NJ Home   Services A to Z   Departments/Agencies FAQs
Great Seal of the State of New Jersey
NJDOT Site Index  |  Search: NJ Home   NJDOT
Disclaimer  
Great Seal of the State of New Jersey

  Procurement


Phone: 609.530.2452

 

Professional Services
Question and Answer
For Current Technical Proposals


E-mail question(s) to the attention: Manager of Professional Services, Procurement. Specify "TP # 077 question" in subject line.

Questions will be accepted up to question cut-off date noted in the technical proposal.

Technical Proposal


TP-077

Question 1: On the first page of Part A, Solicitation, it says 2015 Bridge Preventive Maintenance Contract.

In Part B, Evaluation Criteria, it says 2015 Maintenance Bridge Painting Contract.

Answer 1: It is “2015 Bridge Preventive Maintenance Contract” in Part B, Evaluation Criteria instead of 2015 Maintenance Bridge Painting Contract.

Question 2: Part 2 Section 1B – Please clarify for the option of NICET II and 2 years Bridge CI, does Bridge CI experience gained prior to the date of the NICET II qualify towards the mandatory 2 years?

Answer : Yes.

Question 3: Section 10 – Additional Experience is stated as “Road/Bridge Construction Inspection and Minimum of 2 years Bridge Construction Inspection” - What is the maximum number of years for total road/bridge construction inspection experience that will be considered for additional years of similar experience?

Answer 3: The requested type of experience under Section 10 for the additional years is changed for Bridge Inspectors (1) and (2) to “2 years Road/Bridge Construction Inspection and 1 year Bridge Construction Inspection”.

Question 4: Since the federal ESBE requirement for this solicitation is 12.49%, does one of the two inspectors resumes in the proposal have to be from a DBE or ESBE firm, or can the DBE/ESBE key staff be listed in Section 2 instead and a different inspector be listed as the second inspector?

Answer 4: Yes, one of the two inspectors resumes in the proposal have to be from a DBE or ESBE firm.

Question 5: Project describes "Forty-Nine (49) Bridges on Route I-295" for Painting, however, staff requirement is only from March 2016 thru Dec. 2016. Not sure if it was meant to be Dec. 2017?

Answer 5: Project description is "Forty-Nine (49) Bridges on Route I-295" are for Preventive Contract. Staff requirement is from March 2016 thru Dec. 2016.


Question 6: Is NACE certificate not required for at least one of the Inspector, with NICET3, to support NJDOT staff?

Answer 6: No.

Question 7: How about SSPC and HAZPOWER-Not required?

Answer 7: SSPC and HAZPOWER are not required. It is a Preventive Contract.

Question 8: No minimum Paint Experience is required?

Answer 8: Paint Experience is not required.

Question 9: TP067 is pending selection. Please provide clarification - For TP077, if a firm proposes same staff that is proposed for TP067 (Pending selection), how will this be treated in scoring key staff or should the firm put a statement of any kind?

Answer 9: If the Personal used on subsequent TP – and firm selected for initial TP, will be disqualified from subsequent TP unless letter of explanation is forwarded with alternate team. Please refer to the link of

http://www.state.nj.us/transportation/business/procurement/ProfServ/documents/MicrosoftWord-PERSONNELAVAILABILITY.PDF



 
Go to NJDOT home page Contact Us | Privacy Notice | Legal Statement | Accessibility Statement  Go to State of New Jersey home page
  department: home | about | NJ commuter | in the works | business | engineering | freight, air & water | capital | community | data | links | index
  statewide: NJ Home | about NJ | business | government | state services A to Z | departments

  Copyright © State of New Jersey, 2002-2020
  Department of Transportation
  P.O. Box 600
  Trenton, NJ 08625-0600
OPRA - open public records act

  Last Updated:  November 25, 2015