Public Notification & Outreach Frequently Asked Questions (FAQs)
Junuary 19, 2010 [Revised 28 July 2011]

NOTE: FAQ #33 has been revised.

The Questions

  1. Does the person responsible for conducting the remediation need to submit the Sensitive Population Checklist to the Department?
  2. Who is identified as the “the person responsible for conducting the remediation”?
  3. How do I find a Preferred ID (PI #)?
  4. How can I identify the case manager assigned to my case?
  5. Can a remediating party identify an outside party as the point of contact (i.e. attorney, consultant) to be posted on the sign, or identified in a letter and/or  fact sheet?
  6. Does the party responsible for conducting the remediation have to notify the current occupant(s)/tenant(s) of the site?
  7. If a site is very large, but the remediation is being conducted on a small section of the site, what does the Department consider to be the “site boundary”?
  8. How can a remediating party determine if a language other than English is predominantly spoken by property owners and tenants in the area within 200 feet of the property boundary?
  9. What documentation do I have to submit to the Department, if I decide to conduct public notification by sign?
  10. Is contact information for the Office of Community Relations required to be posted on all notification signs and/or identified in all notification letters or fact sheets?
  11. If the person responsible for conducting the remediation does not want to list an individual’s name as the point of contact on the sign, what alternatives are available?
  12. If the site has more than one case number or Preferred ID (PI#) number, are separate signs required, for each case number or PI number?
  13. If the remediating party chooses to provide public notice by sending notification letters, when should the letters be sent?
  14. Can notification letters be sent by using services provided by United Parcel Service (UPS) or Federal Express (FedEx)?
  15. When sending notification letters by certified mail or using the certificate of mailing service, is the remediating party required to submit return receipts to the Department?
  16. How can I identify tenants in an area?
  17. When is a remediating party required to prepare, distribute and publish a fact sheet?
  18. If contamination in ground water migrates from the property of the discharge and soil contamination is present only in on-site soils, does the fact sheet need to include information about the on-site soil contamination?
  19. The contaminant concentration(s) are required to be included in the fact sheet. How can I identify contaminant concentration(s) when there are multiple rounds of sampling events that have occurred over many years? Can I include classes of chemical contaminants, or must I identify each contaminant individually?
  20. Is the remediating party required to include a description of indoor air and soil gas contamination in the fact sheet?
  21. Is the remediating party required to distribute fact sheets to owners/tenants located within 200 feet of the site boundary or 200 feet of the ground water contamination plume?
  22. Can an abbreviated version of the fact sheet be used for publication purposes?
  23. What section of a newspaper should the fact sheet be published
  24. Publication of the fact sheet is required in how many newspapers?
  25. Publication of the fact sheet is required in how many issues of a single newspaper?
  26. Can you place a notification letter and/or fact sheet in an apartment building lobby, rather than send by mail?
  27. If multiple apartment buildings are located on a lot that is located within 200 feet of the site boundary, but only one of the apartment buildings is actually within 200 feet, is the remediating party required to send notification letters/fact sheets to all the tenants or just the tenants residing in the building that is located within 200 feet of the site boundary?
  28. Can a remediating party include additional language on notification signs or in notification letters and/or fact sheets?
  29. When can I propose an alternative plan?
  30. For sites that are being remediated under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or the Resource Conservation and Recovery Act (RCRA) is notification still required pursuant to N.J.A.C. 7:26E-1.4?
  31. Can I provide one document to satisfy more than one public notification requirement?
  32. For sites that have completed remedial action, but are currently awaiting review and the issuance of a No Further Action Letter (NFA), does the remediating party have to conduct public notification?
  33. If I am requesting the Department to establish a classification exception area (CEA) for ground water, do I have to comply with the public notification requirements at N.J.A.C. 7:26E-1.4 or the notification requirements associated with the CEA pursuant to N.J.A.C. 7:26E-8.3(b)5?
  34. If you have a Deed Notice with an NFA and you plan to disturb the engineering control (i.e. cap), do I have to comply with the Public Notification and Outreach rules?
  35. I am a property owner of an apartment building and I just discovered a leaking heating oil tank. Am I exempt from the public notification requirements?

The Answers

1. Does the person responsible for conducting the remediation need to submit the Sensitive Population Checklist to the Department?

No, the requirements associated with identifying and reporting sensitive populations and resources pursuant to N.J.A.C. 7:26E-1.4(f) have been deleted. The information that was required to be included as part of a sensitive population and resource checklist has been incorporated into the requirements associated with the receptor evaluation pursuant to N.J.A.C 7:26E-1.15 - 1.19 as part of the Special adoption of the Administrative Requirements for the Remediation of Contaminated Sites rule package available at: http://www.nj.gov/dep/srp/srra.

Back to the Questions

2. Who is identified as the “the person responsible for conducting the remediation”?

N.J.A.C. 7:26E-1.8 defines "person responsible for conducting the remediation" to include any person who executes or is otherwise subject to an oversight document, and any person who is performing the remediation or has control over the person (for example, contractor or consultant) who is performing the remediation, including, without limitation, an owner or operator who is subject to either Industrial Site Recovery Act (ISRA) or the Underground Storage Tank Rules.

Back to the Questions

3. How do I find a Preferred ID (PI #)?

A PI# is unique to each case. It can be found by using DEP Data Miner
(http://datamine2.state.nj.us/dep/DEP_OPRA/).

Back to the Questions

4. How can I identify the case manager assigned to my case?

The case manager can be identified, by using DEP Data Miner. From http://datamine2.state.nj.us/DEP_OPRA/OpraMain/
categories?category=Site+Case+sub-category
, select "Municipal Reports (All Sites)" from the list of SRP Municipal Reports. Enter the County and Municipality of the site of interest where prompted, and click OK. Find the site of interest and click on “Site Detail,” located under the “Site Activity Information” column. Another chart, entitled Site Detailed Report, should appear. Click on “Case Oversight Info” under the “More Info” column. Another chart, entitled “Case Oversight Report,” should appear, with a column labeled “Case Manager.”

Back to the Questions

5. Can a remediating party identify an outside party as the point of contact (i.e. attorney, consultant) to be posted on the sign, or identified in a letter and/or fact sheet?

Yes, the remediating party should identify the individual or firm that would be best able to answer inquiries about the site from the general public.

Back to the Questions

6. Does the party responsible for conducting the remediation have to notify the current occupant(s)/tenant(s) of the site?

Yes, public notification should be provided to current occupant(s)/tenant(s) of record.

Back to the Questions

7. If a site is very large, but the remediation is being conducted on a small section of the site, what does the Department consider to be the “site boundary”?

In most cases, the site boundary is easily identified as the block and lot on the municipal tax map. In cases where the remediation is being conducted on a small subsection of an extremely large site, the remediating party can request the Department to approve an alternative boundary for the purpose of public notification.

Back to the Questions

8. How can a remediating party determine if a language other than English is predominantly spoken by property owners and tenants in the area within 200 feet of the property boundary?

The Department anticipates that most remediating parties are already aware of whether a language other than English is predominantly spoken in the neighborhoods surrounding their sites. Common signs in another language can be an indication of an alternative language. If the person responsible for conducting the remediation is unsure whether property owners and tenants speak a language other than English, they may choose to contact the municipality for guidance and information.

Information about the percentage of people speaking languages other than English in a given area is available by accessing census information on http://factfinder.census.gov/home/saff/main.html. By entering a zip code of interest, one can access data on those who "Speak a Language Other than English at Home". You can either enter a specific address or find a link for a map under the "Social Characteristics" section. The map tool allows “zooming in” to a particularly area of town revealing census tract information in the vicinity of the site of interest. The information is based on 2000 Census data.

Back to the Questions

9. What documentation do I have to submit to the Department, if I decide to conduct public notification by sign?

You must submit a photograph of the sign and site information required pursuant to N.J.A.C. 7:26E-1.4(j)4, in both electronic/digital format and in hard copy.

Back to the Questions

10. Is contact information for the Office of Community Relations required to be posted on all notification signs and/or identified in all notification letters or fact sheets?

Contact information for the person responsible for conducting the remediation and the Licensed Site Remediation Professional should be included on notification signs and/or in notification letters and fact sheets. If there is no Licensed Site Remediation Profession include contact information for the person responsible for conducting the remediation and the Office of Community Relations.

Back to the Questions

11. If the person responsible for conducting the remediation does not want to list an individual’s name as the point of contact on the sign, what alternatives are available?

The person responsible for conducting the remediation can list the title of the point of contact for the site together with the name of the site. For example, one can list “Project Manager for the XYZ Chemical Company Site” on the sign, as the point of contact.

Back to the Questions

12. If the site has more than one case number or Preferred ID (PI#) number, are separate signs required, for each case number or PI number?

No, separate signs are not required; however, the point of contact for each PI# must be clearly stated on the sign, should they differ.

Back to the Questions

13. If the remediating party chooses to provide public notice by sending notification letters, when should the letters be sent?

If a remediating party chooses to provide public notice by sending notification letters, the regulations require letters to be sent at least 14 days prior to the initiation of field activities associated with the remedial investigation or remedial action and every two years of the remedial action. The remediating party should also send notification letters at least 14 days prior to the initiation of field activities related to the remedial action.

Back to the Questions

14. Can notification letters be sent by using services provided by United Parcel Service (UPS) or Federal Express (FedEx)?

Yes, notices sent pursuant to N.J.A.C. 7:26E-1.4 may be sent using UPS or FedEx. The remediating party should retain any documentation that the delivery service provides which lists all intended recipients.

Back to the Questions

15. When sending notification letters by certified mail or using the certificate of mailing service, is the remediating party required to submit return receipts to the Department?

When notification letters are sent using certified mail, return receipts are not required to be submitted to the Department. However, a remediating party should retain the return receipt(s) for their records, should they ever need to document that notification letters were sent. The United States Postal Service (USPS) certificate of mailing service does not provide the option of a return receipt. If the certificate of mailing service is used, the remediating party should retain any forms prepared for use by the USPS.

Back to the Questions

16. How can I identify tenants in an area?

You may choose to contact the property owners, the municipality, or the property management company associated with the property to identify tenants. You may also use the certificate of mailing service offered by the USPS. This service is not only more cost effective, but also allows the delivery of mail to “Current Resident”, if you are unable to identify individual tenants by name.

Back to the Questions

17. When is a remediating party required to prepare, distribute and publish a fact sheet?

A remediating party must prepare, distribute and publish a fact sheet two weeks after the determination that contamination has migrated off the property of the discharge. A remediating party also must update, redistribute and republish the fact sheet once the extent of the contamination has been delineated.

Back to the Questions

18. If contamination in ground water migrates from the property of the discharge and soil contamination is present only in on-site soils, does the fact sheet need to include information about the on-site soil contamination?

Yes, the remediating party is required to include information in the fact sheet about all contamination detected both on site and off site.

Back to the Questions

19. The contaminant concentration(s) are required to be included in the fact sheet. How can I identify contaminant concentration(s) when there are multiple rounds of sampling events that have occurred over many years? Can I include classes of chemical contaminants, or must I identify each contaminant individually?

For most sites, the range of contaminant concentration(s) should be listed in the fact sheet. Each chemical need not be identified in fact sheets for sites that have multiple contaminants, thus identifying classes of chemical contaminants is acceptable. For example, a fact sheet can list gasoline-related constituents including but not limited to benzene, toluene and methyl tertiary butyl ether. The Department recommends focusing on the contaminant or class of contaminants that is driving the cleanup.

The fact sheet must list all contaminants, by name, with the range of concentrations detected for each for sites with 10 or less contaminants. The remediation standard for each should also be included.

Back to the Questions

20. Is the remediating party required to include a description of indoor air and soil gas contamination in the fact sheet?

Yes, a brief description of indoor air or soil gas contamination detected should be included. Specific location information should not be listed in the fact sheet as individual property owners may not want this information widely distributed to the public.

Back to the Questions

21. Is the remediating party required to distribute fact sheets to owners/tenants located within 200 feet of the site boundary or 200 feet of the ground water contamination plume?

The fact sheet and any updates shall be sent to each owner and tenants located within 200 feet of the site boundary. However, the Department encourages remediating parties to distribute fact sheets to owners and tenants located within 200 feet of the ground water contamination plume.

Back to the Questions

22. Can an abbreviated version of the fact sheet be used for publication purposes?

Yes, a template for an abbreviated version of the fact sheet is available at http://www.nj.gov/dep/srp/guidance/public_notification/template_factsheet_general.doc. Please note, this abbreviated version should only be used for publishing in a newspaper. The complete fact sheet should be used when mailing to owners and tenants.

Back to the Questions

23. What section of a newspaper should the fact sheet be published?

The fact sheet may be published in any section of a newspaper, with the exception of the classified or legal sections.

Back to the Questions

24. Publication of the fact sheet is required in how many newspapers?

A fact sheet is required to be published as a display advertisement in one daily or weekly newspaper of general circulation in the vicinity of the site.

Back to the Questions

25. Publication of the fact sheet is required in how many issues of a single newspaper?

The fact sheet is not required for publication in more than one issue of the same newspaper.

Back to the Questions

26. Can you place a notification letter and/or fact sheet in an apartment building lobby, rather than send by mail?

No, a letter or fact sheet cannot be posted in an apartment building lobby in lieu of mailing. A remediating party may choose to post a letter or fact sheet in the lobby in addition to mailing.

Back to the Questions

27. If multiple apartment buildings are located on a lot that is located within 200 feet of the site boundary, but only one of the apartment buildings is actually within 200 feet, is the remediating party required to send notification letters/fact sheets to all the tenants or just the tenants residing in the building that is located within 200 feet of the site boundary?

Notification letters, fact sheets and any updates must be sent to each owner of all real property, as shown on the current municipal tax duplicate, and the tenants of those properties, located within 200 feet of the site boundary. Therefore, all tenants that reside in buildings that are located on a tax lot, which are within 200 feet from the site boundary, must receive notification.

Back to the Questions

28. Can a remediating party include additional language on notification signs or in notification letters and/or fact sheets?

Yes, a remediating party may add language in addition to the required language to a notification sign, letter, or fact sheet.

Back to the Questions

29. When can I propose an alternative plan?

The public notification rules allow for a proposed alternative plan to be submitted in lieu of posting a sign or sending notification letters. The Department will also consider an alternative plan in lieu of sending a fact sheet. The Department encourages remediating parties to submit an alternative plan for sites that have conducted adequate public notification before the rules were promulgated and for sites where an alternative method of public notification may better suit the community.

Back to the Questions

30. For sites that are being remediated under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or the Resource Conservation and Recovery Act (RCRA) is notification still required pursuant to N.J.A.C. 7:26E-1.4?

Yes, the notifications required pursuant to N.J.A.C 7:26E-1.4 are not intended to satisfy the public participation requirements applicable to Superfund sites subject to the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), the National Contingency Plan, or the Resource Conservation and Recovery Act (RCRA).

However, if the remediating party has fulfilled or is fulfilling their public participation requirements under CERCLA or RCRA, they may choose to submit a proposed alternative plan to the assigned case manager, listing the public participation activities that have been or will be conducted pursuant to CERCLA or RCRA. If the case manager determines that the proposed alternative plan provides adequate public notice and fulfills the intent of the N.J.A.C. 7:26E-1.4, the Department will provide a written approval.

Back to the Questions

31. Can I provide one document to satisfy more than one public notification requirement?

Yes, for example, if you choose to conduct public notification by letter and have determined that contamination has migrated off site, you may choose to send one fact sheet, and include all content requirements for both the letter and the fact sheet in one document. Please see the Guidance for Notification and Public Outreach Requirements Triggered by Determination that Contamination has Migrated Off-Site for information regarding the consolidation of documents at http://www.nj.gov/dep/srp/guidance/public_notification/offsiteguide/.

Back to the Questions

32. For sites that have completed remedial action, but are currently awaiting review and the issuance of a No Further Action Letter (NFA), does the remediating party have to conduct public notification?

No, a remediating party that is awaiting review and issuance of an NFA is not required to conduct public notification. However, if the report is deficient and the requested NFA is not issued, the remediating party may be required to conduct public notification pursuant to N.J.A.C. 7:26E-1.4.

Back to the Questions

33. If I am requesting the Department to establish a classification exception area (CEA) for ground water, do I have to comply with the public notification requirements at N.J.A.C. 7:26E-1.4 or the notification requirements associated with the CEA pursuant to N.J.A.C. 7:26E-8.3(b)5?

If, in addition to the CEA, other remedial activities are ongoing at the site, you must continue notification pursuant to N.J.A.C. 7:26E-1.4, either by maintaining the sign pursuant to N.J.A.C. 7:26E-1.4(i)3 or sending updated notification letters every two years to owners and tenants located within 200 feet of the site boundary pursuant to N.J.A.C. 7:26E-1.4(j)2 and 3. If off-site soil contamination is detected or off-site ground water contamination exists with no established CEA, you must also update, redistribute and republish the fact sheet pursuant to N.J.A.C. 7:26E-1.4(l)6.

If the CEA for remaining ground water contamination is the only remaining area of concern (AOC) at the site, you must comply only with provisions associated with N.J.A.C. 7:26E-8.3(b)5.

Back to the Questions

34. If you have a Deed Notice with an NFA and you plan to disturb the engineering control (i.e. cap), do I have to comply with the Public Notification and Outreach rules?

If you plan to disturb an engineering control (cap) on a site with a Deed Notice and an NFA, you are required to comply with the Public Notification and Outreach regulations if the disruption will exceed 60 days or if the disruption will result in a permanent change to the cap.

Back to the Questions

35. I am a property owner of an apartment building and I just discovered a leaking heating oil tank. Am I exempt from the public notification requirements?

Yes, remediation of all unregulated heating oil tank discharges are exempt from these requirements.

Back to the Questions