CPSBIDFM-1 DEPARTMENT OF TRANSPORTATION PAGE 1 CONSTRUCTION SERVICES/PROCUREMENT DIVISION TRENTON, NEW JERSEY TABULATION OF BIDS AND UNIT PRICES RT. 130 OVER MAE BROOK, CONTRACT NO. 080993030, PARTIAL CULVERT REPLACEMENT NORTH BRUNSWICK TOWNSHIP, MIDDLESEX COUNTY D.P. NO. 05101 BIDS RECEIVED FEBRUARY 15, 2005 CONTRACT AWARD DATE MARCH 24, 2005 BIDDERS TOTAL PRICE BID 1 . RENCOR INC $ 847,617.00 24 TANNERY ROAD SUITE 1B SOMERVILLE NJ08870 2 . KYLE CONTI CONSTRUCTION LLC $ 1,110,000.00 1110 HAMILTON BLVD SOUTH PLAINFIELD NJ07080 3 . GREEN CONSTR INC $ 1,226,588.05 PO#550 ELIZABETH & BROWN LASO RIVER NJ08882 4 . PERRELLO INC $ 1,847,944.00 P O BOX 865 LAKE HOPATCONG NJ07849 ITEM DESCRIPTION UNIT CONTRACT LOW BIDDER 2ND LOW BIDDER NO. QUANTITY UNIT PRICE DOLLAR AMT. UNIT PRICE DOLLAR AMT. 1 PERFORMANCE BOND AND PAYMENT BOND LS 1 17,000.00 17,000.00 14,000.00 14,000.00 2 FINAL CLEANUP LS 1 7,500.00 7,500.00 5,000.00 5,000.00 3 CONSTRUCTION LAYOUT LS 1 12,500.00 12,500.00 11,000.00 11,000.00 4 FIELD OFFICE TYPE B SET-UP U 1 4,000.00 4,000.00 15,000.00 15,000.00 5 FIELD OFFICE TYPE B MAINTENANCE MO 12 500.00 6,000.00 1,000.00 12,000.00 6 TELEPHONE SERVICE LS 1 3,000.00 3,000.00 3,000.00 3,000.00 7 OWNER'S AND CONTRACTOR'S PROTECTIVE LS 1 15,000.00 15,000.00 15,000.00 15,000.00 LIABILITY INSURANCE 8 PROGRESS SCHEDULE LS 1 2,500.00 2,500.00 3,000.00 3,000.00 9 MOBILIZATION LS 1 85,000.00 85,000.00 100,000.00 100,000.00 10 NO ITEM U 0 .00 0.00 .00 0.00 11 NO ITEM U 0 .00 0.00 .00 0.00 12 CLEARING SITE LS 1 16,000.00 16,000.00 50,632.60 50,632.60 13 ROADWAY EXCAVATION, UNCLASSIFIED CM 208 40.00 8,320.00 50.00 10,400.00 14 EARTH EXCAVATION FOR TEST PITS CM 12 500.00 6,000.00 250.00 3,000.00 15 SAWCUTTING LM 54 25.00 1,350.00 35.00 1,890.00 16 SUBBASE CM 49 100.00 4,900.00 85.00 4,165.00 17 NO ITEM U 0 .00 0.00 .00 0.00 18 NO ITEM U 0 .00 0.00 .00 0.00 19 SILT FENCE LM 159 10.00 1,590.00 12.00 1,908.00 20 FLOATING TURBIDITY BARRIER LM 24 100.00 2,400.00 75.00 1,800.00 21 CONSTRUCTION DRIVEWAY MGR 48 85.00 4,080.00 30.00 1,440.00 22 DENSE GRADED AGGREGATE BASE COURSE, SM 33 10.00 330.00 90.00 2,970.00 150 MM THICK 23 DENSE GRADED AGGREGATE BASE COURSE, SM 324 12.00 3,888.00 20.00 6,480.00 200 MM THICK 24 NO ITEM U 0 .00 0.00 .00 0.00 25 NO ITEM U 0 .00 0.00 .00 0.00 26 BITUMINOUS CONCRETE PATCH MGR 40 50.00 2,000.00 110.00 4,400.00 27 TACK COAT L 117 1.00 117.00 1.00 117.00 28 PRIME COAT L 564 1.00 564.00 .10 56.40 29 SAWING AND SEALING JOINTS IN HOT MIX ASPHALT LM 57 50.00 2,850.00 60.00 3,420.00 OVERLAY 30 NO ITEM U 0 .00 0.00 .00 0.00 31 SUPERPAVE HMA MG 44 245.00 10,780.00 225.00 9,900.00 12.5M64 SURFACE COURSE 32 NO ITEM U 0 .00 0.00 .00 0.00 33 SUPERPAVE HMA MG 53 240.00 12,720.00 225.00 11,925.00 19M64 INTERMEDIATE COURSE 34 SUPERPAVE HOT MIX ASPHALT 25M64 BASE COURSE MGR 120 150.00 18,000.00 150.00 18,000.00 35 NO ITEM U 0 .00 0.00 .00 0.00 36 NO ITEM U 0 .00 0.00 .00 0.00 37 NO ITEM U 0 .00 0.00 .00 0.00 38 375 MM REINFORCED CONCRETE CULVERT PIPE LM 7 240.00 1,680.00 200.00 1,400.00 39 450 MM REINFORCED CONCRETE CULVERT PIPE LM 9 205.00 1,845.00 200.00 1,800.00 40 MANHOLES U 2 2,000.00 4,000.00 2,500.00 5,000.00 41 CAST IRON CURB PIECES U 2 750.00 1,500.00 240.00 480.00 42 NO ITEM U 0 .00 0.00 .00 0.00 43 NO ITEM U 0 .00 0.00 .00 0.00 44 225 BY 100 MM HOT MIX ASPHALT CURB LM 17 120.00 2,040.00 65.00 1,105.00 45 225 BY 400 MM CONCRETE VERTICAL CURB LM 36 85.00 3,060.00 100.00 3,600.00 46 MONUMENTS U 6 350.00 2,100.00 350.00 2,100.00 47 REMOVAL OF GUIDE RAIL LM 102 20.00 2,040.00 15.00 1,530.00 48 BEAM GUIDE RAIL LM 56 70.00 3,920.00 70.00 3,920.00 49 CONTROLLED RELEASE TERMINALS U 1 1,000.00 1,000.00 1,000.00 1,000.00 50 CONTROLLED RELEASE TERMINAL ANCHORAGES U 1 2,000.00 2,000.00 1,300.00 1,300.00 51 BEAM GUIDE RAIL ANCHORAGES U 1 1,200.00 1,200.00 800.00 800.00 52 RUB RAIL LM 36 35.00 1,260.00 35.00 1,260.00 53 NO ITEM U 0 .00 0.00 .00 0.00 54 SNOW FENCE, PLASTIC LM 166 20.00 3,320.00 12.00 1,992.00 55 MISCELLANEOUS CONCRETE CM 3 500.00 1,500.00 500.00 1,500.00 56 RIPRAP STONE SLOPE PROTECTION, 600 MM THICK SM 91 70.00 6,370.00 150.00 13,650.00 (D50=300 MM) 57 RIPRAP STONE CHANNEL PROTECTION, 600 MM THICK SM 24 90.00 2,160.00 150.00 3,600.00 (D50=300 MM) 58 NO ITEM U 0 .00 0.00 .00 0.00 59 NO ITEM U 0 .00 0.00 .00 0.00 60 BREAKAWAY BARRICADES U 20 75.00 1,500.00 90.00 1,800.00 61 DRUMS U 60 50.00 3,000.00 60.00 3,600.00 62 TRAFFIC CONES U 20 10.00 200.00 13.00 260.00 63 CONSTRUCTION IDENTIFICATION SIGNS, U 2 1,200.00 2,400.00 600.00 1,200.00 1 200 BY 2 400 MM 64 VARIABLE MESSAGE SIGNS U 2 2,000.00 4,000.00 10,000.00 20,000.00 65 CONSTRUCTION SIGNS SM 75 130.00 9,750.00 120.00 9,000.00 66 ILLUMINATED FLASHING ARROWS, 600 BY 1 200 MM U 2 5,000.00 10,000.00 3,500.00 7,000.00 67 TRAFFIC CONTROL TRUCKS WITH MOUNTED U 1 10,000.00 10,000.00 15,000.00 15,000.00 CRASH CUSHIONS 68 REMOVABLE PAVEMENT MARKING TAPE LM 120 15.00 1,800.00 9.00 1,080.00 69 TRAFFIC DIRECTORS, FLAGGERS HRS 360 10.00 3,600.00 24.00 8,640.00 70 TRAFFIC STRIPES LM 20 20.00 400.00 24.00 480.00 71 TEMPORARY CRASH CUSHIONS, INERTIAL BARRIER U 1 3,000.00 3,000.00 3,500.00 3,500.00 SYSTEM, 14 MODULES 72 PRECAST CONCRETE CURB, CONSTRUCTION BARRIER, LM 90 100.00 9,000.00 250.00 22,500.00 TYPE 4 73 NO ITEM U 0 .00 0.00 .00 0.00 74 NO ITEM U 0 .00 0.00 .00 0.00 75 NO ITEM U 0 .00 0.00 .00 0.00 76 FLEXIBLE DELINEATORS, GUIDE RAIL MOUNTED U 10 10.00 100.00 12.00 120.00 77 TRAFFIC STRIPES, LONG LIFE, EPOXY RESIN LM 30 25.00 750.00 45.00 1,350.00 78 REMOVAL OF TRAFFIC STRIPES AND MARKINGS LM 100 15.00 1,500.00 7.00 700.00 79 NO ITEM U 0 .00 0.00 .00 0.00 80 NO ITEM U 0 .00 0.00 .00 0.00 81 305 MM INSERT VALVES U 2 3,000.00 6,000.00 20,000.00 40,000.00 82 305 MM BY 203 MM TAPPING SLEEVES AND VALVES U 2 4,000.00 8,000.00 15,000.00 30,000.00 83 203 MM ELBOWS U 3 1,000.00 3,000.00 550.00 1,650.00 84 203 MM DUCTILE IRON WATER PIPE LM 27 500.00 13,500.00 250.00 6,750.00 CLASS 52 (TEMP) 85 305 MM DUCTILE IRON WATER PIPE LM 18 700.00 12,600.00 350.00 6,300.00 CLASS 52 (PERM.) 86 FIRE HYDRANT ASSEMBLIES U 1 3,500.00 3,500.00 4,500.00 4,500.00 87 CORPORATE STOPS U 2 800.00 1,600.00 85.00 170.00 88 305 MM VALVE BOXES U 4 200.00 800.00 150.00 600.00 89 203 MM PVC PIPE LM 40 200.00 8,000.00 300.00 12,000.00 SDR-35 (GRAVITY LINE) 90 51 MM PVC PIPE LM 52 100.00 5,200.00 175.00 9,100.00 SCHEDULE 80 (FORCE MAIN) 91 1220 MM PRECAST CONCRETE MANHOLE U 1 5,000.00 5,000.00 10,000.00 10,000.00 92 TEMPORARY BYPASS PUMPING SYSTEM LS 1 20,000.00 20,000.00 30,000.00 30,000.00 93 ASBESTOS CEMENT POPE HANDLING AND DISPOSAL LM 25 200.00 5,000.00 500.00 12,500.00 94 WATERING CM 5 94.00 470.00 100.00 500.00 95 WOOD MULCHING SM 18 5.00 90.00 22.00 396.00 96 TOPSOILING, 100 MM THICK SM 323 5.00 1,615.00 22.00 7,106.00 97 FERTILIZING AND SEEDING, TYPE A-3 SM 323 1.50 484.50 8.00 2,584.00 98 FERTILIZING AND SEEDING, TYPE F SM 32 1.50 48.00 24.00 768.00 99 STRAW MULCHING SM 355 1.50 532.50 6.00 2,130.00 100 NONVEGETATIVE SURFACE, HOT MIX ASPHALT SM 122 44.00 5,368.00 40.00 4,880.00 101 ACER RUBRUM, B&B, 60 TO 80 MM CALIPER, U 10 360.00 3,600.00 600.00 6,000.00 4.2 TO 4.8 M HIGH 102 VIBURNUM DENTATUM, B&B, 0.9 TO 1.25 M HIGH U 15 60.00 900.00 70.00 1,050.00 103 ASCLEPIAS INCARNATA, 31 CONTAINER U 15 19.00 285.00 30.00 450.00 RT. 130 OVER MAE BROOK CUVERT REPLACEMENT 104 CLEARING SITE, STRUCTURE LS 1 22,000.00 22,000.00 72,000.00 72,000.00 105 BRIDGE EXCAVATION CM 390 75.00 29,250.00 75.00 29,250.00 106 FOUNDATION EXCAVATION CM 74 150.00 11,100.00 75.00 5,550.00 107 CONCRETE IN STRUCTURES, RETAINING WALLS CM 24 950.00 22,800.00 2,500.00 60,000.00 108 NO ITEM U 0 .00 0.00 .00 0.00 109 REINFORCEMENT STEEL IN STRUCTURES, EPOXY KG 3,030 3.00 9,090.00 4.00 12,120.00 COATED 110 CONCRETE IN STRUCTURES, FOOTINGS CM 69 500.00 34,500.00 800.00 55,200.00 111 COFFERDAMS LS 1 35,000.00 35,000.00 35,000.00 35,000.00 112 PRECAST CONCRETE CULVERT LM 10 7,500.00 75,000.00 10,000.00 100,000.00 113 POROUS FILL CM 180 80.00 14,400.00 125.00 22,500.00 114 TEMPORARY SHEETING SM 277 500.00 138,500.00 275.00 76,175.00 115 NO ITEM U 0 .00 0.00 .00 0.00 116 NO ITEM U 0 .00 0.00 .00 0.00 117 NO ITEM U 0 .00 0.00 .00 0.00 118 NO ITEM U 0 .00 0.00 .00 0.00 SUMMARY OF AMOUNTS ROAD ITEMS $ 455,977.00 $ 642,205.00 BRIDGE ITEMS $ 391,640.00 $ 467,795.00 SUB-TOTAL AMOUNTS FOR BRIDGE WORK RT. 130 OVER MAE BROOK CUVERT REPLACEMENT $ 391,640.00 $ 467,795.00 AGREE AGREE (HEADER) LOW BID =$ 847,617.00 (HEADER) 2ND LOW BID =$ 1,110,000.00 COMPUTED LOW BID =$ 847,617.00 COMPUTED 2ND LOW BID =$ 1,110,000.00 COMPUTED LOW BID =$ 847,617.00 COMPUTED 2ND LOW BID =$ 1,110,000.00