY EROSION CONTROL CM 12 86.60 1,039.20 50.00 600.00 18 HAYBALES U 50 50.00 2,500.00 18.00 900.00 19 REMOVAL OF PAVEMENT REFLECTORS AND CASTINGS U 450 10.00 4,500.00 18.00 8,100.00 20 CLEARING SITE LS 1 35,000.00 35,000.00 35,000.00 35,000.00 21 STRIPPING HA 1 7,800.00 7,800.00 40,000.00 40,000.00 22 ROADWAY EXCAVATION, UNCLASSIFIED CM 8,830 55.00 485,650.00 18.00 158,940.00 23 MILLING, 50 MM DEPTH SM 7,084 10.00 70,840.00 6.00 42,504.00 24 MILLING, 75 MM DEPTH SM 6,464 12.00 77,568.00 5.00 32,320.00 25 SUBBASE CM 519 97.00 50,343.00 72.00 37,368.00 26 SILT FENCE LM 903 12.00 10,836.00 11.00 9,933.00 27 INLET FILTERS U 70 100.00 7,000.00 100.00 7,000.00 28 SAWCUTTING LM 321 26.00 8,346.00 17.00 5,457.00 29 ASPHALT PRICE ADJUSTMENT LS 1 16,400.00 16,400.00 16,400.00 16,400.00 30 DENSE GRADED AGGREGATE BASE COURSE, SM 3,392 15.00 50,880.00 14.50 49,184.00 150 MM THICK 31 COARSE AGGREGATE, SIZE NO. 8 CM 30 96.00 2,880.00 90.00 2,700.00 32 CONCRETE BASE COURSE, 225 MM THICK SM 668 118.00 78,824.00 125.00 83,500.00 33 EARTH EXCAVATION FOR TEST PITS CM 4 480.00 1,920.00 200.00 800.00 34 SAWING AND SEALING JOINTS IN HOT MIX ASPHALT LM 11,800 2.25 26,550.00 9.00 106,200.00 OVERLAY 35 BITUMINOUS CONCRETE PATCH MGR 100 170.00 17,000.00 70.00 7,000.00 36 CORE SAMPLES, HOT MIX ASPHALT U 45 150.00 6,750.00 125.00 5,625.00 37 TACK COAT L 22,456 .10 2,245.60 .55 12,350.80 38 PRIME COAT L 3,773 .10 377.30 .65 2,452.45 39 SUPERPAVE HOT MIX ASPHALT 12.5H76 SURFACE MGR 8,047 63.00 506,961.00 74.00 595,478.00 COURSE 40 SUPERPAVE HOT MIX ASPHALT 19H64 INTERMEDIATE MGR 355 180.00 63,900.00 72.00 25,560.00 COURSE 41 SUPERPAVE HOT MIX ASPHALT 25M64 BASE COURSE MGR 6,163 74.00 456,062.00 53.00 326,639.00 42 30MM MOGFC-1 MGR 3,005 100.00 300,500.00 85.00 255,425.00 43 FULL DEPTH REINFORCED CONCRETE PAVEMENT SM 602 550.00 331,100.00 450.00 270,900.00 REPAIR 44 PARTIAL DEPTH CONCRETE PAVEMENT PATCH SM 13 1,200.00 15,600.00 2,300.00 29,900.00 45 DOWEL BAR RETROFITTING U 138 100.00 13,800.00 200.00 27,600.00 46 SLAB STABILIZATION-GROUT BAG 11 1,600.00 17,600.00 2,000.00 22,000.00 47 CRACK STITCHING U 946 125.00 118,250.00 200.00 189,200.00 48 SEALING OF JOINTS IN CONCRETE SURFACE COURSE LM 434 8.00 3,472.00 25.00 10,850.00 49 SLAB STABILIZATION-DEFLECTION TESTING J 18 550.00 9,900.00 500.00 9,000.00 50 MILLING CONCRETE, 30MM VARIABLE DEPTH SM 1,122 46.00 51,612.00 13.00 14,586.00 51 MONUMENTS U 8 100.00 800.00 375.00 3,000.00 52 300 MM DUCTILE IRON CULVERT PIPE LM 17 478.00 8,126.00 190.00 3,230.00 53 375 MM REINFORCED CONCRETE CULVERT PIPE LM 71 490.00 34,790.00 140.00 9,940.00 54 450 MM REINFORCED CONCRETE CULVERT PIPE LM 62 515.00 31,930.00 155.00 9,610.00 55 CLEANING EXISTING PIPE, 300 TO 600 MM LM 100 36.00 3,600.00 23.00 2,300.00 DIAMETER 56 SNOW FENCE, PLASTIC LM 110 12.00 1,320.00 16.00 1,760.00 57 INLETS, TYPE B U 17 4,000.00 68,000.00 4,000.00 68,000.00 58 2.0M BARRIER CURB OPENING COVER U 4 6,000.00 24,000.00 4,300.00 17,200.00 59 RESET CASTINGS U 27 400.00 10,800.00 525.00 14,175.00 60 INLETS CONVERTED TO MANHOLES U 7 2,400.00 16,800.00 1,750.00 12,250.00 61 RECONSTRUCTED INLETS, TYPE D-1, USING NEW U 4 1,800.00 7,200.00 4,400.00 17,600.00 CASTING 62 RECONSTRUCTED INLETS, TYPE D-2, USING NEW U 12 1,800.00 21,600.00 5,000.00 60,000.00 CASTING 63 RECONSTRUCTED INLETS, TYPE E, USING NEW U 1 1,800.00 1,800.00 3,500.00 3,500.00 CASTING 64 RECONSTRUCTED INLETS, TYPE B, USING EXISTING U 1 1,600.00 1,600.00 3,500.00 3,500.00 CASTING 65 INLETS, TYPE B-2 U 2 5,000.00 10,000.00 5,800.00 11,600.00 66 INLETS, TYPE B-1 U 1 5,000.00 5,000.00 5,200.00 5,200.00 67 BICYCLE SAFE GRATES U 23 400.00 9,200.00 1,000.00 23,000.00 68 375 BY 1 040 MM CONCRETE BARRIER CURB LM 28 470.00 13,160.00 575.00 16,100.00 69 600 MM BY VARIABLE HEIGHT CONCRETE BARRIER LM 306 300.00 91,800.00 340.00 104,040.00 CURB 70 600 BY 800 MM CONCRETE BARRIER CURB LM 718 300.00 215,400.00 195.00 140,010.00 71 300 BY 325 MM CONCRETE SLOPING CURB LM 577 90.00 51,930.00 60.00 34,620.00 72 225 BY 400 MM CONCRETE VERTICAL CURB LM 1,242 90.00 111,780.00 67.00 83,214.00 73 CONCRETE SIDEWALK, 100 MM THICK SM 979 86.00 84,194.00 52.00 50,908.00 74 DETECTABLE WARNING SURFACES SM 10 300.00 3,000.00 285.00 2,850.00 75 HOT MIX ASPHALT ISLAND, 100 MM THICK SM 419 55.00 23,045.00 29.00 12,151.00 76 CONCRETE ISLAND, 100 MM THICK SM 273 100.00 27,300.00 65.00 17,745.00 77 BEAM GUIDE RAIL LM 2,285 55.00 125,675.00 58.00 132,530.00 78 SLOTTED GUIDE RAIL TERMINALS U 7 2,800.00 19,600.00 2,100.00 14,700.00 79 CONTROLLED RELEASE TERMINALS U 2 1,200.00 2,400.00 1,050.00 2,100.00 80 BEAM GUIDE RAIL ANCHORAGES U 4 700.00 2,800.00 800.00 3,200.00 81 RUB RAIL LM 1,626 40.00 65,040.00 26.00 42,276.00 82 MISCELLANEOUS CONCRETE CM 1 1,000.00 1,000.00 1,200.00 1,200.00 83 CHAIN-LINK FENCE, 1.8 M HIGH LM 106 100.00 10,600.00 95.00 10,070.00 84 RESET FENCE LM 15 65.00 975.00 50.00 750.00 85 REPAIRING CHAIN-LINK FENCE LM 25 55.00 1,375.00 35.00 875.00 86 BREAKAWAY BARRICADES U 40 100.00 4,000.00 250.00 10,000.00 87 PRECAST CONCRETE CURB, CONSTRUCTION BARRIER, LM 4,900 90.00 441,000.00 125.00 612,500.00 TYPE 4 88 DRUMS U 85 67.00 5,695.00 150.00 12,750.00 89 TRAFFIC CONES U 30 15.00 450.00 40.00 1,200.00 90 CONSTRUCTION IDENTIFICATION SIGNS, U 2 550.00 1,100.00 600.00 1,200.00 1 200 BY 2 400 MM 91 VARIABLE MESSAGE SIGNS U 2 6,800.00 13,600.00 22,000.00 44,000.00 92 CONSTRUCTION SIGNS SM 177 130.00 23,010.00 225.00 39,825.00 93 TRAFFIC CONTROL TRUCKS WITH MOUNTED U 4 4,800.00 19,200.00 25,000.00 100,000.00 CRASH CUSHIONS 94 TEMPORARY CRASH CUSHIONS, INERTIAL BARRIER U 1 4,800.00 4,800.00 7,200.00 7,200.00 SYSTEM, 10 MODULES 95 TEMPORARY CRASH CUSHIONS, INERTIAL BARRIER U 4 5,000.00 20,000.00 6,000.00 24,000.00 SYSTEM, 14 MODULES 96 TEMPORARY CRASH CUSHIONS, QUADGUARD, U 4 6,000.00 24,000.00 15,000.00 60,000.00 6 BAYS, 610 MM WIDE 97 REMOVABLE WET WEATHER PAVEMENT MARKING TAPE LM 2,400 5.00 12,000.00 5.00 12,000.00 98 TRAFFIC STRIPES, LONG LIFE, EPOXY RESIN LM 13,739 1.00 13,739.00 1.05 14,425.95 99 TRAFFIC MARKINGS, LINES, LONG LIFE, LM 2,660 2.00 5,320.00 1.50 3,990.00 THERMOPLASTIC 100 TRAFFIC MARKINGS, SYMBOLS, LONG LIFE, SM 133 50.00 6,650.00 40.00 5,320.00 THERMOPLASTIC 101 REMOVAL OF TRAFFIC STRIPES AND MARKINGS LM 7,650 1.00 7,650.00 1.20 9,180.00 102 TWO-WAY PLOWABLE MONO-DIRECTIONAL U 345 30.00 10,350.00 26.00 8,970.00 WHITE PAVEMENT REFLECTORS AND CASTINGS 103 TWO-WAY PLOWABLE MONO-DIRECTIONAL U 108 30.00 3,240.00 26.00 2,808.00 AMBER PAVEMENT REFLECTORS AND CASTINGS 104 SIGNS SM 69 250.00 17,250.00 285.00 19,665.00 105 GUIDE SIGNS, TYPE GA, STEEL "U" POST SUPPORTS SM 10 250.00 2,500.00 400.00 4,000.00 106 GUIDE SIGN PANELS, TYPE GO SM 27 300.00 8,100.00 300.00 8,100.00 107 CRASH CUSHIONS, QUADGUARD, 2 BAYS, U 2 7,600.00 15,200.00 8,000.00 16,000.00 610 MM WIDE 108 CRASH CUSHIONS, QUADGUARD, 6 BAYS, U 1 14,000.00 14,000.00 15,000.00 15,000.00 610 MM WIDE 109 PERMEABLE PAVERS SM 68 200.00 13,600.00 160.00 10,880.00 110 FLEXIBLE DELINEATORS, BARRIER CURB MOUNTED U 100 10.00 1,000.00 21.00 2,100.00 111 GUIDE SIGN PANELS, TYPE GOX SM 13 400.00 5,200.00 400.00 5,200.00 112 41 MM RIGID METALLIC CONDUIT, TYPE CUG LM 49 80.00 3,920.00 84.00 4,116.00 113 53 MM RIGID METALLIC CONDUIT, TYPE CUG LM 151 80.00 12,080.00 73.00 11,023.00 114 78 MM RIGID METALLIC CONDUIT, TYPE CUG LM 1,119 90.00 100,710.00 92.00 102,948.00 115 41 MM RIGID METALLIC CONDUIT, TYPE CUR LM 28 100.00 2,800.00 95.00 2,660.00 116 53 MM RIGID METALLIC CONDUIT, TYPE CUR LM 31 100.00 3,100.00 100.00 3,100.00 117 78 MM RIGID METALLIC CONDUIT, TYPE CUR LM 555 150.00 83,250.00 168.00 93,240.00 118 103 MM RIGID METALLIC CONDUIT, TYPE CUR LM 8 200.00 1,600.00 212.00 1,696.00 119 78 MM RIGID NONMETALLIC CONDUIT LM 5 130.00 650.00 116.00 580.00 120 GROUND WIRE, NO. 8 AWG LM 2,773 2.00 5,546.00 1.70 4,714.10 121 MULTIPLE LIGHTING WIRE, NO. 2 AWG LM 6,233 8.00 49,864.00 8.50 52,980.50 122 MULTIPLE LIGHTING WIRE, NO. 6 AWG LM 542 8.00 4,336.00 7.00 3,794.00 123 MULTIPLE LIGHTING WIRE, NO. 8 AWG LM 1,261 8.00 10,088.00 8.00 10,088.00 124 MULTIPLE LIGHTING WIRE, NO. 10 AWG LM 38 2.00 76.00 2.00 76.00 125 SERVICE WIRE, NO. 6 AWG LM 534 6.00 3,204.00 7.00 3,738.00 126 FOUNDATIONS, TYPE SFT U 12 1,200.00 14,400.00 1,250.00 15,000.00 127 FOUNDATIONS, TYPE MCF U 2 1,000.00 2,000.00 1,000.00 2,000.00 128 FOUNDATIONS, TYPE P U 1 1,200.00 1,200.00 1,300.00 1,300.00 129 FOUNDATIONS, TYPE P-MC U 2 2,000.00 4,000.00 2,000.00 4,000.00 130 FOUNDATIONS, TYPE SPF U 2 1,000.00 2,000.00 950.00 1,900.00 131 FOUNDATIONS, TYPE SFK U 1 1,300.00 1,300.00 1,350.00 1,350.00 132 FOUNDATIONS, TYPE 2M-MC U 1 4,000.00 4,000.00 4,000.00 4,000.00 133 JUNCTION BOX FOUNDATIONS U 21 2,200.00 46,200.00 2,200.00 46,200.00 134 965 MM JUNCTION BOXES U 1 3,500.00 3,500.00 3,350.00 3,350.00 135 445 BY 775 MM JUNCTION BOXES U 3 2,200.00 6,600.00 1,950.00 5,850.00 136 450 BY 900 MM JUNCTION BOXES U 27 2,500.00 67,500.00 2,650.00 71,550.00 137 RIGID NON-METALLIC MULTIDUCT LM 50 90.00 4,500.00 90.00 4,500.00 CONDUIT, TYPE MBC 138 LOOP DETECTOR LM 784 50.00 39,200.00 47.00 36,848.00 139 LOOP DETECTOR LEAD LM 3,014 4.00 12,056.00 4.01 12,086.14 140 CONTROLLER ASSEMBLIES, 8 PHASE U 2 15,000.00 30,000.00 15,000.00 30,000.00 141 METER CABINETS, TYPE T U 3 2,000.00 6,000.00 2,000.00 6,000.00 142 METER CABINETS, TYPE TL U 1 2,700.00 2,700.00 2,700.00 2,700.00 143 PEDESTAL ASSEMBLIES, TYPE PW-1 U 2 1,500.00 3,000.00 1,450.00 2,900.00 144 PEDESTRIAN SIGNAL ASSEMBLIES, TYPE W-1 U 17 1,200.00 20,400.00 1,000.00 17,000.00 145 PUSH BUTTON ASSEMBLIES U 8 110.00 880.00 120.00 960.00 146 TRAFFIC SIGNAL ASSEMBLIES, TYPE 4.6MA-1 U 2 2,000.00 4,000.00 2,000.00 4,000.00 147 TRAFFIC SIGNAL ASSEMBLIES, TYPE 6.1MA-1 U 4 2,500.00 10,000.00 2,450.00 9,800.00 148 TRAFFIC SIGNAL ASSEMBLIES, TYPE 4.6MA-1-1-OP U 1 5,000.00 5,000.00 4,750.00 4,750.00 149 TRAFFIC SIGNAL ASSEMBLIES, TYPE 6.1MA-1-1-OP U 1 4,500.00 4,500.00 4,800.00 4,800.00 150 TRAFFIC SIGNAL ASSEMBLIES, TYPE 7.6MK-1 U 1 3,000.00 3,000.00 2,700.00 2,700.00 151 TRAFFIC SIGNAL ASSEMBLIES, TYPE H-1 U 1 1,000.00 1,000.00 1,000.00 1,000.00 152 TRAFFIC SIGNAL ASSEMBLIES, TYPE H-2 U 1 1,800.00 1,800.00 1,725.00 1,725.00 153 TRAFFIC SIGNAL ASSEMBLIES, TYPE C-1 U 2 1,000.00 2,000.00 900.00 1,800.00 154 TRAFFIC SIGNAL ASSEMBLIES, TYPE C-1-OP U 1 2,500.00 2,500.00 2,650.00 2,650.00 155 TRAFFIC SIGNAL ASSEMBLIES, TYPE MM-1 U 2 1,200.00 2,400.00 1,250.00 2,500.00 156 TRAFFIC SIGNAL CABLE, 2 CONDUCTOR LM 784 5.00 3,920.00 4.50 3,528.00 157 TRAFFIC SIGNAL CABLE, 5 CONDUCTOR LM 1,221 6.00 7,326.00 6.00 7,326.00 158 TRAFFIC SIGNAL CABLE, 10 CONDUCTOR LM 873 8.00 6,984.00 7.75 6,765.75 159 TRAFFIC SIGNAL STANDARDS, TYPE C U 4 1,500.00 6,000.00 1,525.00 6,100.00 160 TRAFFIC SIGNAL STANDARDS, TYPE T U 7 1,300.00 9,100.00 1,400.00 9,800.00 161 TRAFFIC SIGNAL STANDARDS, TYPE K U 1 2,200.00 2,200.00 2,200.00 2,200.00 162 TRAFFIC CONTROLLER ASSEMBLY TURN ON U 2 1,800.00 3,600.00 1,750.00 3,500.00 163 INTERIM TRAFFIC SIGNAL SYSTEM, LOCATION LS 1 100.00 100.00 1.00 1.00 NUMBER 1 164 LIGHTING ASSEMBLIES, TYPE L-R-V-X U 20 1,100.00 22,000.00 1,200.00 24,000.00 165 LIGHTING ARM ASSEMBLIES, TYPE L-4.6A-V U 4 1,200.00 4,800.00 1,300.00 5,200.00 166 LIGHTING STANDARD ASSEMBLIES, TYPE L-2.4A-X U 1 1,200.00 1,200.00 1,300.00 1,300.00 167 LIGHTING STANDARD ASSEMBLIES, TYPE L-2.4-V-X U 11 2,000.00 22,000.00 2,050.00 22,550.00 168 LIGHTING STANDARD ASSEMBLIES, TYPE L-4.6-V-X U 2 2,500.00 5,000.00 2,500.00 5,000.00 169 LIGHTING STANDARD ASSEMBLIES, U 7 2,500.00 17,500.00 2,500.00 17,500.00 TYPE L-4.6-12.2-CF-Y 170 LIGHTING STANDARD ASSEMBLIES, U 3 2,500.00 7,500.00 2,450.00 7,350.00 TYPE L-4.6-12.2-SB-CF-Y 171 METER CABINETS, TYPE 2M-MC U 1 10,000.00 10,000.00 10,500.00 10,500.00 172 UNDERDECK LIGHTING ASSEMBLIES, TYPE W U 4 2,000.00 8,000.00 1,750.00 7,000.00 173 SIGN LIGHTING ASSEMBLY, STRUCTURE NO. 1 LS 1 12,000.00 12,000.00 13,000.00 13,000.00 174 SIGN LIGHTING ASSEMBLY, STRUCTURE NO. 2 LS 1 6,000.00 6,000.00 6,100.00 6,100.00 175 METER CABINET, TYPE P-AVC U 1 40,000.00 40,000.00 41,000.00 41,000.00 176 AVC/WIM SITE, 4 LANES U 1 25,000.00 25,000.00 27,000.00 27,000.00 177 TELEPHONE WIRE, 6 PAIRS #22 AWG LM 70 5.00 350.00 5.25 367.50 178 FIBER OPTIC DISTRIBUTION CABLE LM 520 40.00 20,800.00 36.50 18,980.00 179 TERMINATION CABLE LM 5 17.00 85.00 15.00 75.00 180 FOUNDATION, TYPE CCTV22.9M U 1 3,500.00 3,500.00 3,550.00 3,550.00 181 CAMERA STANDARD, TYPE22.9M U 1 33,000.00 33,000.00 34,000.00 34,000.00 182 CAMERA ASSEMBLY U 1 15,000.00 15,000.00 14,000.00 14,000.00 183 FIBER OPTIC MODEM, TYPE CCTV U 1 6,500.00 6,500.00 6,200.00 6,200.00 184 COMMUNICATION MODIFICATIONS LS 1 130,000.00 130,000.00 130,000.00 130,000.00 185 TRAFFIC SIGNAL ASSEMBLIES, TYPE HC-2 U 1 1,800.00 1,800.00 1,850.00 1,850.00 186 TRAFFIC SIGNAL ASSEMBLIES, TYPE HM-1 U 1 1,400.00 1,400.00 1,500.00 1,500.00 187 SELECTIVE THINNING SM 17,000 2.00 34,000.00 1.60 27,200.00 188 TRIMMING EXISTING TREES, OVER 500 TO 600 MM U 12 400.00 4,800.00 320.00 3,840.00 DIAMETER 189 TRIMMING EXISTING HAWTHORN TREES U 17 400.00 6,800.00 110.00 1,870.00 190 PREPARATION OF EXISTING SOIL SM 5,000 1.00 5,000.00 2.25 11,250.00 191 TOPSOILING, 100 MM THICK SM 6,596 2.00 13,192.00 1.50 9,894.00 192 CLEANING EXISTING DRAINAGE STRUCTURES U 5 300.00 1,500.00 600.00 3,000.00 193 FERTILIZING AND SEEDING, TYPE A-3 SM 6,596 1.00 6,596.00 .40 2,638.40 194 FERTILIZING AND SEEDING, TYPE F SM 660 1.00 660.00 .40 264.00 195 TOPSOIL STABILIZATION MATTING SM 187 6.00 1,122.00 3.25 607.75 196 SODDING SM 380 7.00 2,660.00 6.50 2,470.00 197 STRAW MULCHING SM 7,256 1.00 7,256.00 .40 2,902.40 198 WOOD MULCHING SM 3,619 5.00 18,095.00 3.46 12,521.74 199 WOOD MULCHING, 50 MM THICK SM 255 4.00 1,020.00 2.25 573.75 200 MOWING EXISTING TURF SM 10,000 .20 2,000.00 .15 1,500.00 201 ACER RUBRUM "OCTOBER GLORY", B&B, 50 TO 60 MM U 14 300.00 4,200.00 240.00 3,360.00 CALIPER, 3.6 TO 4.2 M HIGH 202 ACER RUBRUM "RED SUNSET", B&B, 50 TO 60 MM U 15 300.00 4,500.00 240.00 3,600.00 CALIPER, 3.6 TO 4.2 M HIGH 203 HEMEROCALLIS, # SP5 CONTAINER, 1 TO 2 FAN U 393 8.00 3,144.00 10.00 3,930.00 DIVISION, HEAVY ROOT SYSTEM 204 ILEX GLABRA "COMPACTA", B&B, U 18 30.00 540.00 30.00 540.00 0.5 TO 0.6 M HIGH 205 NARCISSUS, BULBS U 852 2.00 1,704.00 1.00 852.00 206 PARTHENOCISSUS TRICUSPIDATA "VEITCHII", U 20 6.00 120.00 6.50 130.00 100 MM POT 207 PICEA ABIES, B&B, 2.0 TO 2.5 M HIGH U 19 225.00 4,275.00 185.00 3,515.00 208 PINUS STROBUS, B&B, 2.5 TO 2.7 M HIGH U 13 200.00 2,600.00 200.00 2,600.00 209 PLATANUS ACERIFOLIA 'BLOODGOOD', B&B, U 5 250.00 1,250.00 240.00 1,200.00 50 TO 60 MM CALIPER, 3.6 TO 4.2 M HIGH 210 ORNAMENTAL FENCE LM 73 400.00 29,200.00 385.00 28,105.00 211 BED RENOVATION SM 200 7.00 1,400.00 22.00 4,400.00 212 WATERING CM 1,127 7.00 7,889.00 .50 563.50 213 NONVEGETATIVE SURFACE, HOT MIX ASPHALT SM 3,683 26.00 95,758.00 31.00 114,173.00 214 ACER X FREEMANII'JEFFERSRED', 50-60MM U 12 250.00 3,000.00 250.00 3,000.00 CALIPER, 3.6-4.2M HIGH 215 AESCULUS PAVIA, B&B, 40-45MM U 8 280.00 2,240.00 175.00 1,400.00 CALIPER, 1.8-2.0M HIGH 216 AMELANCHIER X GRANDIFLORA'AUTUMN BRILLIANCE', U 20 140.00 2,800.00 100.00 2,000.00 B&B, 1.5-1.8M HIGH 217 CORNUS X RUTBAN', 1.8-2.5M HIGH U 17 140.00 2,380.00 185.00 3,145.00 218 FRAXINUS PENNSYLVANICA 'URBANITE', B&B, U 14 200.00 2,800.00 300.00 4,200.00 60-80MM CALIPER, 4.2-4.8M HIGH 219 GINKGO BILOBA'AUTUMN GOLD', B&B, 60-80MM U 13 450.00 5,850.00 300.00 3,900.00 CALIPER, 4.2-4.8M HIGH 220 GLEDITSIA TRIACANTHOS INERMIS 'SKYCOLE', U 10 300.00 3,000.00 300.00 3,000.00 B&B, 60-80MM CALIPER, 4.2-4.8M HIGH 221 WILDFLOWER SEEDING SM 200 3.00 600.00 3.75 750.00 222 EUONYMUS FORTUNEI 'COLORATUS', 100MM POT U 1,460 5.00 7,300.00 6.00 8,760.00 223 LIRIOPE MUSCARI 'VARIEGATE', 100MM POT U 513 5.00 2,565.00 6.00 3,078.00 224 NARCISSUS IN TURF, BULBS U 37,471 1.40 52,459.40 1.00 37,471.00 225 VINCA MINOR, 100MM POT U 3,927 3.00 11,781.00 6.00 23,562.00 226 RELOCATE SIGN WITH 2-150MM POSTS U 1 2,200.00 2,200.00 100.00 100.00 227 RELOCATE SIGN WITH 1-150MM POSTS U 1 1,400.00 1,400.00 100.00 100.00 228 RELOCATE SIGN WITH 1-89MM POSTS U 1 1,500.00 1,500.00 85.00 85.00 229 REMOVAL OF GUIDE RAIL LM 2,285 8.00 18,280.00 6.50 14,852.50 230 NO ITEM U 0 .00 0.00 .00 0.00 I-676 OVER PINE STREET (STRUCTURE #0430-150) 231 TEMPORARY SHIELDING LS 1 25,000.00 25,000.00 50,000.00 50,000.00 232 CLEARING SITE, BRIDGE LS 1 17,000.00 17,000.00 17,000.00 17,000.00 233 FOUNDATION EXCAVATION CM 475 68.00 32,300.00 50.00 23,750.00 234 CONCRETE IN STRUCTURES, FOOTINGS CM 77 550.00 42,350.00 800.00 61,600.00 235 CONCRETE IN STRUCTURES, RETAINING WALLS CM 98 1,250.00 122,500.00 1,300.00 127,400.00 236 CONCRETE IN SUBSTRUCTURES, ABUTMENT WALLS CM 50 1,150.00 57,500.00 2,000.00 100,000.00 237 REINFORCEMENT STEEL IN STRUCTURES KG 13,245 2.50 33,112.50 2.35 31,125.75 238 REINFORCEMENT STEEL IN STRUCTURES, EPOXY KG 6,399 3.00 19,197.00 2.60 16,637.40 COATED 239 EPOXY WATERPROOFING SEAL COAT SM 6 55.00 330.00 45.00 270.00 240 SAWCUT GROOVED DECK SURFACE SM 656 5.00 3,280.00 14.00 9,184.00 241 STRUCTURAL STEEL LS 1 85,000.00 85,000.00 40,000.00 40,000.00 242 SHEAR CONNECTORS U 348 5.00 1,740.00 3.00 1,044.00 243 TEMPORARY SHEETING SM 220 225.00 49,500.00 250.00 55,000.00 244 SCARIFICATION SM 710 20.00 14,200.00 25.00 17,750.00 245 200 MM CORRUGATED STEEL UNDERDRAIN PIPE LM 32 200.00 6,400.00 140.00 4,480.00 246 78 MM RIGID METALLIC CONDUIT, TYPE CUG LM 175 175.00 30,625.00 150.00 26,250.00 247 41 MM RIGID METALLIC CONDUIT, TYPE CUR LM 15 175.00 2,625.00 100.00 1,500.00 248 53 MM RIGID METALLIC CONDUIT, TYPE CUR LM 15 175.00 2,625.00 125.00 1,875.00 249 250 BY 900 MM JUNCTION BOXES U 2 2,000.00 4,000.00 2,050.00 4,100.00 250 200 BY 200 BY 150 MM CAST JUNCTION BOXES U 2 1,000.00 2,000.00 900.00 1,800.00 251 HEAVY TRUCK PARAPET STEEL RAILING LM 65 950.00 61,750.00 275.00 17,875.00 252 ASPHALTIC BRIDGE JOINT SYSTEM LM 74 300.00 22,200.00 500.00 37,000.00 253 CONCRETE IN SUPERSTRUCTURE, DECK SLABS-HPC CM 25 850.00 21,250.00 3,000.00 75,000.00 254 CONCRETE IN SUPERSTRUCTURE, LM 70 1,000.00 70,000.00 1,500.00 105,000.00 PARAPETS-HPC - 515MM X 810MM 255 CONCRETE DECK OVERLAY CM 55 1,000.00 55,000.00 3,800.00 209,000.00 PROTECTIVE SYSTEM-RSLMC 256 375MM X 810MM CONCRETE CURB, BRIDGE LM 41 900.00 36,900.00 825.00 33,825.00 257 POROUS FILL CM 515 86.00 44,290.00 50.00 25,750.00 I-676 OVER HADDON AVENUE (STRUCTURE #0430-151) 258 CLEARING SITE, BRIDGE LS 1 17,000.00 17,000.00 17,000.00 17,000.00 259 REINFORCEMENT STEEL IN STRUCTURES, EPOXY KG 10,050 3.00 30,150.00 2.65 26,632.50 COATED 260 SAWCUT GROOVED DECK SURFACE SM 1,740 5.00 8,700.00 14.00 24,360.00 261 SCARIFICATION SM 1,870 20.00 37,400.00 25.00 46,750.00 262 78 MM RIGID METALLIC CONDUIT, TYPE CUG LM 344 175.00 60,200.00 145.00 49,880.00 263 41 MM RIGID METALLIC CONDUIT, TYPE CUR LM 30 175.00 5,250.00 100.00 3,000.00 264 250 BY 900 MM JUNCTION BOXES U 5 2,000.00 10,000.00 2,050.00 10,250.00 265 ASPHALTIC BRIDGE JOINT SYSTEM LM 225 300.00 67,500.00 300.00 67,500.00 266 CONCRETE IN SUPERSTRUCTURE, LM 156 1,000.00 156,000.00 1,500.00 234,000.00 PARAPET-HPC - 457MM X 1070MM 267 CONCRETE DECK OVERLAY PROTECTION CM 215 1,000.00 215,000.00 2,000.00 430,000.00 SYSTEM-RSLMC 268 600MM X 810MM CONCRETE CURB, BRIDGE LM 57 500.00 28,500.00 800.00 45,600.00 269 NO ITEM U 0 .00 0.00 .00 0.00 270 NO ITEM U 0 .00 0.00 .00 0.00 271 NO ITEM U 0 .00 0.00 .00 0.00 272 NO ITEM U 0 .00 0.00 .00 0.00 I-676 OVER NEWTON AVENUE (STRUCTURE #0430-152) 273 TEMPORARY SHIELDING LS 1 28,600.00 28,600.00 65,000.00 65,000.00 274 CLEARING SITE, BRIDGE LS 1 31,000.00 31,000.00 31,000.00 31,000.00 275 FOUNDATION EXCAVATION CM 330 68.00 22,440.00 50.00 16,500.00 276 CONCRETE IN STRUCTURES, FOOTINGS CM 66 550.00 36,300.00 650.00 42,900.00 277 CONCRETE IN STRUCTURES, RETAINING WALLS CM 46 1,250.00 57,500.00 1,900.00 87,400.00 278 CONCRETE IN SUBSTRUCTURES, ABUTMENT WALLS CM 83 1,150.00 95,450.00 2,000.00 166,000.00 279 REINFORCEMENT STEEL IN STRUCTURES, EPOXY KG 6,983 3.00 20,949.00 2.40 16,759.20 COATED 280 REINFORCEMENT STEEL IN STRUCTURES KG 11,220 2.50 28,050.00 2.60 29,172.00 281 EPOXY WATERPROOFING SEAL COAT SM 10 55.00 550.00 45.00 450.00 282 SAWCUT GROOVED DECK SURFACE SM 783 5.00 3,915.00 14.00 10,962.00 283 STRUCTURAL STEEL LS 1 95,000.00 95,000.00 60,000.00 60,000.00 284 SHEAR CONNECTORS U 348 5.00 1,740.00 3.00 1,044.00 285 TEMPORARY SHEETING SM 180 225.00 40,500.00 300.00 54,000.00 286 SCARIFICATION SM 770 20.00 15,400.00 25.00 19,250.00 287 200 MM CORRUGATED STEEL UNDERDRAIN PIPE LM 48 200.00 9,600.00 100.00 4,800.00 288 78 MM RIGID METALLIC CONDUIT, TYPE CUG LM 136 175.00 23,800.00 165.00 22,440.00 289 41 MM RIGID METALLIC CONDUIT, TYPE CUR LM 30 175.00 5,250.00 105.00 3,150.00 290 250 BY 900 MM JUNCTION BOXES U 2 2,000.00 4,000.00 2,050.00 4,100.00 291 200 BY 200 BY 150 MM CAST JUNCTION BOXES U 2 1,000.00 2,000.00 900.00 1,800.00 292 HEAVY TRUCK PARAPET STEEL RAILING LM 56 950.00 53,200.00 275.00 15,400.00 293 ASPHALTIC BRIDGE JOINT SYSTEM LM 103 300.00 30,900.00 500.00 51,500.00 294 CONCRETE IN SUPERSTRUCTURE, DECK SLABS-HPC CM 35 850.00 29,750.00 2,800.00 98,000.00 295 CONCRETE IN SUPERSTRUCTURE, CM 60 1,000.00 60,000.00 1,500.00 90,000.00 PARAPETS-HPC - 515MM X 810MM 296 CONCRETE DECK OVERLAY PROTECTIVE CM 70 1,000.00 70,000.00 2,500.00 175,000.00 SYSTEM-RSLMC 297 375MM X 810MM CONCRETE BARRIER CURB, BRIDGE LM 45 900.00 40,500.00 800.00 36,000.00 298 POROUS FILL CM 580 86.00 49,880.00 50.00 29,000.00 299 BORROW EXCAVATION, BRIDGE FOUNDATION CM 315 86.00 27,090.00 50.00 15,750.00 I-676 OVER RELOCATED MICKLE STREET 300 TEMPORARY SHIELDING LS 1 90,800.00 90,800.00 70,000.00 70,000.00 301 CLEARING SITE, BRIDGE LS 1 33,000.00 33,000.00 33,000.00 33,000.00 302 REINFORCEMENT STEEL IN STRUCTURES, EPOXY KG 10,550 3.00 31,650.00 2.65 27,957.50 COATED 303 SAWCUT GROOVED DECK SURFACE SM 1,665 5.00 8,325.00 14.00 23,310.00 304 SCARIFICATION SM 1,770 20.00 35,400.00 25.00 44,250.00 305 78 MM RIGID METALLIC CONDUIT, TYPE CUG LM 300 175.00 52,500.00 160.00 48,000.00 306 41 MM RIGID METALLIC CONDUIT, TYPE CUR LM 30 175.00 5,250.00 100.00 3,000.00 307 250 BY 900 MM JUNCTION BOXES U 6 2,000.00 12,000.00 2,050.00 12,300.00 308 HEAVY TRUCK PARAPET STEEL RAILING LM 131 950.00 124,450.00 275.00 36,025.00 309 ASPHALTIC BRIDGE JOINT SYSTEM LM 171 300.00 51,300.00 375.00 64,125.00 310 CONCRETE IN SUPERSTRUCTURE, DECK SLABS-HPC CM 38 850.00 32,300.00 3,600.00 136,800.00 311 CONCRETE IN SUPERSTRUCTURES, LM 135 1,000.00 135,000.00 1,300.00 175,500.00 PARAPETS-HPC - 515MM X 810MM 312 CONCRETE DECK OVERLAY PROTECTIVE CM 135 1,000.00 135,000.00 2,700.00 364,500.00 SYSTEM-RSLMC 313 375MM X 810MM CONCRETE BARRIER CURB, BRIDGE LM 130 900.00 117,000.00 750.00 97,500.00 314 NO ITEM U 0 .00 0.00 .00 0.00 CANTILEVER SIGN STRUCTURE NO. 1 315 CLEARING SITE, STRUCTURE LS 1 5,000.00 5,000.00 5,000.00 5,000.00 316 FOUNDATION EXCAVATION CM 50 68.00 3,400.00 75.00 3,750.00 317 CONCRETE IN STRUCTURES, FOOTINGS CM 15 550.00 8,250.00 1,000.00 15,000.00 318 REINFORCEMENT STEEL IN STRUCTURES KG 702 2.50 1,755.00 2.60 1,825.20 319 REINFORCEMENT STEEL IN STRUCTURES, EPOXY KG 467 3.00 1,401.00 2.50 1,167.50 COATED 320 CANTILEVER SIGN SUPPORT, STRUCTURE NO. 1 U 1 50,000.00 50,000.00 55,000.00 55,000.00 321 TEMPORARY SHEETING SM 45 225.00 10,125.00 90.00 4,050.00 322 NO ITEM U 0 .00 0.00 .00 0.00 323 NO ITEM U 0 .00 0.00 .00 0.00 324 NO ITEM U 0 .00 0.00 .00 0.00 WALL NO. 1 325 RETAINING WALL, LOCATION NUMBER 1 SM 350 1,460.00 511,000.00 1,200.00 420,000.00 326 NO ITEM U 0 .00 0.00 .00 0.00 327 NO ITEM U 0 .00 0.00 .00 0.00 328 NO ITEM U 0 .00 0.00 .00 0.00 WALL NO. 2 329 RETAINING WALL, LOCATION NUMBER 2 SM 265 1,460.00 386,900.00 1,420.00 376,300.00 330 NO ITEM U 0 .00 0.00 .00 0.00 331 NO ITEM U 0 .00 0.00 .00 0.00 332 NO ITEM U 0 .00 0.00 .00 0.00 333 NO ITEM U 0 .00 0.00 .00 0.00 WALL NO. 3 334 FOUNDATION EXCAVATION CM 140 68.00 9,520.00 50.00 7,000.00 335 CONCRETE IN STRUCTURES, FOOTINGS CM 50 550.00 27,500.00 900.00 45,000.00 336 CONCRETE IN STRUCTURES, RETAINING WALLS CM 30 1,250.00 37,500.00 1,900.00 57,000.00 337 CONCRETE IN SUPERSTRUCTURE, PARAPETS LM 44 1,000.00 44,000.00 1,400.00 61,600.00 338 REINFORCEMENT STEEL IN STRUCTURES KG 1,500 2.50 3,750.00 2.40 3,600.00 339 REINFORCEMENT STEEL IN STRUCTURES, EPOXY KG 1,800 3.00 5,400.00 1.60 2,880.00 COATED 340 TEMPORARY SHEETING SM 190 225.00 42,750.00 100.00 19,000.00 341 200 MM CORRUGATED STEEL UNDERDRAIN PIPE LM 45 200.00 9,000.00 85.00 3,825.00 342 NO ITEM U 0 .00 0.00 .00 0.00 SUMMARY OF AMOUNTS ROAD ITEMS $ 6,786,161.50 $ 7,042,060.23 BRIDGE ITEMS $ 4,402,964.50 $ 5,414,831.05 SUB-TOTAL AMOUNTS FOR BRIDGE WORK I-676 OVER PINE STREET (STRUCTURE #0430-150) $ 862,674.50 $ 1,094,216.15 I-676 OVER HADDON AVENUE (STRUCTURE #0430-151) $ 635,700.00 $ 954,972.50 I-676 OVER NEWTON AVENUE (STRUCTURE #0430-152) $ 883,364.00 $ 1,147,377.20 I-676 OVER RELOCATED MICKLE STREET $ 863,975.00 $ 1,136,267.50 CANTILEVER SIGN STRUCTURE NO. 1 $ 79,931.00 $ 85,792.70 WALL NO. 1 $ 511,000.00 $ 420,000.00 WALL NO. 2 $ 386,900.00 $ 376,300.00 WALL NO. 3 $ 179,420.00 $ 199,905.00 AGREE AGREE (HEADER) LOW BID =$ 11,189,126.00 (HEADER) 2ND LOW BID =$ 12,456,891.28 COMPUTED LOW BID =$ 11,189,126.00 COMPUTED 2ND LOW BID =$ 12,456,891.28 COMPUTED LOW BID =$ 11,189,126.00 COMPUTED 2ND LOW BID =$ 12,456,891.28