NJ Home   Services A to Z   Departments/Agencies FAQs
Great Seal of the State of New Jersey Lieutenant Governor Kim GuadagnoGovernor Chris Christie Great Seal of the State of New Jersey  
Search: NJ Home   NJDOT


Pavement & Drainage
Management and Technology


Ride Quality Requirements


Ride Quality Testing

The form below is for Resident Engineers who would like to request IRI Pavement Rideability testing.
*Signifies a Required Field
Resident Engineer Contact Information
*Name:
*Email Address:
*Cell Phone #: Ex: XXX.XXX.XXXX
*Office Phone #: Ex: XXX.XXX.XXXX
*Best Method for Contact: Email       Cell Phone       Office Phone       Any
*Best Hours for Contact: Between and
Project Information
*Official Project Name:
*Job Number:
*Prime/Paving Contractor:
Project Specifics
 
*Pavement/
Structure:
*Date
Constructed:
*Route:
*Direction:
*Milepost
*Lane ID:
*# of Paving Lifts:
*Surface Course Mix:
From:
To:
1.
2.
3.
Add another entry Add another entry
4.
Add another entry Add another entry
5.
Add another entry Add another entry
6.
Add another entry Add another entry
7.
Add another entry Add another entry
8.
Add another entry Add another entry
9.
Add another entry Add another entry
10.
  Note: You have reached the maximum allowed entries for this submission form (10). If you need to add additional
  entries, please submit this form and begin to complete a new form.
 
Additional Comments

  1. The Lane ID shall be determine by increasing numbers from left to right in the direction of traffic with the left lane being as Lane 1. (Please note Lane ID is not the total number of lanes. Since each lane will be tested separately, we need to know the exact beginning and end mile post limits of a lane).

  2. Include the beginning and end mile post limits of bridge decks etc within the requested IRI testing limits. Specify clearly, if any deck or pavement sections need to be excluded from IRI testing.

  3. Include all bridge decks, etc. within the requested IRI testing limits.

  4. Please specify clearly any change in Pay Adjustment equations that was issued, if any. Also, provide a reference for such changes.


    I confirm that I am the Resident Engineer for this project.

Due to limited resources and the amount of time needed to conduct multiple testing runs, testing will only be conducted on lanes with the full length of the lane paved. Requests for partial lane testing cannot be acted upon. Please request testing AFTER completion of paving the final riding surface of the project.

Once this information is received the project will be scheduled for Rideability testing on a "first come, first served" basis. Test scheduling is weather dependent, but generally within a few days of request. Resident Engineer will be notified of the proposed testing date to share with the contractor so they may arrange any necessary traffic control, sweeping of the project and retro reflective tape layout as needed prior to testing.

Clear the Form

Contact Us | Privacy Notice | Legal Statement & Disclaimers | Accessibility Statement  

 

  department: about NJDOT | NJcommuter | in the works | business | engineering | freight, air & water | capital | community | data | links | index
  statewide: NJ Home | about NJ | business | government | state services A to Z | departments

  Copyright © State of New Jersey, 2002-2014
  Department of Transportation
  P.O. Box 600
  Trenton, NJ 08625-0600
OPRA - open public records act

  Last Updated:  October 16, 2013