New Jersey Natural Gas (NJNG) Long Branch Plant Site UpdateLong Branch, Monmouth County
1) Long Branch Plant Red Brick Building Atlantic Plumbing and Supply Company (ASPC) In May 2006, NJNG submitted a revised RAWP that consolidates the plans for the APSC property, the on-site portion of Troutmans Creek and the remainder of the former MGP site into a single RAWP. This approach enables NJNG to bid these remedial actions as a single scope of work without affecting the September 2006 start date. NJDEP has reviewed the revised RAWP and plans to issue written comments in September 2006. On-Site Portion of Troutmans Creek Soil Gas Investigation Ground Water Investigation
NJNG is required to submit an RIWP to address items 2 and 3 in November 2006 2) Off-Site Portion of Troutmans CreekNJNG submitted a Draft Ecological Risk Assessment (ERA) Work Plan in March 2006 that outlined proposals for tasks that include, but are not limited to conducting a benthic community survey, sediment toxicity testing, and sediment sampling for analysis of site-related contaminants. NJDEP issued a conditional approval for the ERA Work Plan in May 2006. NJNG conducted the first sampling event in June 2006 and will perform the second one in September 2006. NJNG submitted a Draft RAWP for Troutmans Creek in March 2006. NJDEP reviewed the Draft RAWP and CCC’s comments on this document and issued a comment letter on August 3, 2006. NJDEP advised NJNG in the comment letter that it must first complete the ERA and delineate soil and product contamination in the creek before submitting a revised RAWP for this area. The revised RAWP for the off-site portion of Troutmans Creek is due in April 2007. 3) Off-Site Residential AreasNJDEP issued an RIR in February 2006 that summarized its findings of the soil sampling it conducted on Long Branch Avenue, Seaview Avenue, Ellis Avenue and Grant Court. The results of the soil investigation revealed that two shallow samples collected from beneath the pavement on Ellis Avenue contained semi-volatile organic compounds and a metal at levels exceeding NJDEP’s soil cleanup criteria. It also revealed that two deep soil samples (collected more than six feet below grade) at Grant Court contained semi-volatile organic compounds and metals above NJDEP’s soil cleanup criteria. In addition, one surface soil sample near a dumpster in the Grant Court housing development contained arsenic above NJDEP’s soil cleanup criteria. The Long Branch Housing Authority (LBHA) placed gravel over the area near the dumpster and installed a temporary fence around it. LBHA received NJDEP approval for its sampling plan to complete the soil delineation for Grant Court and conducted the sampling in April 2006. LBHA submitted an RIR and RIR Addendum to NJDEP in May 2006 and June 2006, respectively. NJDEP issued its approval of these documents in August of 2006. The approval letter confirmed that the contamination in this area was adequately delineated and requested that LBHA submit a RAWP to address the contamination. NJDEP expects to receive the RAWP in late summer or early fall of 2006. 4) Seaview ManorNJNG submitted a Revised RAR for Block 400, Lot 7 in January 2006 and SRWM reviewed numerous aspects of the Revised RAR during February and March 2006. Based on its review, SRWM has worked closely with the Land Use Regulation Program to resolve issues related to the CAFRA permit for the new Seaview Manor. These efforts have allowed the contractor to resume construction of the housing units. NJDEP issued a conditional approval of the Revised RAR in April 2006. NJNG submitted an RAR for the remainder of the LBHA properties and adjacent properties in February 2006. NJDEP reviewed the RAR and CCC’s comments on the submittal and issued a comment letter on August 18, 2006. NJDEP is requiring NJNG to submit a RIWP with proposals to delineate newly identified soil contamination at Block 400, Lot 6, an RAR Addendum to address several deficiencies in the RAR, as well as several revised deed notices. The RIWP Addendum is due in late 2006 and NJDEP is recommending that NJNG integrate the RAR Addendum for this area into the RAR Addendum for the culvert area, which is due in January 2007. Culvert Status Related InformationLBHA Activities LBHA also submitted a RAWP for Block 400 Lot 7 in February 2006 that details plans for installation the storm water and sanitary sewer lines. NJDEP issued a conditional approval of the RAWP in May 2006. This work was completed in August of 2006, along with decontamination of the sheet piling installed within Troutmans Creek. NJDEP expects to receive an RAR documenting all of these activities in October 2006.
|
![]() |
![]() |
To report an environmental
incident impacting NJ, call the Toll-Free 24-Hour Hotline |
![]() |
Contact DEP | Privacy Notice | Legal Statement & Disclaimers | Accessibility Statement |
||
Site Remediation Program: SRP
Home | About SRP |
Search | Help Copyright © State of New Jersey, 1996- |