|
PROVISIONS
N.J.A.C 7:26-2A-9 (e) &(f) |
CLOSURE
COSTS |
POST-CLOSURE
COSTS |
i. |
Soil
Erosion and Sediment Control Plan |
|
NA |
ii. |
Final
Cover |
|
NA |
iii. |
Final
Cover Vegetation |
|
NA |
iv. |
Maintenance
Program for Final Cover and Final Cover Vegetation |
NA |
|
v. |
Maintenance
Program for Side Slopes |
NA |
|
vi. |
Run
On/Run Off Control Program |
|
NA |
vii. |
Maintenance
Program for Run On/Run Off Control Program |
NA |
|
viii. |
Groundwater
Monitoring Wells |
|
NA |
ix. |
Maintenance
Program for Groundwater Monitoring Wells |
NA |
|
x. |
Groundwater
Monitoring In Accordance with
N.J.A.C. 7:14A-1 |
NA |
|
xi. |
Methane
Gas Venting or Evacuation System |
|
NA |
xii |
Maintenance
Program for Methane Gas Venting or Evacuation System |
NA |
|
xiii. |
Lechate
Collection and/or Control System |
|
NA |
xiv. |
Maintenance
Program for Lachate Collection and/or Control System |
NA |
|
xv. |
Facility
Access Control System |
|
NA |
xvi. |
Maintenance
Program for Facility Access Control System |
NA |
|
xvii. |
Measures
to Conform the Site to Surrounding Areas |
|
NA |
xviii. |
Maintenance
Program for Site Conformance Measures |
NA |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL COSTS |
|
|