BDC97T-002
September 1, 1998
Index of All Design Unit (ADU), In-House Design Unit (IDU) and All Personnel Concerned (APC) Memorandums
Shown below is an updated index of ADU, IDU and APC memorandums that had been issued through May 30, 1996 by the Division of Design and ROW for use in the preparation and review of Plans, Specifications and related documents. After May 30, 1996, all changes to baseline documents have been generated through Baseline Document Change Announcements (see BDC96T-001 dated July 24, 1996). The ADU Elimination Task Force, with help from the Subject Matter Experts, reduced the number of memorandums in the previous "Index of Reference Material" dated Nov. 1, 1995 from 710 to 70. The 640 superseded memorandums have been either outdated and eliminated; or updated and metricated and placed into various baseline documents such as the NJDOT Procedures Manual, Standard Specifications, Standard Details or Design Manuals. Only the 70 memorandums listed in the attached Index of ADUs are effective. Portions of these ADUs may contain information that has been included in current baseline documents. Should there be a discrepancy between the ADUs and the baseline documents, the baseline document shall govern. The remaining ADUs will eventually be eliminated when their Subject Matter Experts work them into the appropriate baseline documents or Internal Unit Procedures.
The Memorandum to All Design Units entitled "Index of Reference Material" dated November 1, 1995 is hereby superseded.
Typical Sec. In Rock: Roadway Excavation, Unclassified and Roadway Excavation, Rock | 03/11/60 |
---|---|
Treatment Of Exist Concrete Pavement Under New Pavement | 03/24/65 |
Plans For Demolition Projects | 05/19/65 |
As-Built Plans | 02/14/66 |
Maintenance Of Control Of Access By Fencing | 05/06/66 * |
Guide To Berm Widths For Rock Cut Sections | 08/02/66 |
Phase 2 Right Of Way Requirements for Party Walls & Partial Demolitions | 05/27/68 |
Partial Demolitions And Party Walls | 06/19/68 |
Trade Names | 06/03/70 |
Supplemental Specs, Art. 1.4.3. Railroad Traffic And Property | 06/15/70 |
Addendums | 03/21/77 * |
Bid-Unit Prices (confidentiality) | 09/28/77 * |
Soil Aggregate Designations | 02/28/78 |
Rejection Of Bids | 11/02/78 * |
Readvertisement Documents | 02/15/80 * |
Landscape Planting Plan Requirements | 04/07/80 |
Addendums | 03/05/81 * |
Contract Sets Of Supplementary Specifications | 01/18/82 * |
Addendum Acknowledgment Form Revision | 03/23/82 * |
Wage Rates - State | 05/18/83 * |
Clerical Typing, Reimbursement Of Costs | 08/10/83 |
Training Special Provisions | 07/16/85 * |
Salvaged Materials | 12/12/85 |
Federal Wage Determinations | 06/20/86 * |
Pipe Materials & Alternate Drainage Designs Partially Revised By Memorandum Dated July 21, 1989 | 12/10/86 |
Contractor Furnished Eq. or Materials Becoming Property of the State | 06/12/87 * |
Wetlands Planting Plans | 06/28/88 |
Sawing Joints In Base Course and/or Bottom Layer | 05/16/89 * |
Non CA-Post PS&E Plan Sheets | 09/20/89 |
Plan Sheet Titling And Consultant's Signature | 11/22/89 |
Clean Existing Pipe | 04/20/90 |
Proposal Attachment - Revised DBE Form A | 04/30/90 * |
Limitation Of Use Of Grant Or Contract Funds For Lobbying, Proposal Section VIII, Revision | 05/04/90 * |
Procedure for Soil Erosion and Sediment Control Design | 06/01/90 |
Procedure for Utility and Railroad Facility Relocations | 07/01/90 |
Revisions To FHWA Bid Attachments | 07/24/90 * |
Traffic Stripes On Freeway And Interstate Ramps | 08/08/90 |
Positioning Of Chain Link Fence At Drainage Ditches And Revisions To Standard Roadway Construction Detail CD-32 | 08/14/90 |
Comprehensive Fee Schedule | 09/17/90 * |
Materials Field Laboratory & Curing And Storage Facility | 11/15/90 |
Sawing And Sealing Joints In Bituminous Concrete Overlay | 12/14/90 |
Highway Section Submissions | 03/19/91 |
Proposal Attachments (Prop Attachments, State, Superseded by 11/8/1991) | 10/09/91 * |
Payment For Insurance | 06/25/92 |
Payment For Insurance, Federal Aid Estimates | 07/01/92 * |
Progress Schedule | 07/27/92 |
Construction Engineering Cost Estimates | 08/27/92 * |
Saw And Seal Joints, Bituminous Concrete Overlay (92073 IDU) | 11/24/92 + |
Soil Erosion And Sediment Control Report (92040 ADU) | 11/30/92 |
Fuel Price Adjustment (88016 ADU) | 01/21/93 |
Incentive/Disincentive For Early Completion (90122 ADU) | 01/28/93 |
Concrete Surface Course Joint Layout And Slab Dimensioning (92058 ADU) | 03/08/93 |
Asphalt Price Adjustment (92061 ADU) | 05/28/93 |
Certification Acceptance, Concurrence In Award Of Contract (93050 APC) | 08/19/93 * |
Broken Portland Cement Or Bituminous Concrete In Embankments (93025 ADU) | 10/14/93 |
Construction Contingencies (94002 ADU) | 02/04/94 |
Construction Contingencies (94003 APC) | 02/07/94 |
Rev. to Telephone Addendum Proc. & Pen & Ink Proposals (94008 APC) | 02/14/94 |
Traffic Fines Doubled In Work Area-Construction Sign (94024 ADU) Larger Size Sign | 05/03/94 |
Bulletin Board Implementation (94030 ADU) | 05/27/94 |
Soil Erosion And Sediment Control Revisions (93027 ADU) | 06/13/94 |
Access Control At Jughandles And Interchanges, And Driveway Reviews (93063 ADU) | 10/03/94 |
FHWA Review And Oversight Requirements (94091 ADU) | 11/28/94 |
Guide to Metrication (94077 ADU) | 12/15/94 |
Guide To Metrication 2 page update (95016 ADU) | 02/06/95 |
Optimum Asphalt Content (94056 ADU) | 04/11/95 |
Core Samples Concrete And Core Samples Bituminous (95039 ADU) | 05/30/95 |
Standards For CADD File Submissions (95063 ADU) | 08/23/95 |
Optimum Asphalt-Content-Revision (95069 ADU) | 08/28/95 |
Flexible Delineators (94028 ADU) | 10/31/95 |
Legend
Asterisk (*) denotes All Personnel Concerned (APC) memorandums or publications which are issued only to individuals or offices responsible for the review and processing of plans and specifications and for the preparation and the processing of other contract documents.
Plus sign (+) denotes In-House Design Units (IDU) memorandums or publications which are issued only to Department staff and outside agencies.
Instructions to Designers
Please purge your library of ADUs/ IDUs/ APCs to include only the 70 memorandums listed. They should all fit into a 75mm (3 inch) binder. Designers should also be downloading Baseline Document Change announcements, Quality Improvement Advisories and Corrective Action Notices from the NJDOT Bulletin Board and/or the NJDOT Web Page and updating their library of NJDOT documents accordingly. The web page and/or bulletin board should be checked at least twice a month to guarantee that the designers are using the latest documents.
Distribution to In-House Staff and Various Public Agencies
This BDC announcement file can be downloaded from the DOT web Page at http://www.state.nj.us/transportation/eng/documents/BDC/. Click on the BDC announcement of your choice. The download file is in a zip format. If you need an unzipping program, download and install the Winzip or PKzip program located at the bottom of the page.
This announcement along with the Index will be distributed to In-House staff and various Public agencies in accordance with the standard distribution list by the Document Control Unit. The hard copy distribution may be at least one month after the date of this announcement because of printing delays, so rely on the web for faster service. Please make additional copies as needed.
Hard copies of individual and superseded ADUs may be obtained by contacting:
Carol Paszamant
Research Librarian
E&O Building, 5th Floor
1035 Parkway Avenue, CN 600
Trenton, NJ 08625
Telephone: 609-530-5289
Fax: 609-530-2052
Distribution to other Outside Agencies (Consultants, Contractors, etc.)
This BDC announcement with Index list will be posted on the NJDOT's Electronic Bulletin Board System (BBS) under conference number 10 - "Highway Design", File Area 56 - "Baseline Document Change memorandums".
It can also be downloaded from the DOT web Page at http://www.state.nj.us/transportation/eng/documents/BDC/
. Click on the BDC announcement of your choice. The download file is in a zip format. If you need an unzipping program, click on the Winzip or PKzip program button located at the bottom of the page.
Hard copies of individual and superseded ADUs may be obtained by contacting the Research Librarian at the above address.
Recommended by:
Approved by:
Original signed by
Brian Strizki          Original signed by
Russell D. Tong          Brian Strizki Russell D. Tong Manager, Assistant Commissioner, Quality Services Capital Program Management