Department of Transportation

Construction Procedures Handbook

These files are in PDF format. You will need Adobe Acrobat Reader to view the PDF files which is available at our state Adobe Acrobat Access page.


Section/Title
(File sizes from 13k to 2.3m unless otherwise indicated)
Effective Date
Section I: General Information
Subsection A: The Construction Procedures Handbooks and Construction Advisories (Revised)
07/31/2023
Subsection B: Work Organization Number, Job Numbers and Activity Code 06/19/2012
Subsection C: Organization of Division of Construction & Materials (Revised)
12/27/2022
Subsection D: Responsibilities and Authority of Construction Personnel 01/06/2014
Subsection E: Departmental Policies and Procedures (Revised)
05/28/2019
Subsection F: Interaction with Entities and Individuals 07/18/2012
Subsection G: Litigation Hold 05/01/2019
Subsection H: Construction Inspection Quality Assurance (Revised)
10/31/2022
Subsection I: GPS Monitoring of State Vehicles 06/24/2020
Subsection J: State Issued Equipment 04/18/2023
Section II: Project Scoping to Contract Award
Subsection A: Constructability- Risk Analysis Workshop/ Team Reviews 01/21/2020
Subsection C: Environmental Permit Review 08/07/2012
Subsection D: Pre-Bid Meetings (Rescinded)
10/25/2012
Subsection E: Formal Notice of Project Assignment (Revised)
07/09/18
Section III: Construction Start Up
Subsection A: Preconstruction Conference (Revised)
06/24/2024
Subsection B : Office Procedures Index 10/17/2022
Subsection B-1: File System Index and Correspondence Log 01/20/2018
• Subsection C : Construction Reference Material and Forms (Rescinded)
05/16/06
Subsection D: Insurance Certification (DC-175) (Revised)
06/01/2016
Subsection E: Emergency Contracts & Accelerated Start-up 08/08/2022
Subsection F: Project Safety and Traffic Control 05/15/2023
Subsection G: Progress Schedule and Project Progress 12/19/2022
Subsection D-1: Performance Bond and Payment Bond 12/05/2011
Subsection H: Construction Field Office, Materials Field Laboratory and Curing Facility (Revised)
05/23/2023
Subsection I: Subcontracting Documentation (Revised)
10/03/2018
Subsection J: Temporary Structures/Facilities on NJDOT Construction Projects 08/16/2022
Subsection K: Construction Start Notice 08/15/2022
Subsection L: ITS Pre-Construction Meeeting (Revised)
12/1/2016
Subsection M: Environmental Permit Notifications 09/17/2012
Section IV: Construction Changes
Subsection A: Changed Field Conditions (Revised)
01/30/2023
Subsection A-1: Foreign Materials Requirements (Buy American) (Revised)
1/29/2024
Subsection B: Construction Orders 09/13/2022
Subsection C: Claims and Contractual Notice (Revised)
06/05/2018
Subsection D: Default and Termination of Contract 08/16/2022
Subsection E: Federal Project End Date (Revised)
03/25/2021
Section V: Construction Affirmative Action
Subsection A: Contractor's Compliance with Labor, EEO, and Training Requirements (Revised)
09/06/2022
Subsection B: ESBE/DBE and SBE Program Implementation (Revised)
04/11/2017
Section VI: Construction Operations
Subsection A-1: Project Reviews at 70%-90% Construction Completion (Rescinded)
04/26/2012
Subsection A-3: Biweekly Project Meeting 11/15/17
Subsection A-4: PrePaving Meeting (Revised)
12/20/2018
Subsection A-5: Pre-Deck Concrete Construction Meeting 09/12/2022
Subsection A-6: Pre-Concrete Surface Course Construction Meeting 09/30/2022
Subsection A-7: Mid Contract Meeting 09/06/2022
Subsection A-8: Environmental Meeting 12/05/2022
Subsection A-9: Drilled Shaft Review Meeting 10/04/2022
Subsection A-10: Pre-Erection Meeting 11/01/2022
Subsection B: Right-Of-Way 1/29/2023
Subsection C: Environmental Support 11/29/2022
Subsection C-1: Pollution Control System (Containment Plan, Waste Disposal Plan, Lead Health and Safety Plan (LHASP) and Equipment Storage Plan) (Revised)
09/19/2022
Subsection D : Bridge Painting and Structural Steel Paint System Information Form (Rescinded)
1/23/2024
Subsection E: Damage by a Public Traffic Accident 01/30/2018
Subsection F: Fuel Price Adjustment (Revised)
06/18/2024
Subsection F-1: Truck Weight Monitoring (Revised)
08/12/2016
Subsection F-2: Concrete Bridge Deck and Concrete Bridge Approach Surface Acceptance Testing (Revised)
07/22/2016
Subsection F-3: Quality Control and Quality Assurance Moisture Content on Sand in Inertial Barrier Modules (Rescinded)
05/17/2011
Subsection F-4: Quality Controls and Quality
Assurance Inspection Anchor Bolts
(Rescinded)
05/11/2011
Subsection F-5: Value Engineering Submissions (Revised)
04/08/2024
Subsection F-6: Quality Control and Quality Assurance Raised Pavement Marker Coordinator (Rescinded)
05/17/2011
Subsection F-7: Negative Haunch 06/29/2018
Subsection F-8: Quality Control and Quality Assurance Landscape Inspection 05/8/2019
Subsection F-9: Project Supervisor Field Inspection Report Form (DC-152) 01/28/2013
Subsection F-10: National Bridge Inspection Requirements, NJDOT Structure Reporting and Unnumbered/Unknown Structures 12/10/2012
Subsection F-11: Temporary Traffic Stripes and Markings 11/02/2022
Subsection F-12: Concrete Site Testing by Construction Personnel 3/07/2023
Subsection F-13: Quality Control and Quality Assurance Contractor's ACI Certified Inspectors (Rescinded)
03/25/2011
Subsection F-14: Asphalt (HMA) Coring and Air Void and Thickness Pay Adjustments (Revised)
01/31/2019
Subsection F-15: Asphalt Price Adjustment 10/02/2018
Subsection H: Traffic Signal Maintenance, Turn On   and Acceptance 09/16/2016
Subsection I: Tort Claims
(Revised)
10/07/2024
Subsection K: Utility Coordination (Revised)
04/30/2024
Subsection L: Processing Consultant Inspection Invoices (Revised)
01/12/2018
Subsection M: Contractor's Performance Evaluation Form (DC-83) (Revised)
01/12/2024
Subsection M-1: Consultant Evaluation System (Revised)
01/04/2024
Subsection N: Monthly Estimate (Revised)
03/11/2019
Subsection O:Advance Traffic Impact Notices and Lane Closure Requests (Revised)
05/22/2024
Subsection Q: Vertical Under-Clearances and Lane Width Restrictions (Revised)
09/05/2017
Subsection R: Materials Payment and Storage 03/15/2016
Subsection S: Materials Questionnaire, Materials Certification, Materials Inspection and Delivery Tickets - Examples (Revised)
10/16/2024
Subsection T: Sampling Emulsified Asphalt for Microsurfacing, Slurry Seal, Tack Coat and Prime Coat (Revised)
09/10/2019
Subsection U: Ride Quality Acceptance Testing (Revised)
08/03/2018
Subsection V: Office Plans (Revised)
01/08/2024
Section VII: Construction Completion
Project Completion and Closeout Flowchart 05/15/2006
Subsection A: Project Completion and Acceptance Examples (Revised)
06/24/2024
Subsection A-1: PARTIAL ACCEPTANCE
 
(Revised)
1/16/2019
Subsection B: Project Closeout Workbook  Examples (Revised)
06/30/2016
Subsection C : Close-Out Meeting 12/27/2022
Subsection D: Materials Certification, Credit for Failing Samples and Form LB-95A 12/12/2022
Subsection E: Acceptance Testing for Concrete Strength 8/15/2023
Subsection G-1: Asbuilt Pavement Database Implementation (Revised)
01/06/2017
Subsection H-1: Asbuilt Item Records - Examples (Revised)
05/8/19
Subsection H-2: Asbuilt Plans (Revised)
08/15/2024
Subsection H-3: Regional Construction Stormwater Report (Revised)
05/23/2023
Subsection I: Storage of Materials From Completed or Terminated Construction Projects for use on Future Construction Projects 03/14/2023
• Subsection J: Procedure for Closeout of Construction Work Under Developer Agreements (Rescinded)
2/5/2016
Subsection K: FHWA Final Acceptance
(Federal Participating Contract Agreement Closeout)
(Revised)
12/19/2022
Subsection L: Retention and Storage of Construction Records (Revised)
12/18/2018
Section VIII: Work Zone Safety
Subsection A: Responsibilities of NJDOT Employees and the Person Performing the Daily TCP Inspection (Revised)
09/18/2019
Subsection B: Responsibilities for Project Site Injury/Fatality and Traffic Accident
(Revised)
8/20/2020
Subsection C: Responsibilities of the Person Performing the Daily Traffic Control Plan Inspection
12/20/2022
Subsection D: Work Zone Traffic Control Type “A”-NJ State Police, Type “B” Municipal Police, Type “C” Trained Flagger
(Revised)
06/09/2020
Subsection E: Functions of Office of Capital Project Safety
10/10/2019
Subsection F: EXTENSION OF ALLOWABLE LANE CLOSURE HOURS 12/12/2019
Subsection G: Illuminance Testing and Visibility Requirements During Night Operations 3/07/2023


Last updated date: September 10, 2024 9:48 AM