Department of Transportation

Construction and Materials (DC&M) Material Procedures

Materials Procedures are detailed procedures used by Bureau of Materials and Regional Materials personnel in performing sampling and testing of materials. Materials Procedures do not supercede specifications (NJDOT, AASHTO, or ASTM). Materials Procedures give details on the administering of the specifications.

These files are in PDF format. You will need Adobe Acrobat Reader to view the PDF files which is available at our state Adobe Acrobat Access page.

Materials Procedures Index
Procedure Number Name Effective Date
MP1-25 Field Inspection & Testing of Concrete 3/3/2025
MP2-25 Concrete Batching Plants Duties 3/3/2025
MP3-25 Hot Mix Asphalt Plant Duties 3/3/2025
MP4-25 Testing  of HMA Cores 3/3/2025
MP6-25 Structural Steel Plant Inspection Duties 3/3/2025
MP8-25 Quality Assurance Oversight Program 3/3/2025
MP9-25 Precast/Prestressed Concrete Plant Inspection 3/3/2025
MP10-25 Reinforced Concrete Pipe Plant Inspection and Testing 3/3/2025
MP11-25 Sampling Bulk Liquid Bituminous Materials 3/3/2025
MP12-25 Reinforcing & Epoxy Coated Reinforcing Steel Inspection Duties 3/3/2025
MP14-25 Structural Steel Non-Destructive Testing & Inspection Duties 3/3/2025
MP15-25 Guide Sign Type GO, GA Inspection 3/3/2025
MP16-25 Field Sampling, Inspection & Testing of Soil Aggregates 3/3/2025
MP17-25 Duties of Personnel Using Nuclear Testing Equipment 3/3/2025
MP19-25 Sampling & Testing Cement at Point of Manufacture 3/3/2025
MP20-25 Daily Activities Report 3/3/2025
MP21-25 Calibration of Continuous Mixing Type Mobiles 3/3/2025
MP22-25 Project Diaries 3/3/2025
MP27-25 Drainage Casting Inspection Duties 3/3/2025
MP29-25 Determination of Evaporation Rate 3/3/2025
MP30-25 Materials Incident Notification Process 3/3/2025
MP31-5 Regional Calibration of Thermometers 3/3/2025
MP32-25 Asphalt Drum Mix Plant Calibration 3/3/2025
MP36-25 Hazardous Waste Materials – Bureau of Materials – Trenton 3/3/2025
MP37-25 Fume Hood Inspection 3/3/2025
MP38-25 Concrete Truck Inspection 3/3/2025
MP39-25 NJDOT Close out Procedure 3/3/2025
MP40-5 IR Analysis of Chemical Admixtures 3/3/2025
MP41-25 IR Analysis of Air Entraining Admixtures 3/3/2025
MP42-25 IR Analysis of Viscosity Modifying Admixtures 3/3/2025
MP43-25 IR Analysis of Structural Steel and Epoxy Traffic Paints 3/3/2025
MP46-25 CORING OF EXISTING CONCRETE 3/3/2025
MP47-25 CONCRETE MIX DESIGN VERIFICATION 3/3/2025


Last updated date: April 28, 2025 9:38 AM